Study for Progress Rate of Standard Deviation of Irregularity Based on Track Properties for the Railway Track Maintenance Cycle Analysis (궤도 유지보수 주기 예측을 위한 구간 특성에 따른 궤도틀림 표준편차 진전정도 분석)

  • Jeong, Min Chul;Kim, Jung Hoon;Lee, Jee Ha;Kang, Yun Suk;Kong, Jung Sik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • 제16권3호
    • /
    • pp.31-40
    • /
    • 2012
  • The irregularity of railway track affects not only the comfort of ride such as noise or vibration but also the safety of train operation. For this reason, it is an interesting research area to design a reliable and sustainable railway track system and to analyze the train movement mechanism based on systematic approaches considering reasons of track irregularity possible in a specific local environment. Irregularity data inspected by EM-120, an railway inspection system in Korea includes unavoidable incomplete and erratic information, so it is encountered lots of problem to analyse those data without appropriate pre-data-refining processes. In this research, for the efficient management and maintenance of railway system, progress rate of standard deviation of irregularity is quantified. During the computation, some important components of railways such as rail joint, ballast, roadbed, and fastener have been considered. Probabilistic distributions of irregularity growth with respect to time are computed to predict the remaining service life of railway track and to be adapted for the safety assessment.

Experimental Evaluation of Prestress Force in Tendons for Prestressed Concrete Girders using Sensors (계측 센서를 활용한 PSC 거더 텐던의 긴장력 측정 실험)

  • Shin, Kyung-Joon;Park, Young-Ung;Lee, Seong-Cheol;Kim, Yun Yong;Lee, Hwan-Woo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • 제28권6호
    • /
    • pp.715-722
    • /
    • 2015
  • The prestressing force has not been managed after construction nevertheless it is one of the importrant factors that maintain the structural safety of PSC girder bridges. The prestressing force is just measured during construction using jacking device and after that, it can not be managed practically. For this reason, this study investigated the measurements of prestress using embedded sensors that can be available now with an ultimate goal to propose smart prestressed girders that can measure the prestress from the birth to the end of service life. 4 types of sensors were installed on the small prestressed girders, and the applicability and the accuracy of those sensors were tested while the prestress was applied to the girders. The results show that a center-hole type loadcell has a tendency to measure a prestressing force higher than a reference value, especially when it is loaded with an eccentricity. a EM sensor shows several advantages that has a good practical accuracy, that can be installed anyplace along the tendons.

A Study on University Student's Recognition Type for Student Records: Focused on Chonnam National University (학생기록물에 대한 대학생의 인식 유형 연구 - 전남대학교를 중심으로 -)

  • Kang, Hye-Ra;Chang, Woo-Kwon
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • 제28권3호
    • /
    • pp.95-123
    • /
    • 2017
  • This study brings up that further studies on the perceptions of university students should be conducted for efficient management of student records. Moreover, the Q methodology is used to identify subjective recognition (Q1) type related to the importance of student records and subjective perception (Q2) of student records type. For this purpose, I carried out questionnaires and interviews with eight students by each grade at Chonnam National University. As a result, Q1 type was derived from Collective Evidence type, Independent activity type, Democratic witness type, and achievement-oriented type. The type of Q2 is derived from Historical Value of Community Type, Personal Possession Type, Historical Expert Management Type, Value for Historical Practical Use Type, and Non-historical Preservation Type. Based on the research results, the following are suggested: First, the management of student records is needed in a way that encompasses various records of various records properties. Second, the management of student records should be established from the perspective of the Community Archives. Third, a strategic measure for the preservation of student records produced by students is necessary (e.g., a campaign for conservation of student records).

Factors Affecting the BIM Acceptance of Construction Managers (건설사업관리자의 BIM 수용에 영향을 미치는 요인 연구)

  • Chung, Yongche;Chin, Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • 제16권3호
    • /
    • pp.11-23
    • /
    • 2015
  • Construction Management(CM) and Building Information Management(BIM) have a lot in common that they need to establish a cooperation system among different disciplines and promote smooth communication among project stakeholders throughout the project life-cycle. BIM can be an effective information management tool for CM's business and improve their service value. However, BIM uses by Construction Managers(CMr) are very limited. The objective of this study is to analyze the intention of CMrs to adopt BIM and establish effective BIM use strategy in the CMr's point of view. This study utilizes Technology Acceptance Model(TAM) as a research method, and the results show that 1) CMrs think it is more important whether BIM is required to be adopted in their business process at the social or industry level than that BIM can improve their personal competence, recognition, and impressions through their voluntary BIM adoption; 2) that CMrs think it is important to figure out business processes where BIM can be smoothly incorporated; and 3) that CMrs hesitate the use and trial of BIM in their realworld business although they agree that BIM needs to be eventually adopted in their business in the future. Based on these results, directions for establish a strategy for BIM adoption were proposed at the CMr's point of view

Critical Success Factors for Wind Power Projects (풍력 발전소 프로젝트의 핵심성공요인)

  • Lyou, An-Suck;Kim, Byung-Il;Kim, Hyoung-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • 제13권1호
    • /
    • pp.140-147
    • /
    • 2012
  • Climate changes caused by fossil fuel energy usages have led to serious environmental damages and resource scarcity. Ever-increasing demand for energy causes harsh competition in international energy markets. Nuclear power, which once was regarded as a desirable clean energy, began to face public oppositions after the Japanese nuclear disaster in 2011. In this context, wind power is now considered to be an ever-more important recyclable energy source. Thus, this study intended to identify critical success factors for wind power construction projects. After a thorough literature review, two focus group interview sessions were conducted. A questionnaire-based survey, coupled with the two previous methods, resulted in the extraction of important factors for the success of wind power projects. Experts, including those working as constructors, designers, and owners, were paid a direct visit for the interview and survey. The critical success factors were categorized into feasibility study, right policies, equipment selection, and project financing issues. The proposed critical success factors are expected to be an effective guideline for future investors in wind powers.

