• Title/Summary/Keyword: 생산성 정보

Search Result 3,693, Processing Time 0.034 seconds

An Analytical Study on Research Patterns in Library and Information Science (문헌정보학분야 연구동향 분석)

  • 최희곤
    • Journal of the Korean Society for information Management
    • /
    • v.16 no.3
    • /
    • pp.137-158
    • /
    • 1999
  • This research dealt with author production, subject production, university production, core of the majoring subject production, the multi-authors production, authors majoring in their fields production, languages and periods production for the purpose of clarifying the general research pattern of us by using the method of content analysis of 767 items of monographic which have been published in Korea between 1957 and 1997. This study was done to apprehend the general research pattern of Library and Information Science.

  • PDF

응용시스템 개발생산성 향상을 위한 거시적/관리적 접근 방법에 대한 연구

  • 이종민;이선로
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1998.10a
    • /
    • pp.563-568
    • /
    • 1998
  • 응용시스템 개발생산성에 대한 연구는 지금까지 프로그래머의 생산성이라는 미시적 수준에 그치는 경향을 보여왔으며 시스템개발 생명주기의 전반적 영향에 중점을 둔 거시적수준의 생산성의 개념으로 확대되지 못해왔다. 더욱이 그들의 생산성 측정은 미시적 측정단위를 사용함으로써 조직 내 응용시스템 개발요구의 백로그의 증가라는 거시적 문제 해결과는 거리가 있어왔다. 본 연구는 정보시스템 조직의 생산성 향상에 기여할 수 있는 도구 및 방법이 실무적으로 어떻게 사용되고 있고 그 효과가 어느 정도인지를 관찰하는 탐색적 연구로써 응용 시스템 개발 생산성에 기술적 방법과 관리적 방법을 거시적 생산성 향상의 관점에서 분석하고자 한다.

A Study on Application Development Productivity at The Macro Level (거시수준에서의 응용시스템 개발 생산성에 관한 연구)

  • 이선로;이종민
    • The Journal of Information Technology and Database
    • /
    • v.5 no.1
    • /
    • pp.39-50
    • /
    • 1998
  • 응용시스템 개발생산성에 대한 연구는 지금까지 프로그래머의 생산성이라는 미시적 수준에 그치는 경향을 보여왔으며 시스템개발 생명주기의 전반적 영향에 중점을 둔 거시적 수준의 생산성의 개념으로 확대되지 못해왔다. 본 연구에서는 거시적 수준의 응용시스템 개발생산성에 초점을 맞추어 생산성 측정치들을 검토하고 또 다양한 생산성 향상 방법을 비교하는데 그 목적이 있다. 응용시스뎀 개발 백로그가 Nolan의 정보시스템의 확장 단계에 구분없이, 또한 기타의 컴퓨팅 활동들로 특징지워지는 다양한 정보기술 환경을 가진 조직들 내에서 널리 퍼져 있는 것으로 본 연구결과에 나타났다. 또한 본 연구 결과는 '거시적/관리적 차원의 접근이 응용시스템 개발생산성 향상을 통한 개발 백로그의 감소에 긍정적인 영향을 미칠 것이다' 라는 일차적 가설을 지지하는 것으로 나타났다. 오늘날의 정보시스템 관리자들은 생산성 향상을 위하여 미시적/기술적 차원의 접근방법에 주력하는 경향을 보이고 있으나, 본 연구를 통하여 거시적/관리적 차원의 접근방법과 도구의 사용에 더 많은 노력을 기울임으로써 균형잡힌 정보관리정책을 갖게 되기를 바란다.

  • PDF

The Role of ICT on Productivity Growth in Service Industry (서비스산업의 생산성 분석 - 정보통신기술 이용 현황을 중심으로 -)

  • Kim, Nam-Hee;Kim, Gi-Hong
    • Journal of Digital Convergence
    • /
    • v.8 no.2
    • /
    • pp.13-28
    • /
    • 2010
  • Korean service industry has been rapidly growing so far and economic trends in korea is shifting to service economy. However Information Communication Technology (ICT) investment and use in service sector are still relatively low in comparison with US. Keeping the current state of the service industry in mind, this paper is to review the potential productivity growth of service industry empirically by analyzing the effect of ICT on total factor productivity after investing the ICT using outlook of Korean service industry. The results show that service sectors, with more using ICT, show high productivity growth and stable TFP change during the financial period. Sectors with lower using ICT are more sensitive to changes in the business environment when compare to sectors with highly using ICT. Concerning the period of 1997-1999, the TFP growth of most of sectors slowed down and turned to recovery immediately afterwards, 2000-2002.

  • PDF

A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work (철근콘크리트 공사의 작업 생산성 분석을 위한 3차원 객체 활용 정보관리 시스템 구축방안)

  • Kim, Jun;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.15-24
    • /
    • 2018
  • Despite the recognition of the need for productivity information and its importance, the feedback of productivity information is not well-established in the construction industry. Effective use of productivity information is required to improve the reliability of construction planning. However, in many cases, on-site productivity information is hardly management effectively, but rather it relies on the experience and/or intuition of project participants. Based on the literature review and expert interviews, the authors recognized that one of the possible solutions is to develop a systematic approach in dealing with productivity information of the construction job-sites. It is required that the new system should not be burdensome to users, purpose-oriented information management, easy-to follow information structure, real-time information feedback, and productivity-related factor recognition. Based on the preliminary investigations, this study proposed a framework for a novel system that facilitate the effective management of construction productivity information. This system has utilized Sketchup software which has good user accessibility by minimizing additional data input and related workload. The proposed system has been designed to input, process, and output the pertinent information through a four-stage process: preparation, input, processing, and output. The inputted construction information is classified into Task Breakdown Structure (TBS) and Material Breakdown Structure (MBS), which are constructed by referring to the contents of the standard specification of building construction, and converted into productivity information. In addition, the converted information is also graphically visualized on the screen, allowing the users to use the productivity information from the job-site. The productivity information management system proposed in this study has been pilot-tested in terms of practical applicability and information availability in the real construction project. Very positive results have been obtained from the usability and the applicability of the system and benefits are expected from the validity test of the system. If the proposed system is used in the planning stage in the construction, the productivity information and the continuous information is accumulated, the expected effectiveness of this study would be conceivably further enhanced.

