• Title/Summary/Keyword: 사업수행 단계

Search Result 765, Processing Time 0.04 seconds

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Kim Jea-Ho;Suh Sang-Wook;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.126-134
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

  • PDF

A Study on the Maintenance System Module Design for the BTL Project Facilities : Focused on Educational Facilities (임대형 민자사업(BTL) 발주 시설물의 합리적 유지관리시스템 모듈 설계에 관한 연구 -교육시설물을 중심으로-)

  • Kim, Sang-Seok;Son, Jae-Ho;Lee, Seung-Hyun;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.702-707
    • /
    • 2008
  • BTL projects for educational facilities were conceived in 2005 to supply public facilities in a timely and efficient manner After the projects were completed in March 2007, proper facility maintenance has become an increasingly important issue. However, BTL projects are still in an early developmental stage, and the data on the maintenance and operation of such facilities are not yet available because the operation of the facilities has just begun. Accordingly, this study is conducted to derive maintenance processes and to specify maintenance items for the efficient maintenance of BTL educational facilities. Then, database on the maintenance processes will be created, and a maintenance system module will be designed.

  • PDF

The Establishment of the Design Interface Management Model for SOC Projects (SOC사업의 설계 인터페이스 관리 모델 구축)

  • Oh Jae-Ouk;Kim Woo-Young;Yi Kyoo-Jin;Suh Sang-wook;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.116-123
    • /
    • 2000
  • SOC projects entail inherently large-scale works, and need much capital and time. Because of these features, the design activities in SOC projects are performed through a complicated process involving many organizations. A great deal of information is generated and vanished during the process, and the communication among the related organizations plays a very important role in successful fulfillment of SOC projects. But, because the method of information communication has not yet systematically established, there are many difficulties in sharing information. This study aims at establishing the design interface management model which enables the participants to effectively share the information during the design phase. The contents of the study include (1) Restructuring performance organization, (2) A decision making method in collaborative design through partnering with experts, (3) A method to develop Open Design Information Integrated model using Standardization(ODIIS).

  • PDF

Building Direction of a Procurement Management Process Model for the SOC projects (Focused on the Airport Facilities) (SOC 사업의 조달관리 프로세스 모델 구축 방향 (공항시설물 중심으로))

  • Kim Ku-Taek;Kim Sun-Kuk;Han Choong-Hee;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.108-116
    • /
    • 2000
  • The absence of systematic project procedures in the domestic SOC projects has caused many problems. Therefore, it has been raised the needs for the effective project management of the projects which helps the participants to have systematic procedures at each phase of the SOC projects. The purpose of this research is to build the current model of procurement management process for the airport facilities and to derive inherent problems, and the building direction of the effective procurement management is suggested for the future research. The result of this research could be used for delivering the effective SOC projects and for establishing interrelationships between procurement and other phases of the projects for the integrated project management. The procurement process of the Inchon International Airport was investigated and the as-is model was built. Through the analysis of the as-is model, and the questionnaires and the interviews with the participants of the SOC projects, the problems of the current procurement process has been derived.

  • PDF

Analysis of the Importance from Detailed Work (Role) of the Construction Manager for G-SEED Certification in the Design Phase (녹색건축인증을 위한 설계단계 건설사업관리자의 세부 업무(역할)별 중요도 분석)

  • Lee, Duhwan;Kang, Seongmi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.103-112
    • /
    • 2020
  • In this study, based on actual project implementation cases, task management plans for construction management related green building certification were derived in major stages. Accordingly, the importance from details of construction management tasks for the operation and management process of the schematic design phase, design development phase, and construction document phase, focusing on G-SEED certification, was analyzed. In addition, major items were derived based on the weight of additional construction costs and acquisition scores through previous research cases on the analysis of construction costs for G-SEED certification, and the importance from details of construction management tasks on the major items of G-SEED certification was analyzed. As a result, the review and confirmation of the elements of reflection related to G-SEED in the schematic design phase, the adequacy of design documents and the connectivity of design phase in the design development phase were important. And the review and confirmation of the items directly related to the construction phase in the construction document phase were important.

An Economic Evaluation Method for Remodeling Project - focusing on the rental apartment - (리모델링 사업의 경제성 평가 방안 -임대 아파트를 중심으로- .)

  • Kim Hae-Jung;Kang Hyun-Kui;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.359-362
    • /
    • 2001
  • Most old apartment housing have been replaced with new ones by means of the reconstruction. But with the change of the construction environment, remodeling is introduced as a new alternative for the replacement. Remodeling is expected to reduce national loss owing to the early reconstruction of old apartments resulted from economical and functional deterioration. But there still remains a lot of problems to be first solved for Remodeling. One of those is to figure out how to perform an economic feasibility analysis effectively. The researches of remodeling done under the rally stage are not sufficient in economic feasibility for apartment housing. Therefore, this paper suggests an effective method for the economic evaluation of remodeling projects focusing on a rental high-rise apartment.

