• Title/Summary/Keyword: 성능발주방식

Search Result 14, Processing Time 0.029 seconds

A Study about Improvement Idea for Performance-based Project Delivery system (성능발주방식의 개념 정의 및 활용방안에 관한 연구 - 공동주택 성능표시 제도를 바탕으로 한 발주자를 위한 체크리스트 -)

  • Lee, Ha-Seung;Baek, Hun-Ku;Shin, Seung-Ha;Lee, Jung-Won;Kim, Kyung-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.634-637
    • /
    • 2008
  • Performance-based Project Delivery System(PPDS) is one of Project Delivery System that when owner ask for performance than constructor feel free to choose materials, technology, an engineering method. PPDS rank higher position than Performance Warranty Contract and Technical Proposal Bid. This study aims to propose Improvement Idea for PPDS that based Housing Performance Grading Indication System. 'Request-performance Checklist' is used as communication means(between owner and constructor) and a kind of corroborative facts make the procedures achievement of project like contract easier.

  • PDF

Evaluation on Performance Level of Design-Build and Design-Bid-Build (Focused on Bridge Construction Projects) (발주방식에 따른 성능수준 평가에 관한 연구)

  • Cho, Kyu-Man;Kim, Hee-Wook;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.75-83
    • /
    • 2007
  • Recently, the Design-Build (DB) delivery method in public sector makes some argument by reason of the initial cost which is more higher than those of Design-Bid-Build (DBB). According to the results of pervious researches related to the performance evaluation of delivery method, DB can lead the reduction of project cycle time and also is superior to the traditional DBB in terms of construction quality. The performance on each delivery method could be generally evaluated by a project cost and a project cycle time as one of quantitative analyses, and also by construction quality as one of qualitative analyses. In most researches, the evaluation of performance level based on delivery methods has been evaluated by the degree of their satisfaction through the interview with owners. Therefore, this paper analyzed the design documents of construction projects delivered by traditional DBB and DB in bridge construction projects in order to measure design quality, constructability, maintainability, and etc. As an above-mentioned analyses, finally, this research shown that how much the difference of performance level is by each delivery method.

A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

A Study on the Selection Method of Project Procurement System based on Owner's Requirement (발주자의 요구사항을 고려한 발주방식 선정 방법에 관한 연구)

  • Nam, Hye-Won;Ahn, Kyung-Hwan;Kim, Chang-Gyo;Lee, Jea-Sauk;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.126-135
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

An Analysis of Operation and Considerations for the Introduction of Performance Warranty Contracting (해외 성능계약제도의 운영현황 및 국내 도입시 고려사항 제시)

  • Cho, Su-Kyung;Seo, Yong-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.446-449
    • /
    • 2007
  • For the restoration of construction industry, the government have offered the policy since the end of 1990. It has offered to develop the world-class technology and establish the effective production structure. In the government policy, the delivery and contracting method has improved so that construction industry could be recognized. Foreign countries have conducted the R&D and application of Innovative Contracting for improvement of facilities, reduction of LCC and innovation of contractor. Among the Innovative Contracting, 'Performance Warranty Contracting' is defined that A guarantee of the integrity of a product and of the makers responsibility for the replacement or repair of deficiencies. Performance Warranty Contracting is used for technology developments of contractor, improvement of quality, reduction of LCC, prevention of early deficiencies and reduction of owner's inspection works. This paper analyzes concept and effects of Performance Warranty Contracting and presents considerations according to the introduction.

  • PDF

A Study on the Performance Certification System of Inspection and Diagnostic Equipment for Infrastructure using Advanced Technologies (첨단기술을 이용한 시설물 점검 및 진단장비 성능인증체계에 대한 연구)

