• Title/Summary/Keyword: 사석제

Search Result 41, Processing Time 0.025 seconds

Condition-Based Model for Preventive Maintenance of Armor Units of Rubble-Mound Breakwaters using Stochastic Process (추계학적 확률과정을 이용한 경사제 피복재의 예방적 유지관리를 위한 조건기반모형)

  • Lee, Cheol-Eung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.28 no.4
    • /
    • pp.191-201
    • /
    • 2016
  • A stochastic process has been used to develop a condition-based model for preventive maintenance of armor units of rubble-mound breakwaters that can make a decision the optimal interval at which some repair actions should be performed under the perfect maintenance. The proposed cost model in this paper based on renewal reward process can take account of the interest rate, also consider the unplanned maintenance cost which has been treated like a constant in the previous studies to be a time-dependent random variable. A function for the unplanned maintenance cost has been mathematically proposed so that the cumulative damage, serviceability limit and importance of structure can be taken into account, by which a age-based maintenance can be extended to a condition-based maintenance straightforwardly. The coefficients involved in the function can also be properly estimated using a method expressed in this paper. Two stochastic processes, Wiener process and gamma process have been applied to armor stones of rubble-mound breakwaters. By evaluating the expected total cost rate as a function of time for various serviceability limits, interest rates and importances of structure, the optimal period of preventive maintenance can easily determined through the minimization of the expected total cost rate. For a fixed serviceability limit, it shows that the optimal period has been delayed while the interest rate increases, so that the expected total cost rate has become lower. In addition, the gamma process tends to estimate the optimal period more conservatively than the Wiener process. Finally, it is found that the more crucial the level of importance of structure becomes, the more often preventive maintenances should be carried out.

Experimental Study on Bank Protection System using Fabric Foam (친환경 섬유대공 하천호안공법의 현장계측 연구)

  • Kim, Jin-Man;Cho, Sam-Deok;Choi, Bong-Hyuck;Kwak, Ki-Seok;Woo, Hyo-Seop;Ahn, Hong-Kyu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.3 no.2
    • /
    • pp.3-11
    • /
    • 2004
  • Fabric Foam systems provide a variety of flexible bank protection for open channels and hydrulic structures. The structural performance and durability of conventional bank protection materials such as concrete, gravel, riprap and vegetation can be significantly improved by confining the materials within the cells of Fabric Foam system. This paper presents the results of field and laboratory tests carried out to evaluate the performance of new Fabric Foam System as a Bank Protection. The results of the tests confirmed effect of Fabric Foam System in Bank Protection.

  • PDF

Experiments for Amour Stability of Low Crested Structure Covered by Tetrapods (저 마루높이 구조물의 피복재 안정성 실험: Tetrapod 피복 조건)

  • Lee, Jong-In;Bae, Il Rho;Moon, Gang Il
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.769-777
    • /
    • 2019
  • Low crested coastal structures such as detached breakwaters and submerged breakwaters (artificial reefs) have been commonly used as coastal protection measures. The armour units of these structures are unstable than those in non-overtopped structure cases. The stability of low crested structures armoured by rock has been suggested in existing studies. In this study, the stability of Tetrapods armour units on theses structures has been investigated using two-dimensional hydraulic model tests. The effect of wave steepness and freeboard on the armour stability on crest, front, and the rear slope has been investigated. Armour units were mostly damaged near the upper part of the seaward slope and the crest of the seaward side. From the experimental data, the new empirical formula for the stability coefficients of the Tetrapods was proposed.

Comparisons of Physical Activity and Sedentary Life according to Health and Obesity Level (대사적 건강 및 비만상태에 따른 신체활동과 좌식생활의 차이 비교)

  • Sa, Seok-Eun;Kim, Won-Hyun;Jo, Kyu-Kwon;Lee, Ji-Young
    • Journal of Digital Convergence
    • /
    • v.15 no.4
    • /
    • pp.477-488
    • /
    • 2017
  • The purpose of this study was to investigate difference of Physical Activity and Sedentary Life according to Health and Obesity status. A total of 4,783 adults participated in this study. The subjects were divided to four group(metabolically healthy normal weight; MHNW, metabolically unhealthy normal weight; MUNW, metabolically healthy obesity; MHO, metabolically unhealthy obesity; MUO) and analyzed clinical character, physical activity, and sedentary life time. As results, Compared with MHNW, MHO was higher physical activity and sedentary time but there was no notable differences. Compared with MHNW, MUNW was higher physical activity and lower sedentary time but there was no notable differences. Compared with MUNW, MHO was lower physical activity and sedentary time but there was no notable differences. In conclusion, we suggest that MHO has high physical activity comparing nomal weight group relatively.

