Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort are variable according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differ from project to project. This paper suggests the criteria for effort allocation in planning, specifying, building, testing and implementing phase followed by the project total effort. These criteria are derived from 183 different projects. This result can be considered as a practical guideline in management of project schedule and effort allocation.
신정부가 출범하면서 ICT는 타 산업과의 융합으로 새로운 일자리를 창출하는 창조경제 실현의 핵심수단으로 부상하고 있으며, 장기적으로는 저출산, 고령화, 산업 전반의 패러다임 변화, 생태계 중심 경쟁구조 재편 등 새로운 국가 수요의 해결 수단으로 주목 받고 있다. 본고에서는 급변하는 ICT 산업과 기술, 그리고 국가적 미래 수요에 대응하기 위해 미래창조과학부가 향후 5년간 ICT 분야 연구개발(R&D)의 방향을 제시하고 이에 기반한 새로운 기술 및 서비스 개발을 위한 추진전략을 담고 있는 "ICT R&D중장기 추진전략"의 주요 내용 및 세부 추진계획을 소개한다.
The development projects subject to health impact assessment (HIA) in the current environmental impact assessment (EIA) system are limited to some projects under Article 12 of the Enforcement Decree of the Environmental Health Act (Additional Assessment Objects Subject to Health Impact Assessment Items), but health impact-related matters are being evaluated and reviewed during consultation. In particular, when a development site is planned around some pollutant sources in a residential development plan, it is evaluated and reviewed whether the site meets the risk criteria through a current concentration survey of major hazardous air pollutants. This study prepared a quantitative method to confirm the validity of the location of the residential area to be developed in the residential development plan and proposed a plan to expand the project subject to HIA within the EIA procedure. A detailed methodology was proposed by reviewing the screening and scoping procedures of the EIA system, and a case analysis of the urban development plan discussed in the past was conducted to verify the methodology.
Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort varies according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differs from one project to another. This paper suggests models for effort allocation in planning, specifying, building, testing and implementing phases followed by the project size and development types. These models are derived from 155 different projects. Therefore, these models can be considered as a practical guideline in management of project schedule and effort allocation.
Proceedings of the Korea Water Resources Association Conference
/
2005.05b
/
pp.497-501
/
2005
근래 들어 도시화로 인한 물순환 파괴를 근본적으로 연구하고 이를 정상화하기 위한 체계적이고 통합적인 유역관리 기술이 요구되고 있다. 유역통합관리의 이론을 실제로 적용한 계획을 세우기 위해서는 Heathcote(1998)가 제안한 다음과 같은 단계별 절차를 수행하는 것이 바람직하다. 단계별 절차는 (1) 대상유역에 대한 정보수집, (2) 문제점 도출, (3) 분명한 목적 수립, (4) 대안의 구성, (5) 대안의 검토, (6) 대안의 효과분석, (7) 최종계획 수립으로 이루어져 있으며 본 연구에서는 3단계의 과정에 해당된다. Heathcote(1998)는 대안의 선정과 평가를 위한 방법으로 단순평가방법(simple assessment method)과 세부평가방법(detailed assessment method)으로 구분하였는데 본 연구에서 수행한 내용은 단순평가방법에 해당된다. 본 연구는 안양천 유역에서 물순환 건전화의 핵심을 건천화 방지로 판단하고 이를 위한 대안을 크게 지표수, 지하수, 대체수자원 분야로 구분하여 제시하였다. 지표수 분야의 경우 구조적인 대안으로 소규모 저수지의 개발, 타유역에서의 도수, 보를 이용한 수량 확보, 우오수분리벽을 이용한 상류유출수의 확보, 저협수로 형성, 하천바닥에 차집관로 매설 방지 및 차집관로 유지관리 등이 있으며 비구조적인 대안으로는 기존 저수지의 유지용수 공급을 위한 운영, 유수지의 다목적 활용, 하천수 직접취수 제한 등이 있다. 지하수 분야의 대안으로는 지하철 용출수의 재이용, 지하수의 과다이용 제한, 침투증진시설의 설치 등이 있으며 대체수자원 분야의 대안으로는 하수처리수를 고도처리하여 유지용수로 재이용하는 것, 중소규모 하수처리장의 상류 설치, 대규모 사업장의 폐수를 고도처리하여 활용하는 것, 상수도의 이용 등이 있다. 이러한 여러 가지 대안들은 Walesh(1989)가 제안한 절차에 따라 기술가능성(technical feasibility), 경제성(economical efficiency), 환경성(environmental feasibility) 등을 정성적으로(qualitatively) 파악하여 실현가능한 대안을 선정하였다. 이렇게 선정된 대안들은 중유역별로 검토하여 효과가 있을 것으로 판단되는 대안들을 제시하는 예비타당성(Prefeasibility) 계획을 수립하였다. 이렇게 제시된 계획은 향후 과학적인 분석(세부평가방법)을 통해 대안을 평가하고 구체적인 타당성(feasibility) 계획을 수립하는데 토대가 될 것이다.
