• Title/Summary/Keyword: 생애주기 관리

Search Result 387, Processing Time 0.03 seconds

A Strategy for Building BIM+PMIS System (BIM+PMIS 시스템 구축 전략)

  • Yoon, Su-Won;Chin, Sang-Yoon;Shin, Tae-Hong;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.61-67
    • /
    • 2008
  • BIM has been increasingly deployed to the construction industry in order to minimize ambiguity and to reduce errors of the communicated engineering information, for which poor communication due to fragmented industrial structure is mainly responsible. Known BIM use cases and related researches are focusing either (1) on a specialized solution for a given specialty area (e.g. structural engineering planning and early design, material take-off, constructability simulation, etc.), or (2) on handling interoperabillty issues with Industrial Foundation Classes (IFC); Neither of these approaches have sufficiently catered for collaboration and information management in actual construction projects. This paper proposes the strategy for BIM+PMIS (project management information system) system focused on improving PMIS which has been commercially provided with ASP(Application Service Provider). It also describes the architecture of the BIM-based information management module prototype, which is a key component of the BIM+PMIS system.

  • PDF

On the Improvement of the Preliminary Feasibility Study for the System Development Program (체계개발 연구사업의 사전타당성 조사 개선 방향)

  • Kim, Jae-Gon;Kim, Dong-Guen;Jun, Hong-Bae
    • Journal of Korea Technology Innovation Society
    • /
    • v.18 no.4
    • /
    • pp.641-666
    • /
    • 2015
  • Recently, it becomes more important to carry out the feasibility study on government R&D projects since the amount of R&D funds increases. For this purpose, until so far the general framework on the preliminary feasibility study for government driven research projects has been built and modified, and well applied to several domains. However, there is still the limitation in applying the method of preliminary feasibility study to system development research projects. The system development research projects have many different features compared to general research projects, for example, long-period development, lots of stakeholder involvement, multi-disciplinary works, and so on. Considering these characteristics, it is necessary to improve the method for the preliminary feasibility study. In this vein, this study deals with looking into the improvement points of the preliminary feasibility study in terms of the application of the system development projects.

An Exploratory Study of Professionalism on Data Management Jobs in the Public Sector: From the Perspective of Library and Information Science (공공부문 데이터 관리직무의 전문성에 대한 탐색적 연구 - 문헌정보학 관점에서 -)

  • Heejin, Park;Ji Sung, Kim
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.56 no.4
    • /
    • pp.491-514
    • /
    • 2022
  • Public reforms based on New Public Management have made the public sector specialized, and accordingly the role of public administration has expanded as well as the demand on professional jobs has increased. On the other hand, with the rapid development of information and communication technology, the data produced by public sector organizations has also significantly increased. This environmental changes made data management and a data management job in the public sector critical. However, there have been very few studies of conceptualizations and systematic investigations on data management jobs. Moreover, specific definitions, types or qualifications of/for a data management job or a person who do this job are rarely reflected in relevant laws and regulations. Based on the systematic literature review, this study conceptualized professionalism, identified its multiple dimensions, and draw a conceptual research framework. Focusing on the professional control on personnel management which is one of the dimensions of professionalism, relevant laws, work guidelines and job descriptions included in job openings were analyzed with regard to a data management job in the public sector. The findings are as follows. First, an assigned role and responsibility associated with a data management job have vague boundaries. Second, work guidelines and manuals only focus on the post quality control stage rather than equally addressing all the eight stages of the data lifecycle. Third, neither a data management job in the public sector nor a person who take care of this job is not appropriately defined. Therefore, a role and responsibility of/for the job and a person in charge should be reflected in the relevant laws and guidelines in a tailored way. More importantly, job analyses and evaluations should be thoroughly conducted to enhance professionalism on data management jobs in the long term.

Development of BIM for a Maintenance System of Subway Infrastructures (지하철 구조물 유지관리 시스템을 위한 BIM 개발)

  • Shim, Chang-Su;Kim, Seong-Wook;Song, Hyun-Hye;Yun, Nu-Ri
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.6-12
    • /
    • 2011
  • BIM(Building Information Modeling) technologies are the most effective for the maintenance of infrastructures because they provide information sharing througout the life-cycle of structures and support close communication between different project stages. Systematic and well-organized data play a fundamental role for the effective maintenance of subway tunnel. In this paper, 3D information models for maintenance of BIM-based subway tunnel structures are developed. Standard classifications for the maintenance and construction information classification system were adopted. A classification system based on construction information classification system was built considering procedures of maintenance work. It provides optimization and standardization of the work flow for the maintenance of subway structures by applying information modeling processes instead of the current maintenance practices. It can effectively reduces the life cycle cost and time for the maintenance. The proposed system can be utilized for the maintenance history management to enhance current maintenance system.

