A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector - (현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로-)

  • Chung Myung-Woo;Lee Hwa-Young;Seo Yong-Chil;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2001
  • Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.

  • PDF

A Study on the Analysis of Change Order - Claim in Design-Build (설계시공 일괄입찰공사에서 설계변경 클레임요인의 분석에 관한 연구)

  • Lee, Sang-Beom;Hwang, Jae-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.301-304
    • /
    • 2006
  • The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful solutions in detail concerned with the main factor of Change Order-Claim by each D/B phases through practical sorting and analysis of the causes of Change Order-Claim.