Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.61-67
/
2008
BIM has been increasingly deployed to the construction industry in order to minimize ambiguity and to reduce errors of the communicated engineering information, for which poor communication due to fragmented industrial structure is mainly responsible. Known BIM use cases and related researches are focusing either (1) on a specialized solution for a given specialty area (e.g. structural engineering planning and early design, material take-off, constructability simulation, etc.), or (2) on handling interoperabillty issues with Industrial Foundation Classes (IFC); Neither of these approaches have sufficiently catered for collaboration and information management in actual construction projects. This paper proposes the strategy for BIM+PMIS (project management information system) system focused on improving PMIS which has been commercially provided with ASP(Application Service Provider). It also describes the architecture of the BIM-based information management module prototype, which is a key component of the BIM+PMIS system.
Recently, it becomes more important to carry out the feasibility study on government R&D projects since the amount of R&D funds increases. For this purpose, until so far the general framework on the preliminary feasibility study for government driven research projects has been built and modified, and well applied to several domains. However, there is still the limitation in applying the method of preliminary feasibility study to system development research projects. The system development research projects have many different features compared to general research projects, for example, long-period development, lots of stakeholder involvement, multi-disciplinary works, and so on. Considering these characteristics, it is necessary to improve the method for the preliminary feasibility study. In this vein, this study deals with looking into the improvement points of the preliminary feasibility study in terms of the application of the system development projects.
Journal of the Korean Society for Library and Information Science
/
v.56
no.4
/
pp.491-514
/
2022
Public reforms based on New Public Management have made the public sector specialized, and accordingly the role of public administration has expanded as well as the demand on professional jobs has increased. On the other hand, with the rapid development of information and communication technology, the data produced by public sector organizations has also significantly increased. This environmental changes made data management and a data management job in the public sector critical. However, there have been very few studies of conceptualizations and systematic investigations on data management jobs. Moreover, specific definitions, types or qualifications of/for a data management job or a person who do this job are rarely reflected in relevant laws and regulations. Based on the systematic literature review, this study conceptualized professionalism, identified its multiple dimensions, and draw a conceptual research framework. Focusing on the professional control on personnel management which is one of the dimensions of professionalism, relevant laws, work guidelines and job descriptions included in job openings were analyzed with regard to a data management job in the public sector. The findings are as follows. First, an assigned role and responsibility associated with a data management job have vague boundaries. Second, work guidelines and manuals only focus on the post quality control stage rather than equally addressing all the eight stages of the data lifecycle. Third, neither a data management job in the public sector nor a person who take care of this job is not appropriately defined. Therefore, a role and responsibility of/for the job and a person in charge should be reflected in the relevant laws and guidelines in a tailored way. More importantly, job analyses and evaluations should be thoroughly conducted to enhance professionalism on data management jobs in the long term.
BIM(Building Information Modeling) technologies are the most effective for the maintenance of infrastructures because they provide information sharing througout the life-cycle of structures and support close communication between different project stages. Systematic and well-organized data play a fundamental role for the effective maintenance of subway tunnel. In this paper, 3D information models for maintenance of BIM-based subway tunnel structures are developed. Standard classifications for the maintenance and construction information classification system were adopted. A classification system based on construction information classification system was built considering procedures of maintenance work. It provides optimization and standardization of the work flow for the maintenance of subway structures by applying information modeling processes instead of the current maintenance practices. It can effectively reduces the life cycle cost and time for the maintenance. The proposed system can be utilized for the maintenance history management to enhance current maintenance system.
Journal of the Korea institute for structural maintenance and inspection
/
v.15
no.4
/
pp.146-154
/
2011
Recently, the paradigm of social infrastructure investment has been changed from new construction to maintenance and management. As a consequence, the management and maintenance system of existing highway facilities needed an innovation involving the concept of asset management. This paper discusses the new facility management system suitable to local highway agencies. The new system incorporates asset management concept so that it can analyze the network level facility management solution and it can also improve the budget efficiency for local government. This paper also presents systematic method to integrate various facilities for management system.
Journal of the Korea institute for structural maintenance and inspection
/
v.13
no.4
s.56
/
pp.101-106
/
2009
In order to build an effective management system for structures and to propose national policy and vision for advance of safety and maintenance management, 'Fundamental Scheme of Safety and Maintenance Management for Structures' has been established and promoted. As developed countries adopt preventive maintenance management, which is preventive as well as aggressive repair/strengthening for structures, it is needed to introduce life-cycle analysis method for improvement of economical efficiency. Therefore, this paper presents not only analysis of domestic conditions and problems related to system for safety and maintenance management, policies and costs for structures but an improvement plan.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.638-641
/
2006
In this paper, A calculating cost method of maintenance and repair for bridge which is built up by new construction technique named Up-Down Precast Concrete(UDPSC). After 2000, 109 Bridges which are using UDPSC technique have been built up, 37 bridges's construction work are processing, and 194 designs are presented for construction. Because this technology has developed recently, there are few field data for analyzing the maintenance and repair cost. Therefore, the maintenance and repair cost is computed using Construction and Transportation Ministry's guide line for computation and former research's data.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.74-81
/
2008
Urban Regeneration has an object to restore a function of urban through physical/cicumstance, social lift/culture, industrial/economic regeneration. It has characteristics like existence of a lot of projects, complextity of stakeholders' structure, long period of project life cycle to achieve variety of project's promotion strategy. To accomplish a Urban regeneration that has above characteristics successfully, information about other projects should be managed organically. And it should provie information linked up with each projects by integrated management. We need a decision making method that helps users cope with requirements of change during project, and offers information when each users need to make a decision timely. So I propose a strategy to build the IETM considering urban regeneration characteristics.
Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.450-455
/
2002
Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.608-611
/
2004
Efficiency of the construction process is one of the most important factors to project success. However efficiency is not well defined or measured in construction projects in general. More importantly, efficiency of the construction should be viewed through the life-cycle of the whole production system not in a single phase of the construction process. Therefore, this study defines the concept of efficiency and suggests the efficiency measurement model in construction. As a case study, the suggested model was applied to the curtain wall construction process of the high rise buildings as well.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.