• Title/Summary/Keyword: 사업시행자 선정

Search Result 43, Processing Time 0.028 seconds

Development of the Promoter Selection Procedural Model for Private Participation in Infrastructure Projects (민간투자 사업시행자 선정 절차 모델 개발)

  • Han Hyun-Jong;Choi Eung-Kyoo;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.55-62
    • /
    • 2004
  • The purpose of this study is to suggest a systematic procedural model for selecting competent project promoter. The proposed model was made by comparing domestic regulations and procedures with foreign nations', and through interviews with experts and literatures survey. The summaries of this paper are as follows. The current promoter selection procedure was evaluated by reviewing relevant papers, regulations and existing model. Some obstructions which hinder PPI project activation were identified, those are inadequacy of promoter qualification and negotiation process, lack of communication between parties, etc. Some alternatives which remove major obstructions are embodied in the model. The suggested model is comprised of PQ(prequalification), two phased evaluation for the technical proposals which include alternate, communication meeting, etc. To manage the overall procedure well, an involvement of professional "project promoter selection team" would be highly recommended. They will participate in each evaluation stage with full activities, and provide government with some technical materials for selecting promoter as coordinator.

Improvement of Concessionaire Designation Evaluation Criteria for Build-Transfer-Lease Private Participation in Infrastructure Projects (BTL사업의 사업시행자 선정 평가기준개선에 관한 연구)

  • Shin, Hyun-In;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.121-131
    • /
    • 2006
  • Since "Act on Private Participation in Infrastructure" were changed in January 2005, BTL(Build-Transfer-Lease) projects of Private Participation In Infrastructure was introduced in the domestic construction market for the purpose of providing public facilities with the public. Selecting the most qualified Promoter should be considered discreetly in BTL projects because BTL projects is for projects with approximately thirty year project life cycle, plan, construction, operating, maintenance and obviously the success of the project totally depends on the capability and role of concessionaire. However, score for cost is likely to influence designating concessionaire to take the project. Accordingly, low bid contract with too much competition could decrease the quality of the construction plan and operating plan. Thus, this study did preliminary research and documents on problems of evaluation criteria for designating concessionaire in BTL projects, and proposed improvement program by doing questionnaire over specialists of each field.

An Economic Analysis of Agricultural Automated Water Management Project and an Study on the Enlargement Plan (농업용수관리자동화사업에 대한 경제효과 분석 및 발전방안 연구)

  • Jee, Yong-Geun;Kim, Sun-Joo;Kim, Phil-Shik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.953-957
    • /
    • 2006
  • 농업용수관리자동화사업의 시행은 수자원관리 중에서 용수절약 및 유지관리비 절감을 위해 도입된 용수관리 개선방안 중의 하나이다. 현재 대부분의 수리시설이 수원공 관리인과 수로감시원의 인력에 의해 관리되고 있으며 2004년 수리시설물의 관리비 집행내역을 살펴보면 시설유지비 54.2 %, 개보수비 34.2 %, 적립금 및 기타 비용이 11.6 %를 차지하고 있다. 이 중의 시설유지비는 인거비의 상승으로 1999년 41.4 %에서 2004년 54.2%로 증가되었으나 개보수비는 같은 기간에 41.5 %에서 34.2 %로 감소된 것으로 나타났다(농업생산기반정비사업 통계연보, 2005). 따라서 농업용수관리자동화는 시설관리비와 개보수비의 절감 그리고 적정한 용수관리에 의한 용수절감을 위해서 더욱 확대 보급할 필요가 있다. 본 연구에서는 농업용수관리자동화 사업이 추진되어 운영되고 있는 충주지구를 선정하여 총사업비, 인건비, 유지관리비(통신료, 전력사용료 등), 수선유지비, 기타비용 등의 비용과 인력절감효과, 용수절감효과, 재해경감효과, 공익적효과 등의 편익을 분석하였다. 농업용수관리자동화시설에 대한 비용-편익 분석을 한 결과, 경제적인 효과가 있는 것으로 나타났으며 지속적인 사업의 시행을 위해서는 시설에 대한 교육, 전문인력의 보충, 운영 및 유지관리비의 투자가 병행되어야 한다고 판단된다.

  • PDF

A study on the effective operation&selection of the BTL project (BTL사업자의 효율적인 선정 및 운영에 관한 연구)

  • Kim, Kyung-Suk;Choi, Moon-Bok;Cho, Young-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.599-602
    • /
    • 2007
  • To enhance the competition of National power, the investment of SOC is an essential factor for infrastructure construction. The capital for SOC is so gigantic and the national finance is limited, engagement of various subject is necessary. So, Government is promoting the private sector to invest capital in SOC development. Nevertheless the increasement of SOC investment, various problems were issued in selection & operation of BTL. Therefore, to raise the probability of success for BTL project, escalation, unification and specialization of BTL affairs, BTL selection process were suggested in this study.

