• Title/Summary/Keyword: 사무소건물

Search Result 126, Processing Time 0.025 seconds

A Study on the Energy Efficiency Improvement according to Operation Condition of Solar Thermal System in Office Buildings (사무소 건물의 태양열 시스템 운영조건 변화에 따른 에너지 효율 향상에 관한)

  • Jung, Young-Ju;Kim, Seok-Hyun;Lee, Yong-Ho;Hwang, Jung-Ha;Cho, Young-Hum
    • Journal of the Korean Solar Energy Society
    • /
    • v.34 no.5
    • /
    • pp.109-115
    • /
    • 2014
  • The supply rate of renewable energy has been increasing under the influence of an energy scarcity. Government has supported the use of renewable energy by government subsidies. The operation of renewable may not been operating appropriately, although increasing the use of renewable energy. We found out some problems of the operation of renewable energy and offered some improvements. This research proposes the efficient operation method for the solar thermal system, and proposed operation method was compared and evaluated with existing operation strategy after selecting one building installed solar thermal system. Recently, the interest to renewable energy has increased because of the environmental issues and energy crisis. However the utilization of the renewable energy system is low because of the use of renewable energy system and existing renewable energy system independently, although supply rate of renewable system is increasing. Especially, in the case of solar thermal system heating load is not responsible for the load of hot water supply in many cases. Therefore, suggesting efficient operation plans and evaluations of the energy consumption and efficiency of a solar thermal system is needed.

The Estimation of Heating, Cooling Load and Economical Efficiency Analysis of Insulation Paint Coating Windows (단열 도료 코팅 창호의 냉난방부하 특성분석 및 경제성 평가)

  • Jeong, Yeol-Wha;Kim, Byoung-Soo
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.6
    • /
    • pp.95-102
    • /
    • 2011
  • The purpose of study is to estimate heating, cooling load performance and economic efficiency in office building with applied the functional paint. this paint can reduced SHGC(Solar Heat Gain Coefficient) on the glazing surface by coating. In this study, estimated to compared with double glazing, low-e glazing, IP(Insulation Paint) and IPu(Insulation UV-Cut Paint) coating glazing. As a result of this study, 1)heating & cooling load Analysis, SHGC value and U-factor of double glazing is about 0.70 and 3.29($W/m^2K$). low-E glazing is about 0.65 and 2.70($W/m^2K$). Two-side it is about 0.27 and 3.25($W/m^2K$). When compared to double glazing, annual heating & cooling load of low-E glazing, Two-side IPu and IP paint coating glazing is 3,012MWh($124kWh/m^2$), 2,910MWh($120kWh/m^2$), 2,867MWh($118.4kWh/m^2$) and 2,867MWh($118.4kWh/m^2$). It i sreduced to 2.0%, 5.2%, 6.7%, and 6.7% respectively. 2)the estimation of economic efficiency, low-e glazing installed in office building can not recover the investment within a lifetime 40years. but IPu and IP paint, two-side coating in glazing, have a payback period of 13 years respectively.

Development of the Preliminary Cost Estimate Method for the Free-Form Building Facade Trade in Conjunction with the Panel Optimization Algorithm Process (곡면 최적화 알고리즘을 활용한 비정형 건축물 외장공사비 개산견적에 관한 연구)

  • Lim, Jang Sik;Ock, Jong Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.95-106
    • /
    • 2014
  • The outer surfaces of free form buildings contain panels with two-directional curvatures. To construct these panels, complex geometric surfaces should be divided into forms and sizes that can be manufactured and constructed efficiently. Because the bigger the curvatures of these panel, the more expensive the construction costs, these complex curvatures should go through optimal process of reinterpretation to minimize the curved surfaces with complex two-directional curvatures, which is called panel optimization. Small construction and design companies have trouble in calculating even rough estimate and cannot adjust expected construction cost of the panels based on comparison of design alternatives in conjunction with panel optimization process due to lack of knowledge and experience. This study conducts the research that can support designers' cost decision-making in the design stage of the free form buildings with respect to the panel optimization process. A 3D commercial application specialized to modeling free form shapes is used for the purpose.