  • PDF

Barriers of Gas Hydrate Technology Research and Development (가스하이드레이트 개발사업 수행의 장애요인 분석 연구)

  • Yi, Sul-Ki;Park, Joo-Young;Heo, Eun-Nyeong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.303-303
    • /
    • 2009
  • 본 연구는 가스하이드레이트 개발사업과 관련하여 해당 분야의 국내 개발환경을 고려한 기술로드맵을 설정하기 위하여 현 단계에서의 애로점을 분석하는 것을 그 목적으로 하고 있다. 이에 세 단계에 걸쳐 델파이 설문을 진행하였다. 첫 단계에서는 우선 전문가 집단에게 개방형 설문을 이용하여 애로점 속성 초안을 마련하였고, 이렇게 마련한 속성 초안을 바탕으로 중과제 책임자 면담을 통해 더욱 구체화시켰다. 두 번째 단계로 구체화된 속성 초안들로 2차 설문을 구성하여 각 속성별 중앙값과 사분점간범위를 산출해내었다. 마지막으로 3차 설문에서는 산출된 중앙치나 사분점간범위를 제시하고 응답하는 전문가들에게 응답을 다시 한번 재고할 기회를 주며, 이 때에도 다수의 의견으로부터 벗어날 경우에는 의견을 달리하는 이유를 적을 수 있도록 하였고, 현재 3차 설문을 진행중에 있다.

  • PDF

Ehtiopiam Agricultural Extension System -The Past Experience, Present Status and Future Direction- (에티오피아 농촌지도사업의 현재와 미래)

  • Besha, Dagnachew Bekele;Park, Duk-Byeong
    • Journal of Agricultural Extension & Community Development
    • /
    • v.21 no.1
    • /
    • pp.219-244
    • /
    • 2014
  • Agricultural extension service in Ethiopia was started in early 1950s with mandate of transferring local research outputs and technologies to farmers, and importing technologies and improved practices from abroad. Extension service provided in this early time was limited to areas surrounding the experiment stations. Since then, Ethiopian Agricultural extension service has passed through at least five stages: the land grant extension system, the Comprehensive Package Programs, the Minimum Package Projects, the Peasant Agricultural Development Program, and the Participatory Demonstration and Training Extension System (PADETS). The comprehensive package extension program was initially implemented in selected pilot areas and eventually to be scaled up to cover about 90% of the farming community within 15-20 years time. The program used demonstration plots managed by development agents and used to train farmers organized through various field days. However, since all of these programs were operational in only small areas, the vast majority of the country was out of their reach. Through Participatory Demonstration and Training Extension System, the extension service in Ethiopia has come under the spotlight and government debates and external reviews are putting additional scrutiny on the system. Despite this long history, the system is still in its infancy in terms of coverage, communication and institutional pluralism. Currently in Ethiopia the Agricultural extension is provided primarily by the public sector, operating in a decentralized manner through which extension is implemented at the district level. Therefore, the main focus of this paper is to scrutinize the past, the present and the future Agricultural extension system in Ethiopia.

The Case Study on a Documentation of Mega Sports Event (메가 스포츠이벤트의 기록화를 위한 사례연구)

  • Cheon, Ho Jun
    • The Korean Journal of Archival Studies
    • /
    • no.42
    • /
    • pp.37-71
    • /
    • 2014
  • The purpose of this study was to analyze developed case of archiving on Mega Sport Event for searching effective method on a documentation of Mega Sport Event. In order to conduct this study, literature review method was using about book, thesis and data of internet homepage for exploring the stage on Mega Sports Event and case of Mega Sports Event record management. The field study was conducted about institute related to Olympic record management institution for analysing Mega Sports Event record management. The result of this study is following: Firstly, 2012London Organizing Committee of the Olympic Games's case(The People's Record Project) is useful to ex-ante event phase. Secondly, 2000Sydney Organizing Committee of the Olympic Games's case(Olympic Games Knowledge Management Project) is useful to event operation phase. Thirdly. LA84Foundation's case(Olympic Oral History Project) is useful to ex-post event. The significance of this study which came up with the study result above can be presented as follows. Based on the result of this study, it is assumed that three case for documentation about Mega Sports Event. Lastly, the result of this study was useful to Mega Sports Event record management institution. For the more, it will be conducted to study law of Mega Sport Event record management, humane and Material resource and method related to record management of the Mega Sports Event organizing committee.

A Study on Public Developer's Role through Urban Regeneration Projects in Japan (일본 도시재생사업에서 공공시행자의 역할에 대한 고찰)

  • Cho, Seungyeoun;Kim, Joojin;Lim, Jeong-Min;Ryu, Dong-Joo
    • Land and Housing Review
    • /
    • v.6 no.4
    • /
    • pp.177-184
    • /
    • 2015
  • This study is focused on the public developer's role of urban regeneration projects in Japan to derive implications for economy-based-urban regeneration programs by the Special Act on Activation and Support for Urban Regeneration (Urban Regeneration Special Act). 4 case studies; Otemachi 1-1, Shinonome, Shibuya Station and Osiage-Narihirabashi were delivered to review public sectors' roles. Central government, local government and public developer play key roles each step. Urban Regeneration Special Act doesn't set up public sector's role to deliver urban regeneration projects after establishment of master plan. These cases build the governance organization to deliver urban regeneration projects among diverse interest groups including private sectors and landowners. Especially, public developers play a key role as a coordinator and a developer throughout whole urban regeneration projects.