• Title/Summary/Keyword: 사업수행 단계

Search Result 766, Processing Time 0.028 seconds

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

Design of the Reinforced Concrete Lining in Bakun Diversion Tunnels (말레이지아 바쿤 가배수로 터널의 철근콘크리트 라이닝 설계)

  • 지왕률;임태정
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1999.03a
    • /
    • pp.9-15
    • /
    • 1999
  • 말레이지아 보르네오섬 사라왁주의 바군 가배수로 터널(약칭 "바쿤터널")은 본 댐 공사를 수행하기 위한 배수 터널로 터널의 완공시기는 바쿤 수력발전사업의 중요한 요인이다. 터널의 라이닝작업은 터널공사의 완료 단계로 공사비와 공기 면에서 굴착 및 지보작업과 같이 중요한 단계이다. 바쿤터널은 내부 직경 12 m의 유사연장 3개의 터널로 이루어져 있으며 총길이는 4314.6 m 이다. 내공 단면은 배수시 마찰을 감소시키기 위하여 원형단면으로 설계되었다. (중략)계되었다. (중략)

  • PDF

무기체계개발-소요군 무엇을 요구하나

  • O, Je-Sang
    • Defense and Technology
    • /
    • no.3 s.157
    • /
    • pp.48-53
    • /
    • 1992
  • 개발자는 사용자인 60만 소요군을 위한 무기체계의 인구개발 사업을 수행할 때에 연구개발 초기 단계에서부터 양산배치, 운용단계까지 사용자의 작전운용 및 정비지원 요구사항들을 상세히 분석해야 한다. 그렇게 하기위해서는 소요군의 현재/미래, 작전운용/정비지원 임무, 기상조건, 지형지물 조건, 적의 무기체계, 적의 작전운용/정비지원 조건 등을 개발자가 구체적으로 분석해야만이 개발목표 무기체계의 성능설계와 사용자의 인간공학적 문제인식을 도출할 수 있을 것이다

  • PDF

Construction Management Evaluation Model using Risk Index Modeling in Construction Phase (위험도 모델링을 이용한 시공단계의 감리업무 평가모델)

  • Ryu Jin-Young;Mo Yong-Woon;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.89-100
    • /
    • 2000
  • The purpose of this study is to maximize project efficiencies in construction management by analyzing hierarchical factors that effect in project supervision system, and consequently constructing managerial CSF(Critical Success Factors). For this study, the tools for evaluating operating and management abilities of site engineers are built from analyzing status and issues, deducing influence factors and rating cardinal scales of these factors from survey results. These evaluation tools are reflected to the construction supervision decision making process so that can improve project management effectiveness.

  • PDF

Approximate Estimating Model for PSC BEAM Bridge Using Influence Factors (PSC BEAM 교량 공사비 영향요인을 이용한 개략공사비 산정모델 개발)

  • Kang, Chan-Sung;Lim, Won-Seok;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.585-588
    • /
    • 2007
  • This study attempts to analyze estimating process and the level of information performing literature review and questionnaire and identify phased influence factors on construction cost using phased information of project and suggests framework of approximate estimation model at the planning and design stage. This paper suggests phased influence factors on construction cost and framework of approximate estimation model for integrated project cost management.

  • PDF

Effect of the Brain Korea 21 Plus Project on Graduate's Performance and Satisfaction: Empirical data analysis for a social science department (BK21플러스 사업참여가 대학원생 역량과 만족도에 미치는 효과: 단일 사회과학 사업단의 경험적 자료 분석)

  • Kim, Bo-Ra;Kim, Yu-Jin;Jung, Ye-Seul;Jeong, So-Hui;Kim, Hak-Rae;Chung, Kyong-Mee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.45-60
    • /
    • 2020
  • The Brain Korea 21 (i.e., BK21) is a state-led higher education funding project that started in 2013. Previous literature investigating the effectiveness of the project mainly focused on massive quantitative outcomes of funded teams, and many studies reporting only self-reported data of graduate students who participated in the project. Therefore, there were not many BK21 studies that thoroughly examined the graduate students' performance, ability, satisfaction, etc. This study aims to determine the effect of the BK21 project participation on graduate students' academic performance, using objective (the number of published papers), self-rating (graduates' satisfaction), and other-rating (advisor's performance evaluation) data, which were sampled from 2013 to 2019 from a single funded team on a one-departmental-unit. The results showed that the participating graduate students had more published papers, and had higher performance evaluation scores in research, and overall abilities, than the non-participating graduate students. Further, participating students were largely satisfied with BK21 supports. This study has significance in that it demonstrates the positive influence of the BK21 project on graduate students' academic performance and satisfaction by the thorough investigation of a single social science funded team.