Development of Network Level Management System of Road Facilities Based on the Asset Management Concept (자산관리개념을 접목한 네트워크 방식의 도로시설물 유지관리시스템 개발)

  • Ji, Seung Gu;Seo, Jong Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.4
    • /
    • pp.146-154
    • /
    • 2011
  • Recently, the paradigm of social infrastructure investment has been changed from new construction to maintenance and management. As a consequence, the management and maintenance system of existing highway facilities needed an innovation involving the concept of asset management. This paper discusses the new facility management system suitable to local highway agencies. The new system incorporates asset management concept so that it can analyze the network level facility management solution and it can also improve the budget efficiency for local government. This paper also presents systematic method to integrate various facilities for management system.

A Study on the Problem and Improvement of Safety and Maintenance Management (국내 안전 및 유지관리의 문제점 및 개선방안에 관한 연구)

  • Kim, Sun Woong;Ahn, Kye Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.4 s.56
    • /
    • pp.101-106
    • /
    • 2009
  • In order to build an effective management system for structures and to propose national policy and vision for advance of safety and maintenance management, 'Fundamental Scheme of Safety and Maintenance Management for Structures' has been established and promoted. As developed countries adopt preventive maintenance management, which is preventive as well as aggressive repair/strengthening for structures, it is needed to introduce life-cycle analysis method for improvement of economical efficiency. Therefore, this paper presents not only analysis of domestic conditions and problems related to system for safety and maintenance management, policies and costs for structures but an improvement plan.

Prediction of UDPSC Bridge's Maintanence Cost based on Life Cycle Cost Analysis (LCC 분석에 기초한 UDPSC 교량의 유지관리비 예측에 관한 연구)

  • Shim, Bo-Hyun;Lee, Heung-Chol;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.638-641
    • /
    • 2006
  • In this paper, A calculating cost method of maintenance and repair for bridge which is built up by new construction technique named Up-Down Precast Concrete(UDPSC). After 2000, 109 Bridges which are using UDPSC technique have been built up, 37 bridges's construction work are processing, and 194 designs are presented for construction. Because this technology has developed recently, there are few field data for analyzing the maintenance and repair cost. Therefore, the maintenance and repair cost is computed using Construction and Transportation Ministry's guide line for computation and former research's data.

  • PDF

IETM (Interactive Electronic Technical Manual) for Urban Regeneration (도시재생사업에서의 전자매뉴얼)

  • Yu, Jung-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.74-81
    • /
    • 2008
  • Urban Regeneration has an object to restore a function of urban through physical/cicumstance, social lift/culture, industrial/economic regeneration. It has characteristics like existence of a lot of projects, complextity of stakeholders' structure, long period of project life cycle to achieve variety of project's promotion strategy. To accomplish a Urban regeneration that has above characteristics successfully, information about other projects should be managed organically. And it should provie information linked up with each projects by integrated management. We need a decision making method that helps users cope with requirements of change during project, and offers information when each users need to make a decision timely. So I propose a strategy to build the IETM considering urban regeneration characteristics.

  • PDF

A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase (시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구)

  • Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-455
    • /
    • 2002
  • Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).

  • PDF

An Approach on Life Cycle Based Efficiency Measurement in Construction Industry (건설 생산의 Life Cycle을 고려한 효율성 측정방안)

  • Jung Soon-Oh;Yoon Su-Won;Chin Sangyoon;Kim Yea-Sang;Park Ji-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.608-611
    • /
    • 2004
  • Efficiency of the construction process is one of the most important factors to project success. However efficiency is not well defined or measured in construction projects in general. More importantly, efficiency of the construction should be viewed through the life-cycle of the whole production system not in a single phase of the construction process. Therefore, this study defines the concept of efficiency and suggests the efficiency measurement model in construction. As a case study, the suggested model was applied to the curtain wall construction process of the high rise buildings as well.

  • PDF