A Study on the Standardization of Construction Types for the Management of River Project (하천사업 공사관리를 위한 공종 표준화 방안 연구)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.486-486
    • /
    • 2021
  • 국가에서는 수해예방 및 주민들의 삶의 질 향상을 위해 다양한 하천사업을 수행한다. 국토교통부의 경우 매년 막대한 예산을 투입하여 하천정비 및 재해복구사업 등을 추진 중에 있으나, 체계적인 공사관리와 산출물의 전산화를 위한 시스템은 부재한 실정이다. 현재 건설사업정보시스템(건설CALS)을 통해 하천공사에 관한 정보를 확인할 수 있으나 총 공사비, 참여업체 등 기본적인 정보만을 제공하고 있으며, 공정관리 및 예산정보에 관한 상세한 내역을 확인 및 관리할 수 있는 기능은 부재하다. 이러한 문제를 해결하고자 본 연구에서는 하천사업(공사)관리시스템의 필요성을 제시함과 동시에 우선적으로 하천사업 공종 표준화를 수행하고자 한다. 현재 건설공사표준품셈을 통해 건설공사의 공종을 확인할 수 있으나 '제2장 하천공사' 내에는 사석, 돌망태, 하천호안공에 관한 정보만을 담고 있다. 하천공사 공종 표준화를 진행하게 될 경우 공종별 공사 세부정보에 대한 관리가 가능해지며, 현재 하천을 관리 중인 국토교통부, 지방국토관리청 및 지자체 등 하천사업을 수행 중인 기관의 시스템 활용도를 제고할 수 있다. 하천사업 공종표준화를 위해 우선적으로 현재 건설공사표준품셈, 도로대장 전산화 입력지침 등기 수립된 지침 및 기준을 통해 건설토목공사 시의 공종을 조사·분석한 후, 하천공사 준공보고서 및 감리보고서 등 공사 관련 자료를 활용하여 하천공사에 주로 수행되는 공사들에 관한 종류를 도출하였다. 이후 건설토목공사 공종과의 비교·분석을 통해 하천공사에서 주로 수행되는 공종을 도출·표준화하는 작업을 진행하였다. 본 연구에서 제시한 하천사업 공종의 경우 향후 하천사업(공사)관리시스템 개발에 활용이 가능하며, 하천공사 관리의 효율성을 극대화할 수 있다.

  • PDF

Depression of Maternal Immune Response during the Period of Implantation in Rabbits (토끼의 착상기간 중 모체의 면역 억제 현상에 관한 연구)

  • Cho, Hye-Seong;Ryu, Kyung-Za;Hong, Sa-Suk
    • The Korean Journal of Pharmacology
    • /
    • v.23 no.2
    • /
    • pp.143-149
    • /
    • 1987
  • We determined the maternal peripheral lymphocyte response to mitogen during the period of implantation and evaluated the effects of hormones, which are known to be involved in the process of implantation, on the lymphocyte activity in rabbits. As compared with peripheral lymphocyte activity in non-pregnant rabbits, lymphocyte activity was significantly depressed on days 6, 7 and 9 of pregnancy. Although concentrations of serum progesterone were gradually increased during the implantation period, progesterone did not inhibit lymphocyte activity at physiological concentration. Serum $PGF_{2{\alpha}}$ was significantly increased on day 7 while PGE was slightly increased. $PGF_{2{\alpha}}$ did not modify lymphocyte activity even with greater concentrations than physiological level. However, lymphocyte activity was significantly inhibited by PGE even with physiological doses. The treatment of indomethacin at doses of 0.1 or $1.0\;{\mu}g/ml$ tended to enhance lymphocyte response, which was depressed on day 8 of pregnancy, 28% or 23% respectively. Although in non-pregnant rabbit, enhancement of lymphocyte response was also shown after the treatment of indomethacin, this enhancement was much less than that in pregnant rabbits. These results strongly suggest that maternal immune response was depressed during the process of implantation and PGE might be one of factors for immunomodulation during this period.

  • PDF

Case History of Sea Dyke Filter Construction Using Geotextile Tube Mattress (튜브형 매트리스를 활용한 방조제 필터공 축조사례연구)

  • Oh, Young-In;Yoo, Jeon-Yong;Kim, Hyun-Tae
    • Journal of the Korean Geosynthetics Society
    • /
    • v.6 no.1
    • /
    • pp.9-16
    • /
    • 2007
  • Geotextile is one of the most useful and effective polymer material in civil construction works and the main function of geotextile is separation, reinforcement, filtering and drainage. Recently, because of the shortage of natural rock, traditional forms of river and coastal structures have become very expensive to build and maintain. Therefore, the materials used in hydraulic and coastal structures are changing from the traditional rubble and concrete systems to the cheaper materials and systems. One of these alternatives employs geotextile tube technology in the construction of coastal and shore protection structures, such as embankment, see dyke, groins, jetties, detached breakwaters and so on. Geotextile tube technology has changed from being an alternative construction technique and, in fact, has advanced to become the most effective solution of choice. This paper presents case history of sea dyke filter construction using geotextile tube mattress and also, various issues related to the tube mattress design and construction technology.