  • PDF

Decision Support Model for Selection Water Resources Facility Improvement Projects (수리시설개보수사업 선정을 위한 의사결정지원모델)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.449-459
    • /
    • 2021
  • More than 80 % of agricultural reservoirs are old facilities over 50 years old, and safety and function declines occur. As a result, safety accidents such as the collapse of the reservoir have occurred. Precise safety diagnosis is conducted in advance to prevent accidents such as reservoir collapse, and Water resources facility improvement project are implemented based on priority. However, the priority of the business is selected based on the subjective judgment of the facility manager. In this study, we set 80 hypotheses based on the results of precision safety diagnosis and decision-making examples of existing Water resources facility improvement project and selected 45 variables using correlation analysis and significance test. Using logistic regression analysis, the final 21 variables were selected and a decision support model was presented, and the classification accuracy of the model was 86.8 %. In this research, the part that presented the quantitative index for decision support when selecting the Water resources facility improvement project has important significance.

The Effects Analysis and Model Project on Speed Management in Commerical Area Street (상업지역 생활도로 속도관리 시범운영 및 효과분석)

  • Shim, Kywan-Bho;Heo, Nak-Won
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.119-127
    • /
    • 2011
  • The main purpose of this paper is to apply Zone 30 system which is being experimented in advanced country for the solution of controlling the residential street's speed to our country with the consideration of the real condition of our street and traffic and to run this system as an example to analyze the effect and at the same time, analyze the problem and get appropriate preparation for this system to be widespread. The area to run this model project is Goyang City Ilsan-Gu.($0.65km^2$) which is close with the commercial area reflecting the opinion of experts and an on-site verification by the National Police Agency T/F and is having a heavy pedestrian traffic and the risk of pedestrian accident. Firstly we defined residential street and residential street area to review the system and devided the residential street type to establish a plan of operation. Afterwards, we thoroughly examined the model project area and analyzed the problem and solution. We finally completed establishing a facilities by conference with a local autonomous entity with the improvement of facility's sketch at the analysis of the model project area. The result of effects analysis which we devided after and before of establishment is that vehicle speed be reduced 5~15km/h, and traffic accidents has decreased by 24 percent.

Study on Development of River Synthesis Management Index (하천종합관리지표 개발에 관한 연구)

  • Choi, Si-Jung;Lee, Dong-Ryul;Baeck, Seung-Hyub;Hong, Seung-Jin;Kang, Seong-Kyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.734-734
    • /
    • 2012
  • 국내에서는 과거부터 현재까지 하천을 이수, 치수, 하천환경 등 기능별로 구분하여 관리해 오고 있다. 하지만 하천을 보다 합리적으로 관리하기 위해서는 종합적인 관점에서 접근이 필요하며 하천의 현 상황을 제대로 파악하는 것이 무엇보다 중요하다. 하천을 평가하기 위해 제방축조율, 수질 등 다양한 하천지표 및 평가기법들이 개발되어 왔으나 치수 이수 환경 친수 등 하천의 다양한 기능 중 특정 기능들에 대해서만 단편적으로 진단해 오고 있는 실정이다. 또한 4대강 사업, 생태하천조성 등 다양한 하천사업이 시행되고 있어 그 성과와 필요성을 정량적으로 평가 관리할 수 있는 제도 마련이 필요하며, 하천 기능을 종합적으로 진단하고 이를 객관적으로 정량화할 수 있는 체계 구축이 매우 절실하다고 할 수 있다. 따라서 건전한 하천종합관리체계 구축을 위해 하천의 기능인 이수, 치수, 하천환경 및 친수 요소간의 조화와 평가가 가능한 정량적 지표 및 지수의 개발이 필요하다. 보다 건전한 하천관리체계 구축을 위한 국가 수자원 정책 결정 시 정책결정자가 보다 다양한 정보를 획득하고 이를 통한 분석정보를 바탕으로 여러 가지 대안을 도출할 수 있어야 하며 이는 여러 가지 정보를 종합한 지표를 통해 보다 쉽게 얻을 수 있다. 하천의 다양한 기능에 대한 정보를 종합하여 지표화함으로써 정책결정자는 여러 가지 경우를 고려한 다양한 대안을 검토할 수 있게 되어 최적의 대안 도출이 가능해진다(건설교통부, 2006). 본 연구에서는 한정된 수자원을 다양한 목적과 제약조건을 충족시키면서 효율적으로 이용, 보전하기 위해 하천의 다양한 정보의 연계, 공유를 통한 통합관리체계 구축을 하고자 하천 특성을 표현할 수 있는 다수의 대리변수를 조사, 분석하였다. 또한 조사된 대리변수들 중 하천의 각 기능에 미치는 영향을 충분히 고려하여 대리변수를 선정하고 이를 통해 잠재지표를 선정하였다. 선정된 잠재지표를 이용하여 하천의 각 기능을 평가할 수 있는 하천종합관리지표를 개발하여 국내 국가하천에 적용함으로써 하천 특성의 시공간적인 변화를 분석하였다. 개발된 지표를 통해 국내 하천관련 사업에 대한 B&A 분석을 수행하여 사업 성과를 제시하였다. 본 연구에서 개발된 지표는 하천관련 사업의 전, 후 상황을 분석함으로써 사업효과를 분석할 수 있으며 하천관련 사업의 효과에 대한 대국민 홍보효과를 가져올 수 있을 것으로 사료된다.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