  • Hong, Sung-Ho;Kim, Jung-Gon;Cho, Jae-Young;Kim, Do-Hyoung;Kim, Jung-Yeol;Kim, Young-Min;Lee, Dong-Wook
    • Journal of the Society of Disaster Information
    • /
    • v.17 no.1
    • /
    • pp.97-111
    • /
    • 2021
  • Purpose: It is expected that various infrastructures diagnosis equipment will be needed as infrastructures management is strengthened to implement the Framework Act on Sustainable Infrastructure Management. It is necessary for a certification system to supply certified products of a reasonable level in accordance with market requirements for various convergence equipment. This paper deals with the introduction of certification system of inspection and diagnosis equipment for infrastructure using advanced technologies. Method: The basic elements, systems and procedures of certification system were reviewed through analyzing and comparing the existing similar certification system in Korea. In addition, a survey was conducted on a catalog method and the minimum performance criterion (sampling survey and complete enumeration survey) to equipment developers (manufacturers), clients and equipment users. Result: This survey showed that clients preferred complete enumeration method on the basis of minimum performance, and equipment users also preferred complete enumeration survey and sample survey, for minimum performance, at a similar rate. On the other hand, equipment developers preferred the catalog method. Conclusion: Clients and users who are the users of the diagnostic equipment preferred the minimum performance criterion because their trust in quality is important. On the other hand, developers(manufacturers) preferred the catalog method which adopts self certification because it is regulated in developing various products. There is no specific plan for the minimum performance standards required for the introduction of the method which users demand, at present. In addition, it is not desirable to force to introduce a certification system because it requires a considerable period of study to prepare the specific standards. Therefore, it is appropriate to operate the system for a certain period of time centering around the catalog method for the stable and continuous development of the infrastructure diagnosis and test equipment market in Korea. Also, it is effective to expand and develop the certification system to the extent that it minimizes the impact on the market when specific plans for the standards are prepared in the future.

유연 생산 시스템에서의 최적 버퍼 할당과 다른 요소와의 상호관계에 관한 연구

  • 이용균;김경섭
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.05a
    • /
    • pp.101-105
    • /
    • 2001
  • 본 연구는 유연 생산 시스템에서 버퍼 할당 최적화 알고리즘을 제시한다. 기존의 연구들과는 달리 제안된 알고리즘은 시스템의 복잡성과 Combinatorial특성을 모두 다를 수 있다. 알고리즘은 시뮬레이션을 사용하여 시스템의 복잡성을 모델링하고 수정된 유전 알고리즘을 사용하여 Combinatorial특성을 다루며 버퍼를 최적으로 시스템에 할당하게 한다. 제안된 알고리즘은 첫 번째 제한된 버퍼가 있는 상황에서 시스템 Output을 최대화하는 목적함수를 사용하여 최적 버퍼할당을 찾아내는 것과, 두 번째 원하는 Output을 달성할 수 있는 최소의 총 버퍼 수와 할당을 찾아내는 두 가지 목적함수에 적용된다. 마지막으로 유연 생산 시스템의 성능을 결정짓는 다른 요소들과의 관계를 살펴보기 위해 무인 운반 시스템의 발주방식과 무인 운반차의 수 등을 변화시켜 실험을 수행하고 그 결과를 분석한다.

  • PDF

Directions to Introduce Warranty Contraction for Pavements in Korea (도로포장 성능보증(Warranty)계약제도 도입방향)

  • Kim, Tae-Song;Koo, Jai-Dongl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.987-990
    • /
    • 2007
  • Warranty contracting is contracting methods that European Countries have applied to asphalt pavement projects from long ago, and in America as the expected effects of the warranty contracting are being verified to introduce it, the number of projects with warranty is being increased rapidly. In Japan, the warranty contracting suitable for Japanese style was established and is being applied. This study investigated and analyzed the present state of the warranty contracting being applied to European countries, America and Japan, and suggested advantages and disadvantages in introducing the warranty contracting into Korea and directions to introduce it. The principal result of this study is that performance bond contract system, performance surety bond system and performance bidding system should be established to introduce the warranty contracting into Korea.

  • PDF

Performance-Oriented Procurement Process and VE/PSC for Private Finance Initiatives (민간투자사업의 성능중심적 발주방식 및 PSC의 활용방안)

  • Lim Jong-Kwon;Park Heung-Min;Jung Kun-Ho;Woo Ji-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.51-58
    • /
    • 2004
  • The input-oriented project promotion system private participation in infrastructure projects currently in use in Korea has encountered difficulties in securing the primary benefits of private sector creativity problem solving and inflow of private capital. As such, the performance (or output)-oriented procurement process implemented in England and other developed countries should be evaluated for introduction. In Korea, private participation projects are currently identified as either solicited or unsolicited projects, each with different promotional procedures, the problem with these procedures is that competition is not pre-activated, the private sectors creativity is under utilized, and the rationality of project evaluations is inconsistent. Korea should, in order to raise the level of private sector creativity and efficiency, go beyond the currently applied Input Specification project promotion system to a Performance-oriented system similar to those implemented in England and other countries. To achieve this, we mate several proposals for the introduction of the performance-oriented system. We divide the main features of our proposals into three categories, including a reformed concessionaire selection system, a performance orientation in preparation of the concession agreement, and a performance orientation in contract management, and discuss each. 1'his study describes performance-oriented promotion systems in an output-focused way As this is an initial study on the introduction of performance orientation in private participation, various key points and proposals were identified. However, in the future, detailed research in technical fields and systems, legal research, and practical projects will be needed for implementation

  • PDF