Development of System Module Based on BIM Technical Contents Data (BIM 기술콘텐츠 데이터 활용 시스템 모듈 개발)

  • Cho, Hyun-Jung;Jang, Jin-Seok;Kim, Yeon-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.680-687
    • /
    • 2016
  • Small and middle sized architectural design firms still have trouble using BIM (Building Information Modeling) for their tasks, which means that it is necessary to develop BIM Libraries and Technical contents. These BIM libraries should be based on common technical standards that reflect the technical contents to provide optimum BIM design support. This is essential to reduce the technological burden on the design office, because BIM does not just involve the 3D modeling of the design, but provides very important information for calculating the quantity of materials required for the construction and providing materials for the design work. Therefore, this research was aimed at improving the efficiency of the BIM design process by developing a system module based on the BIM technical contents data for the purpose of linking the BIM data and technical contents. The developed system module will be expanded to other uses of BIM in the long term.

A Study on Architectural Characteristics Based on the Building Composition, Structure, and Construction Background of Okcheon Ijidang (옥천 이지당(二止堂) 건립배경과 건물구성 및 구조를 통해 본 건축특징)

  • Nam, Chang-Keun;Hwang, Jin-Ha
    • Journal of architectural history
    • /
    • v.31 no.6
    • /
    • pp.17-32
    • /
    • 2022
  • Ijidang(二止堂) is a private village school (seodang, 書堂) established in Okcheon, north Chungcheong province where Jungbong Jo, Heon(重峯 趙憲, 1544-1592 AD) had trained for his sound mind and body(yusangcheo, 遊賞處). Jo, Heon was a notable Neo-Confucian scholar of the Kiho School and also a righteous general leading soldiers in Joseon Dynasty. According to Ijidanggi(二止堂記), Ijidang was constructed to honor Jo, Heon and to train local talents in 1647 with the support of Song, Si-yeol(宋時烈, 1607-1689 AD),a representative scholar belong to Kiho School and other local Confucian scholars. Ijidang currently consists of Main Body(本體) in the middle along with the East(Dong-lu 東樓) and the West Pavilions(Seo-lu 西樓) attached to each side. The Main Body and the Dong-lu firstly constructed were to give lectures and to rest within. Ijidang has undergone several changes in its form so far. The surrounding nearby Ijidang shows characteristics of the Confucian architecture for training(J eong-sa, 精舍) and the building itself was to be built in a scenic place apart from the secular world in which scholars stayed, cultivated their body and mind or taught disciples within. The lecture space of Ijidang is positioned next to the main hall(Dae-cheong 大廳) unlike other typical forms of a three-bay building(samganjije 三間之制) at that period. West lu, a two-story building added afterwards in the early 18th century representing characteristics of the Gate Pavilion(Mullu, 門樓) of Neo-Confucian Academies(Seo-won, 書院) in Joseon Dynasty was typically located where the entrance and the ground floor of the main building are visible simultaneously.

Success Factors of Scheduling in Small-Scale Building Construction with Owner-CM Delivery Method (건축주-CM 방식의 소규모 건축공사에서 공정관리 성공 요인)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.96-104
    • /
    • 2019
  • Recently, projects are being actively promoted to develop a new residential district centered around the metropolitan area, or to redevelop the residential area that was established long ago as unplanned land development. In this residential area, the owner can directly construct the building, and the way the building owner builds the residential house is called the direct construction of the owner. If the owner has the construction management (CM) capability while conducting direct management of the owner, the direct construction can be carried out by the CM method. This type of construction is called Owner-CM delivery method. However, it is very rare for small-scale construction in Korea to be implemented by the Owner-CM method. This may be due to the lack of knowledge and experience about the CM of the owner. In this study, we investigated the actual cases of the scheduling for the residential houses of similar size which were built at the same time in the residential housing complex developed near the metropolitan area. The purpose of this study is to derive the success factors of the scheduling in the small-scale construction from the cases carried out by the Owner-CM method. These success factors of the scheduling can be used as meaningful reference for the owners who want to build their own house in the future.