The Present Status and Vision of Virtual Construction System Development (가상 건설 시스템 개발 현황과 비전)

  • Kim, Jae-Jun;Choi, Cul-Ho;Shin, Hyun-Mok;Jin, Sang-Yoon;Lee, Kwang-Myung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.170-175
    • /
    • 2008
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

CM Prospects and Strategies Based on Contract Statistics : 1997 through 2014 (CM산업 수주실적 분석을 통한 CM기업의 발전 방안 - 1997년 ~ 2014년 실적자료 기반 -)

  • Ha, Jiwon;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • 제17권5호
    • /
    • pp.97-107
    • /
    • 2016
  • CM services have been focused on the advancement of the CM industry and expansion to overseas market based on CM capabilities. However, there has been lack of quantitative and comprehensive research to investigate current CM trends and prospects for improving competitiveness. In this sense, the purpose of this study is to statistically analyze total of 3,453 CM service contracts over the past 18 years (between 1997 and 2014) in term of market type, contract size, owner's type, commodity type. Finding of this research reveal that 1) compared to 2005, CM market size in 2015 increased as much as 2.5 times, and that 2) domestic CM projects count for 87.5%, architectural project 88.4%, less than 1 billion won small contracts 75%, respectively. Also, recently as CM company are developing capability and competitiveness, 1) overseas CM market share has grown up to 20% among total CM contract amount, and 2) CM contracts by private owners has increased 3 times demanding the total management services based on high technical capability. Additionally, the result of this paper supports the growth path model proposed by Jung et al. (2014), where a path from Domestic Public (DP3) and Domestic Private (DC2) CM projects towards the expansion to International Private (IC5) contracts was quantitatively analyzed. Implications for other practical issues are also briefly discussed.

Remodeling Process Model Applying Service Life and Functionality Evaluation for Military Facilities (내용연수와 기능성 평가를 활용한 군 시설물 리모델링 대상 선정 프로세스 모델)

  • Cho, Jongwoo;Lee, Hyun-Soo;Park, Moonseo;Kim, Jaegon;Moon, Hyo-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • 제16권6호
    • /
    • pp.41-52
    • /
    • 2015
  • The number of military facilities has been rapidly increased due to growing requirement of modernization and military welfare. However, adequate maintenance has not implemented to these facilities. As a result, they are deteriorated quickly and require performance enhancement treatments. There are two ways of performance enhancement, reconstruction and remodeling. Despite the research result that remodeling within the standard remodeling range is more economical, remodeling of military facilities is not considered equivalent to reconstruction as an option of performance improvement. Therefore, derived from the relationship between performance change during life cycle of building and range of remodeling needs, this study tries to propose Remodeling Process Model(RPM) which uses a method to choose remodeling in a Specific Point of Time(SPT) when remodeling is considered more economical than reconstruction. In addition, this study suggests practical service life and functionality evaluation standard together which require to realize the RPM. This RPM make it possible to avoid the cases that facilities which do not have any problem on structural reliability but have low level of functionality miss appropriate remodeling timing and inevitably choose reconstruction as a performance improvement option. It also present the possibility of simple reconstruction / remodeling decision-making for facility managers who administrate building having various type, compilation and elapsed time. Consequently, this process model focusing on remodeling more may contribute to reduce resource waste caused by reconstruction.

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • 제8권4호
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

Correlation Analysis of Load-carrying Capacity by Safety Inspection Indicators in Bridges (교량 안전점검 지표별 내하성능 상관관계 분석)

  • Jung, Kyu San;Seo, Dong Woo;Kim, Jae Hwan;Cho, Han Min;Park, Ki Tae;Shin, Yeon-Woo
    • Journal of Korean Society of Disaster and Security
    • /
    • 제15권3호
    • /
    • pp.89-99
    • /
    • 2022
  • Bridges are a key infrastructure that underpins economic and social activities. In Korea, bridges began to be built with economic development in the 1970s and were built intensively in the 1980s and 1990s. In recent years, as the number of bridges with a service life of more than 30 years is increasing, continuous maintenance is required to ensure the safety of the bridges. In particular, in order to cope with the aging of bridges, research on technology development such as maintenance using ICT technology, preventive maintenance, life cycle cost reduction, and long life bridge is being actively promoted. This paper presents the results of correlation analysis based on the safety evaluation data of bridges as part of the research on the development of a model for estimating load-carrying capacity of bridges. As a analysis result, indicators highly correlated with the load-carrying capacity of the bridge was derived.