Code and Standard Development for Nuclear Components in Nuclear Power Plant (원자력 기계기기 기술기준 개발방향)

  • 구정회
    • Journal of the KSME
    • /
    • v.33 no.8
    • /
    • pp.700-707
    • /
    • 1993
  • 원자력발전소에 관한 사회전반의 관심고조와 함께 기술기준의 개발에 대한 필요성도 폭넓게 인 식된 결과 현재 발전사업자의 주도하에 정부 관련기관, 원전산업체, 하계 등이 공동으로 참여하여 "원전산업 기술기준 개발사업(2단계)이 수행되고 있다. 물론 기술기준의 개발은 매우 중요한 과 제임이 틀림없겠지만 개발된 기술기준을 어떻게 효율적으로 운영, 발전시켜 나가느냐가 더욱 중요한 과제인 바, 앞서의 검토에서 수차 강조되었듯이 미국을 비롯한 선진 원전국의 경우처럼 기술기준을 지속적으로 개발, 유지 및 보완하고 각종의 자격 인증에 관한 업무를 수행할 전담 기관을 정부, 발전사업자, 산업계, 학계 등의 적극적이고 자발적인 참여하에 하루 빨리 발족시 켜야만 산적한 현안문제를 해결하고 기술기준의 개정보완과 같은 계속성 업무를 체계적이고도 일관되게 수행할 수 있다고 판단된다.판단된다.

  • PDF

A study on competitive strategy analysis in master plan for public organization's information (공공기관 전산종합계획수립에 있어서의 경쟁전략분석 도입에 관한 연구)

  • 김연규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1994.04a
    • /
    • pp.762-771
    • /
    • 1994
  • 최근들어 SI 산업의 발전과 함께 공공부문에서의 대규모 전산사업의 추진이 늘어나고 있다. 이러한 대규모 전산 사업 시행의 첫단계에는 통상 전산화 종합계획을 수립하는 경우가 많으며 국가 행정망 개발의 표준 방법론인 관리기법/1을 사용하는 것이 일반적이다. 그러나 관리기법/1중 120G segment에 규정되어 있는 경쟁 전략의 도입 부분 및 Value Chain Analysis 는 공공부문의 특성상 적용하기 난이하다. 이 부분들은 잘 수행될 경우 매우 유익한 여러 정보를 제공할 수 있음에도 불구하고 실제 응용에서는 시간의 제약, 전문 인력의 부족, 그리고 비구조화된 수행 방법 등의 제 요인들로 인하여 피상적인 결과만을 산출하는 경우가 많다. 본 연구에서는 용이하고 비교적 효과적으로 단기간에 경쟁 전략 및 Value Chain Analysis를 수행 할 수 있는 방법론을 제시하고 사례를 통하여 그 효과를 보인다.

국가정보화의 통합적 관리체계

  • 임성묵;윤정원;정승호;서용윈
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.991-998
    • /
    • 2003
  • 우리나라 전자정부 추진 과정 중에 드러난 문제점들은 정보화 투자의 비효율성, 일관성 결여 및 중복성, 정보화 수요의 폭발적 증가에 따른 양적인 대응의 한계, 전산환경 운영의 비효율성 등으로 요약될 수 있다. 이러한 문제점들은 범정부적인 정보자원에 대한 일관된 관리운용체계의 확보를 통해 해결될 수 있다. 점차 경량화되는 정부가 혁신된 정보자원 관리운용체계를 효과적으로 유지하기 위해서는 이를 뒷받침하는 지원 기능이 강화되어야 한다. 본 연구에서는 우리나라 차세대 전자정부 추진 목표로 완전 통합 단계의 달성을 상정하고, 그 방안으로 국가정보기술원의 역할모형을 제시하였다. 국가정보기술원은 정부가 추진하는 모든 정보화사업이 일관성있고, 효율적으로 진행될 수 잇도록 국가정보화에 필요한 전반적인 기능들을 섭렵하여 지원하는 전담기관으로, 정보화기획, 정보화사업관리, 정보자원 운영, 국가표준관리, 감리 및 평가 동의 기능을 수행한다. 특히, 본 연구에서는 범정부적 정보인프라의 통합운영을 담당하는 국가정보센터의 모형을 제시하였는데 국가정보기술원은 이를 통해 정보자원 운영 기능을 수행하게 된다. 본 연구에서 제시된 국가정보기술원의 역할 모형은 정부의 정보자원 관리운용체계를 혁신하고, 유지하는데 필요한 기능을 충분히 수행할 수 있을 것으로 기대된다.

  • PDF

진단 대상사업 수요분석을 통한 개선방안 연구

  • Choe, Un-Gyu;Gang, Won-Sik;Kim, Yeong-Du
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2013.06a
    • /
    • pp.521-523
    • /
    • 2013
  • 해상교통안전진단 제도 시행관련, 경과 진행에 따른 실적 분석 및 소요 분석을 통한 개선점 도출이 현 시점에는 시행된 바가 없는 상태로 제도의 원활한 운영 및 개선점 발굴을 위해선 연구 필요성이 있다. 따라서 수행된 진단 실적, 사업별 특성, 진단 특성을 분석하고 장래 진단 수요량을 예측 분석하여 진단 수행에 따른 개선점을 도출하고 장래 상황 예측을 통한 해상교통안전진단 효율화 자료로 사용하고자 한다. 그에 따라 본 연구에서는 진단실적 분석, 진단수행 개선점 분석, 장래 진단 수요분석, 진단 수요에 따른 개선점 분석의 4단계로 분류하고 관련 내용을 연구, 분석, 검토 기술하였다.

  • PDF