• Title/Summary/Keyword: 소결 CaO 펠렛

Search Result 4, Processing Time 0.016 seconds

An Effect of $Al_{2}O_{3}$ on the Reaction between Molten Converter Slag and CaO pellet (용융전로(熔融轉爐)슬래그와 CaO펠렛의 상호반응(相互反應)에 미치는 $Al_{2}O_{3}$의 영향(影響))

  • Kim, Young-Hwan;Ko, In-Yong
    • Resources Recycling
    • /
    • v.15 no.2 s.70
    • /
    • pp.3-9
    • /
    • 2006
  • As a basic study on the conversion of molten converter slag to the ordinary portland cement, the effects of $Al_{2}O_{3}$ addition on the interface reaction between solid CaO and molten converter slag has been studied. Alumina added converter slag whose basicity was controlled to 1 and 2 was melted and hold for 30 minutes in MgO crucible at $1500^{\circ}C$. Then sintered CaO pellet heated at the same temperature was dipped into the molten slag and held for 30minutes. After the reaction, the crucible was cooled in air and the specimen was cut off to the horizontal direction of the crucible. The dissolution rate of CaO pellet with the addition of $Al_{2}O_{3}$ was measured by the change of the radius or sintered CaO pellet and the interface layer was observed by SEM/EDX. As a result. At the basicity 2 slag, thickness of created $C_{3}S$ layer increased 3.5 times and quantity of $C_{6}AF_{2}\;or\;C_{4}AF$ phase increase 2 times than baisicy 1 slag.

Interface Reaction of Molten Converter Slag and Sintered CaO Pellet (용융 전로슬래그와 소결 CaO 펠렛 사이의 계면반응)

  • Kim Yaung-Hwan;Ko In-Yang
    • Resources Recycling
    • /
    • v.13 no.1
    • /
    • pp.47-53
    • /
    • 2004
  • As a basic study of the re-using molten converter slag as an ordinary portland cement by conversion process, molten slag and sintered CaO pellet was reacted each other. The dissolution rate of the sintered CaO pellet into the molten slag was measured and the changes of the reaction layer was also investigated. The converter slag reagent-grade $SiO_2$ added was melted and hold for 30 minutes in MgO crucible between $1350∼1500 ^{\circ}C$. Then sintered CaO pellet heated at the same temperature was dipped into the molten slag and hold for 10∼30 min. After the reaction, the crucible was cooled in air and the specimen was cut off to the horizontal direction of the crucible. The dissolution rate of CaO pellet was measured by the change of the radius of sintered CaO pellet and the interface layer was observed by SEM/EDX and XRD. The dissolution rate of sintered CaO pellet contacted with the slag of basicity 1 was 9.8 $\mu\textrm{m}$/min at $1350^{\circ}C$ and increased to 18.0 $\mu\textrm{m}$/min at $1500^{\circ}C$. The rate was slightly decreased to 7.6 $\mu\textrm{m}$/min at $1350^{\circ}C$ and 15.0 $\mu\textrm{m}$/min at $V^{\circ}C$ in the slag of basicity 2. The dissolution rate of CaO in converter slag was followed to the rule of Arrhenius' temperature dependency, and the apparent activation energy of the dissolution of CaO was 36 kcal/mole. In case of the slag basicity of 1, the thickness of $C_2$S layer was 64-118 $\mu\textrm{m}$ and the thickness of $C_3$S was 28∼90 $\mu\textrm{m}$ for 10∼30 minutes at $1500^{\circ}C$. And the thickness of the $C_3$S layer was 90∼120 $\mu\textrm{m}$ at the same conditions in the slag basicity of 2.

The Interface Reaction Between Molten Converter Slag and $C_3A(3CaO{\cdot}Al_2O_3)$ Pellet (용융전로(熔融轉爐)슬래그와 $C_3A(3CaO{\cdot}Al_2O_3)$ 펠렛사이의 계면반응(界面反應))

  • Kim, Young-Hwan;Ko, In-Yong
    • Resources Recycling
    • /
    • v.14 no.5 s.67
    • /
    • pp.13-17
    • /
    • 2005
  • As a basic study for recycling molten converter slag as an ordinary portland cement (OPC) by a conversion process, the reaction mechanism and the rate of the formation of $C_4AF$ which is one of the main components of OPC were investigated. The converter slag whose basicity was controlled by adding reagent grade $SiO_2$ was melted and hold for 30 minutes in MgO crucible at $1300^{\circ}C{\sim}1350^{\circ}C$. Then, the sintered CaO pellet heated at the same temperature was dipped into the molten slag and hold for $10{\sim}30$minutes. After the reaction, the crucible was cooled in air and the specimen was cut off to the horizontal direction of the crucible. The dissolution rate of $C_3A$ pellet was measured by the change of radius of the sintered $C_3A$ pellet, and the formed phase of $C_4AF$ was observed by SEM/EDX. As a result, the dissolution rate of $C_3A$ pellet into molten slag was increased from $0.75{\times}10^{-4}(cm/sec)$ at $1300^{\circ}C$ to $1.67{\times}10^{-4}(cm/sec)$ at $1350^{\circ}C$, and the mixed layer of $C_4AF$ and $C_{12}A_7$ was found between slag and $C_3A$ pellet.

An Electrochemical Reduction of TiO2 Pellet in Molten Calcium Chloride (CaCl2 용융염에서 TiO2 펠렛의 전기화학적 환원반응 특성)

  • Ji, Hyun-Sub;Ryu, Hyo-Yeol;Jeong, Ha-Myung;Jeong, Kwang-Ho;Jeong, Sang-Mun
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.10 no.2
    • /
    • pp.97-104
    • /
    • 2012
  • A porous $TiO_2$ pellet was electrochemically converted to the metallic titanium by using a $CaCl_2$ molten salt system at $850^{\circ}C$. Ni-$TiO_2$ and graphite electrodes were used as cathode and anode, respectively. The electrochemical behaviour of $TiO_2$ pellet was determined by a constant voltage control electrolysis. Various reaction intermediates such as $CaTiO_3$, $Ti_2O$ and $Ti_6O$ were observed by XRD analysis during electrolysis of the pellet. Once $TiO_2$ pellet was converted to a porous metallic structure, the porous structure disappeared by sintering and shrinking with increasing the reaction time at high temperature.