A study on the Content Analysis of Monograph in Library ana Information Science (문헌정보학에 있어서 단행본의 내용분석 연구)

  • 최희곤;남태우
    • Proceedings of the Korean Society for Information Management Conference
    • /
    • 1998.08a
    • /
    • pp.123-126
    • /
    • 1998
  • 본 논문은 문헌정보학의 연구동향을 규명하기 위하여 1957년부터 1997년 12월까지 국내에서 출판된 단행본 1,855종을 내용분석(Content Analysis)을 이용하여 저자별 생산성, 주제별 생산성, 대학별 생산성, 연구방법별 생산성에 대한 분석을 살펴봄과 동시에 그 결과를 통한 핵심전공주제, 핵심저자, 전공분야별 핵심저자, 언어분석 등을 각각 수량적으로 분석 조사하였다. 이 같은 연구는 문헌정보학의 핵심주제와 관심영역, 주제의 편중과 분포, 학문의 전반적인 흐름을 파악할 수가 있었다.

  • PDF

A Measure of Productivity in Derivational Morphology (파생어의 생산성 측정)

  • Cha, Joon-Kyung;Kang, Beom-Mo
    • Annual Conference on Human and Language Technology
    • /
    • 1995.10a
    • /
    • pp.282-289
    • /
    • 1995
  • 이 연구는 지금까지 국어 형태론에서 사용되지 않았던, 코퍼스를 이용한 계량적인 방법으로 파생어의 생산성 정도를 측정하고, 그 결과로 국어 파생 형태론에서의 생산성을 기술한 것이다. 각각의 접사들의 생산성 정도에 대한 수치를 제시함으로써 좀 더 정확하게 상대적인 생산성 비교를 할 수 있도록 하였다. 접사의 생산성 정도 측정방법은 Baayen(1989)에서 제시한 것으로, 특정접사를 가지고 코퍼스에 단 한번 출현하는 단어의 수($n_1$)와, 주어진 접사를 가지고 코퍼스에 나오는 단어의 총수(N)의 비율로 접사의 생산성 정도를 측정한다($P=n_1/N$). 200만 어절 및 1000만 어절 코퍼스를 기반으로 국어의 대표적인 파생접미사들 중 명사파생 접미사 '-이', '-음', '-기', 형용사파생 접미사 '-스럽-', '-롭-', '답-', 동사파생 접미사 '-거리-', '-대-', '-이-'의 생산성 정도를 측정하였다. 본 연구에서 채택한 코퍼스를 이용한 언어 연구 방법은 기존의 사전을 이용하여 파생어의 생산성을 측정하는 것에 비해 앞선 것이라 할 수 있다.

  • PDF

생산정보시스템 구축을 위한 개발방법론(PSDM)의 효과적인 적용에 대한 사례연구

  • Ju, Seok-Jeong;Hong, Sun-Gu;Park, Sun-Hyeong
    • Proceedings of the Korea Database Society Conference
    • /
    • 2010.06a
    • /
    • pp.21-31
    • /
    • 2010
  • 중소기업은 변화하는 경쟁 환경에 능동적으로 대처하고 경쟁력확보와 생산성 향상을 위하여 IT를 기반으로 하는 다양한 생산정보시스템을 도입, 운영하고 있다. 이에 따라 효율적인 중소기업 생산정보화를 위하여 시스템 개발 과정을 정형화하는 생산정보시스템의 표준화가 요구된다. 특히 중소기업, IT업체, 감리업체 등 참여 기업 간의 의사소통, 그리고 구축된 생산정보화의 유지보수를 포함한 운영지원 등의 체계적이고 효율적인 운영을 위해서는 생산정보시스템의 개발 방법론 (PDSM)이 필요하다. 이에 따라 중소기업기술정보화진흥원에서 생산정보화시스템개발방법론(PSDM)을 개발하여 보급하고 있다. 본 연구에서는 정부가 지원하는 중소기업 생산정보화지원사업에 참여한 기업을 대상으로 생산정보화시스템개발방법론(PDSM)을 적용한 IT 업체의 적용사례를 통해 방법론의 활용에 따른 생산성 향상 및 작용 시 고려사항에 대해 살펴본다. PSDM은 효과적인 중소기업 생산정보를 위하여 시스템 과정을 표준화 하고 단계별 주요 활동에 대한 연구와 함께 프로젝트 범위, 일정, 비용, 인적자원 관리를 위한 WBS(Work Blockdown Structure)작성, 시스템의 신뢰성 품질, 생산성 향상을 위한 관리 항목 등의 내용을 포함하고 있다.

  • PDF

Collection and Utilization of the Construction Productivity Data and the Influence Factors Using Information Technology (IT 기술 기반의 건설 생산성 정보 및 영향요인의 수집 및 활용)

  • Lee, Hyun-Jung;Oh, Se-Wook;Kim, Young-Suk;Kim, Yae-Sang;Kim, Sang-Bun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.548-553
    • /
    • 2006
  • Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.

  • PDF

A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project (도로공사 대표공종의 생산성 정보 개발에 대한 연구)

  • Seo, Ji-Hyeong;Park, Hyung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.42-53
    • /
    • 2011
  • This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.