우리나라 국가연구개발사업 연구평가지표의 개선에 관한 연구

  • Yang, Hui-Seung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.560-563
    • /
    • 2004
  • 기술개발이 국가경쟁력 제고의 중요한 수단으로 인식됨에 따라 국가차원에서의 연구개발이 적극적으로 추진하고 있다. 우리나라의 경우도 예외가 아니어서, 1990년대 이후 우리 정부는 국가연구개발사업을 높이기 위해 연구 평가제도를 꾸준히 정비하여 왔다. 그러나 아직까지도 연구평가와 관련하여 여러 가지의 개선요구가 연구자들로부터 제기되고 있다. 이러한 현상이 나타나는 이유는 근본적으로 연구평가가 공급자 위주로 이루어지면서 미래지향적이고 효율적인 접근이 이루어지지 못하였다는 데에서 그 원인을 찾을 수 있다. 본 연구에서는 현재 여러 정부부처에서 연구평가를 시행하면서 연구과제의 선정단계와 중간평가단계에서 사용되고 있는 지표가 정책 목표에 합목적적이고 국가연구개발사업의 실질적인 성과를 제고할 수 있도록 구성되어 있는가를 살펴보았다. 연구의 성격에 따라 학술기초 연구사업, 원천기술 연구사업, 그리고 산업기술 개발사업을 분류된 사업그룹별로 연구의 특성을 반영하는 준거 틀과 실제로 사용하고 있는 지표를 비교하였다. 그 결과 아래와 같은 세 가지 유형의 문제점이 도출되었다. 첫째는 연구 성격이나 연구 활동의 수행 단계에 맞지 않는 불필요한 지표들이 활용되고 있는 경우이다. 여기에는 연구수행단계 또는 연구 성격을 감안하여 볼 때 꼭 필요하지 않은 지표임에도 불구하고 채택이 되고 있거나, 하나의 평가지표로 충분히 점검이 가능한데에도 불구하고 유사한 여러 가지의 지표들이 사용되는 경우를 포함하고 있다. 둘째는 지표의 구성에 있어 연구사업의 성공요인을 반영하지 못하고 있는 경우이다. 여기에는 특정한 연구수행단계의 성과를 평가하는데 필요한 지표들이 제외되어 있거나, 연구의 특성에 대한 고려가 이루어지지 않은 상태로 불필요하거나 반복적인 지표가 채택되는 경우를 포함하고 있다. 셋째는 추상적이며 측정이 어려운 지표를 채택하고 있는 경우이다. 여기에는 지표에 대한 정확한 정의가 이루어져 있지 않아 피 평가자가 불필요하거나 과다한 평가 자료를 준비해야 하거나 평가자로 하여금 평가 시 혼돈을 유발할 가능성이 있거나, 또는 상위개념의 평가항목과 하위개념의 평가항목이 혼재되어 구분이 모호한 경우를 포함하고 있다.

  • PDF

Analysis on Bidding Behavior in Score Auction: Highway BTO Projects (수익형 민간투자사업(BTO) 입찰평가 분석: 도로사업을 중심으로)

  • Kim, Jungwook
    • KDI Journal of Economic Policy
    • /
    • v.33 no.4
    • /
    • pp.143-177
    • /
    • 2011
  • Upon selecting preferred bidder in Public-Private Partnership projects, multi-dimensional procurement auction, where price factor and non-price factor are evaluated, is used. This paper tries to analyze bidding data in BTO road projects. It is shown that a winner tends to get higher score in bidding evaluation, which is partly due to increase in base score as well as fiercer competition among bidders. It turns out that score margin in non-price factor was determinant in selecting winner. Also, there was no competition when the level of bonus point was set too high. For price factor, it costs 730 million KRW per score in construction subsidy by government, while it costs 2.43 billion KRW per score in toll revenue. For non-price factor, it was estimated to cost 2.30 billion KRW. Based on the results, it was suggested that we should have appropriate level of bonus point for first initiator, change in scoring rule in construction subsidy part, adjustment of base score in evaluation.

  • PDF