  • PDF

Comparative Study of Reliability Design Methods by Application to Donghae Harbor Breakwaters. 2. Sliding of Caissons (동해항 방파제를 대상으로 한 신뢰성 설계법의 비교 연구. 2. 케이슨의 활동)

  • Kim, Seung-Woo;Suh, Kyung-Duck;Oh, Young-Min
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.18 no.2
    • /
    • pp.137-146
    • /
    • 2006
  • This is the second of a two-part paper which describes comparison of reliability design methods by application to Donghae Harbor Breakwaters. In this paper, Part 2, we deal with sliding of caissons. The failure modes of a vertical breakwater, which consists of a caisson mounted on a rubble mound, include the sliding and overturning of the caisson and the failure of the rubble mound or subsoil, among which most frequently occurs the sliding of the caisson. The traditional deterministic design method for sliding failure of a caisson uses the concept of a safety factor that the resistance should be greater than the load by a certain factor (e.g. 1.2). However, the safety of a structure cannot be quantitatively evaluated by the concept of a safety factor. On the other hand, the reliability design method, for which active research is being performed recently, enables one to quantitatively evaluate the safety of a structure by calculating the probability of failure of the structure. The reliability design method is classified into three categories depending on the level of probabilistic concepts being employed, i.e., Level 1, 2, and 3. In this study, we apply the reliability design methods to the sliding of the caisson of the breakwaters of Donghae Harbor, which was constructed by traditional deterministic design methods to be damaged in 1987. Analyses are made for the breakwaters before the damage and after reinforcement. The probability of failure before the damage is much higher than the allowable value, indicating that the breakwater was under-designed. The probability of failure after reinforcement, however, is close to the allowable value, indicating that the breakwater is no longer in danger. On the other hand, the results of the different reliability design methods are in fairly good agreement, confirming that there is not much difference among different methods.

The Practical Simplified Equation for Settlement Evaluation of Counter Facility in Soft Ground Centering on Rubble Mound (연약지반에 설치된 항만 외곽시설의 안전점검을 위한 침하 평가 간편식 제안 - 사석경사제 중심으로)

  • Kim, Yong-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.317-324
    • /
    • 2020
  • In this study, a simplified equation for settlement evaluation suitable for the special conditions of a counter facility is suggested. Recently, counter facilities, especially breakwaters, are constructed on soft ground in distant seas as new-port development projects. A counter facility that resists the external forces by self-weight settles easily when constructed on soft ground. Settlement in a counter facility and breakwater is not an important factor for maintenance than a land facility. On the other hand, the current settlement evaluation criteria are excessive for conducting a safety inspection. A settlement evaluation from a safety inspection followed by "Detailed Guidelines for a safety inspection on a counter facility" is used. A simplified equation was proposed to calculate the maximum settlement by applying the allowable residual settlement or settlement stability evaluation results. The suitability of the simplified equation was assessed compared to the assessed rating from the settlement survey results. The proposed simplified equation showed that the settlement evaluation rating had been upgraded. The proposed simplified equation is expected to be used to evaluate the practical structural stability and functional performance.

Effects of pH-Eh on Natural Attenuation of Soil Contaminated by Arsenic in the Dalchen Mine Area, Ulsan, Korea (비소로 오염된 달천광산 토양의 자연저감 능력에 대한 pH-Eh영향)

  • Park Maeng-Eon;Sung Kyu-Youl;Lee Minhee;Lee Pyeong-Koo;Kim Min-Chul
    • Economic and Environmental Geology
    • /
    • v.38 no.5 s.174
    • /
    • pp.513-523
    • /
    • 2005
  • The contamination of soils and groundwaters in the Dalcheon mine area, Ulsan, is investigated, and a natural attenuation capacity on redox and pH is evaluated. Arsenopyrite, the major source of arsenic pollution in the Dalcheon mine area, is contained up to $2\%$ in tailings. Furthermore, As-bearing minerals such as loellingite, nicolite, rammelsbergite, gersdorffite cobaltite and pyrite are also source of arsenic contamination, which show various concentration of arsenic each other. Surface of pyrite and arsenopyrite in tailings partly oxidized into Fe-arsenates and Fe-oxides, which means a progressive weathering process. There is no relationship between pH and arsenic content in groundwaters, otherwise Eh and arsenic concentration in unsaturated and saturated groundwater shows positive relationship. RMB (Red Mud Bauxite) could be useful as a trigger on natural attenuation due to superior ability of removal capacity of arsenic when contaminated soil and groundwater in the Dalcheon mine area are remediated.