Kim, Tae Heum;Park, Sun Hwan;Hwang, Sang Il;Yang, Jihoon;Lee, Jai-Young;Hwang, Joung Bae
Journal of Environmental Impact Assessment
/
v.25
no.1
/
pp.51-62
/
2016
Recently, soil has been recognized as a crucially important resource that even can change the quality of life. Also, recent studies have gradually mentioned the importance of assessing soil impact induced by development plans and projects. In this study, after detailed soil assessement items were selected from our national environmental policies and international agreements, they were tested for the long-term dam construction planning in order to ensure more suitable implementation of strategic environment assessment(SEA). We found that soil resources can be impacted by diverse factors such as soil erosion, soil organic matters, soil moving, soil biodiversity, and others. Such detailed factors are found to be overlapped with the pervious EIA factors. Accordingly, additional studies would be required for finding out more reasonable connection between assessment factors during any SEA progress.
Proceedings of the Korea Water Resources Association Conference
/
2008.05a
/
pp.1924-1928
/
2008
우리나라 지하수 관리 정책의 기조는 지속가능한 미래 청정 지하수의 체계적인 보전 및 관리 기반을 강화하는 것이다. 이를 위해 지하수의 지속적인 조사, 관측 및 체계적인 개발, 이용이 이루어지도록 추진중에 있다. 한편, 현재 우리나라의 지하수 개발가능량은 10년빈도 갈수시 소유역의 연간 함양량으로 정하고 있으며 이와 같은 기준은 1996년 지하수 관리 기본계획시 정해진 기준이다. 현재 우리나라의 지하수 함양량 산정은 기저유출분리법, 물수지 분석법, 지하수위 강하곡선법, 분포형 수문모형기법 중 한 가지를 사용하도록 기초조사 지침에 명기되어 있으며 함양량으로부터 개발가능량을 추론하고 있는 실정이다. 그러나 대부분의 결과는 주로 유역 규모의 연단위 대표 함양량을 추정하는 데 주안점을 두고 있어 개정지하수법 6조 2항에 의해 시군구 단위에서 수행하는 지역 지하수 관리 계획 수립과 같은 세부계획에는 활용이 어려운 것이 사실이다. 따라서 본 연구에서는 분포형 지표수-지하수 결합모형인 SWAT-MODFLOW 모형을 이용하여 10년 빈도 갈수년에 해당하는 함양량으로부터 시군구별 개발가능량을 산정하고 이를 지역의 이용수량과 비교하여 과부족을 평가할 수 있는 방안을 제시하였다.
Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software effort estimation models are present only the total effort and effort (or manpower: people per unit time) function for the software life-cycle. Also, Putnam presents constant effort rate in each subcycles. However, the size of total efforts are variable according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in subcycle also differ from project to project. This paper suggests the linear and polynomial effort estimation models in specifying, building and testing phase followed by the project total effort. These models are derived from 128 different projects. This result can be considered as a practical guideline in management of project schedule and effort allocation.
Proceedings of the Korea Water Resources Association Conference
/
2011.05a
/
pp.450-450
/
2011
최근 유역의 급속한 도시화, 농업의 근대화, 홍수로 인한 수해 증가, 극심한 홍수, 물이용 형태의 변화, 수질 오염 등 하천관련 다양한 문제가 제기되고 있으며, 물 관련 정보화를 추진하기 위하여 유역조사를 통한 수문 및 하천 정보의 기초자료 관리 체계를 구축하고 있다. 이를 기반으로 유역에 대한 수자원 현황을 평가하고 국가수자원계획의 정책지표로서 활용할 수 있는 통합지수들을 사용하고 있다. 지표 및 지수를 통해 한 분야를 평가하기 위해서는 객관적인 관측 값 또는 기초자료들 중에서 현상을 잘 기술해줄 수 있는 대표적인 값들을 선별하여 표준화를 거치고 각각의 세부지표들을 통합하는 과정에서 가중치를 부여한다. 기존 수자원관리를 위해 개발된 지표 및 지수에 사용된 가중치 방법은 동일가중치 방법이나 전문가들의 설문조사를 통한 계층분석법(AHP) 등이 주로 활용되었다. 본 연구에서는 지표 및 지수개발에 있어 사용되는 가중치 산정방법에 대해 알아보고 각 세부지표나 대리변수 사이의 가중치 산정방법에 따른 평가결과의 변화와 결과에 미치는 영향을 분석하여 가중치 부여 방식에 따른 지수변화의 민감도 분석을 실시하였다.
This paper aims to create standard forms of MRV plan and report, used when policy funds are applied in accordance with ESCO regulations, when energy savings are measured (the savings would be generated as energy users and ESCOs signed the contract of guarantee for energy savings, and energy saving facilities are installed following the contract). To fully reflect the goals and effects of the installation of energy saving facilities, MRV plans and reports will be completed for the purposes of measuring, verifying, and reporting if the goals of energy savings have been achieved successfully. In this paper, the forms of MRV plans and reports were developed with the detailed descriptions for each form and instructions of completion. Based on the developed forms of MRV plans and reports, future studies need to developed guidelines to explain how to fill out these forms considering the application cases by ESCO technology and facility.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.