The Analysis of the Major Cost-increasing Risk Factors from the Perspective of Construction Management -Focusing on Pre-construction Phases- (건설사업관리자 관점에서의 주요 사업비 초과 리스크 요인 분석 -시공 전(前)단계를 중심으로-)

  • Kim, Byung-Yong;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.147-155
    • /
    • 2012
  • Recently, various construction projects are invested with plenty capital, manpower and resources. The advanced methods of the construction management is introduced to Korea. However, the cases which get involved in excessive cost frequently occur. We can explain it means that the cost management in the entire phases and the risk factors in its works has not been done yet as expected. Thus, it is necessary to unearth risk factors relative to cost management and analyse them for preventing cost-increasing and the success of projects. In this point of view, this study aims to identify the risk factors of the cost management focused on pre-construction stages from the perspective of construction management which is possible to take part in the whole phases and works in cost management. Also, the impact priority and grade of risk factors to cost-increasing are evaluated by using FMEA.

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.

A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment (회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구)

  • Lee Man-Hee;Lee Hak-ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.226-229
    • /
    • 2003
  • Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

  • PDF