• Title/Summary/Keyword: 빌드

Search Result 101, Processing Time 0.028 seconds

An Approach to Recommending of Solutions for Resolving Gradle Build Error (Gradle 빌드 오류 해결을 위한 솔루션 추천 방안)

  • Kang, Mingu;Kim, Taeyoung;Kim, Suntae;Ryu, Duksan
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.6
    • /
    • pp.33-39
    • /
    • 2020
  • Developers spend considerable time manually repairing code that was not built during project construction. If the build fails, it is necessary to understand the failed execution, identify the cause of the failure, and then implement the solution. Build tools such as Gradle have been developed to reduce this effort and automate project construction. However, build tools still do not solve many errors, requiring developers to try to solve build errors. In this study, we propose a solution recommendation method to increase the success rate of Gradle build and reduce the effort required to resolve errors. We provide a way to collect build errors and a way to transition from build error messages to successful builds. In particular, 296 build error messages collected from Github's Java project are classified as solutions, and 89% show that the solution can be applied.

The design of Active build system For the provision of the optimized resources in a mobile environment (모바일 환경에서 최적화된 리소스 제공을 위한 능동적 빌드 시스템 설계)

  • Lee, Hyoun-sup;Kim, Jin-deog
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.392-394
    • /
    • 2016
  • 모바일 어플리케이션에 활용되는 리소스의 경우 사용되지 않는 데이터가 포함되는 경우가 많이 존재한다. 시스템 환경에 대응하기 위해 여러 가지 형태의 리소스를 구축하고 어플리케이션 실행 시 시스템 환경을 분석하여 구축된 리소스 중 최적화된 일부를 활용하여 어플리케이션이 구동된다. 이 경우 사용되지 않는 리소스 데이터 증가로 인해 한정적인 시스템 저장소에 영향을 주게 되며 설치된 어플리케이션의 수가 증가될수록 낭비되는 공간 또한 늘어난다. 본 논문에서는 이러한 불용 리소스의 증가로 인한 시스템 성능 저하를 해결하기 위해 능동적인 빌드 시스템에 대하여 제안한다. 제안하는 기법은 어플리케이션 설치 이전에 시스템의 정보를 확인하고 이에 따라 최적화된 리소스만을 활용하여 실행파일을 빌드하고 사용자에게 제공하는 방법이다. 이 방법을 적용할 경우 어플리케이션 설치 용량이 줄어들고 불필요한 리소스의 제공으로 인해 발생할 수 있는 시스템 용량 부족 문제를 해결할 수 있을 것으로 판단된다.

  • PDF

The Process Model for Project Management of Design-Build System and Constitution of Database (설계시공일괄 방식의 건축 프로젝트 관리를 위한 프로세스 모델 및 데이터베이스 구축)

  • Chun Jae-youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.109-116
    • /
    • 2005
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alternative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather din single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial t31ow-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigate throughly the function and information flows all over the design-build project. This research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to improve the consistency of functional process and minimize incoherent activities of the design-build projects.

A Process Model for Project Management of Design-Build System and Method for Constitution of Database (건축 프로젝트의 설계시공일괄 수행방식 관리를 위한 프로세스 모델 개발 및 데이터 베이스 구축 방안)

  • Kim Eui-Suk;Kim Chang-Gyo;Lee Kyung-Kook;Park Sang-Jun;Son Bo-Sik;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.242-245
    • /
    • 2004
  • Recently, the design-build delivery system is being generalized in domestic construction project. The design-build system is becoming an increasingly preferable alterative to design-bid-build delivering method. In design-build project, however, a large construction company and design firm make up consortium as a design-build contractor rather than single company performs design and construction work. In this case, usually the construction companies take a leading role but due to their lack of managerial know-how in the design-build system, they could miss the merits of this approach. Therefore, it is necessary to investigated throughly the function and information flows all over the design-build project. In this research suggests a process model and database in the whole phase of design-build project. This process model and database system will also support to Improve the consistency of functional process and minimize incoherent activities in each phase of design-build project.

  • PDF

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.

Tree Build Heuristics for Spatial Partitioning Trees of 3D Games (3D 게임 공간 분할 트리에서 트리 빌드 휴리스틱)

  • Kim, Youngsik
    • Journal of Korea Game Society
    • /
    • v.13 no.4
    • /
    • pp.25-34
    • /
    • 2013
  • Spatial partitioning trees are needed for processing collision detections efficiently. In order to select split planes for spatial partitioning trees, the tree balance and the number of polygons overlapped with the split plane should be considered. In this paper, the heuristic algorithm controlling weight values of tree build criteria is proposed for spatial partitioning trees of 3D games. As the weight values are changed, tree build time, T-junction elimination time which can cause visual artifacts in splitting polygons overlapped with the split plane, rendering speed (frame per second: FPS) according to tree balance are analysed under 3D game simulations.

Development of Build up Multilayer Board Rapid Manufacturing Process Using Screen Printing Technology (스크린인쇄 법을 이용한 Build-up다층인쇄회로기판의 쾌속제조공정 기술개발)

  • 조병희;정해도;정해원
    • Journal of the Microelectronics and Packaging Society
    • /
    • v.6 no.4
    • /
    • pp.15-22
    • /
    • 1999
  • Generally, many equipments and a long lead time ale required to manufacture the build-up multilayer board through various processes such as etching, plating, drilling etc. Wet process is suitable for mass production, however it is not adequate for manufacturing prototype in developing stage. In this study, a silk screen printing technology is introduced to make a prototype build-up multilayer board. As for the material photo/thermal curable resin and conductive paste are used for forming dielectric and conductor. And conductive paste fills vias for interconnecting each layer, and also is used for circuit patterning by silk screen technology. Finally, the basic concept and the possibility of build-up multilayer board prototype is proposed and verified as a powerful approach, compared with the conventional processes.

  • PDF

E-Walk Series Analysis Algorithm for Workcase Mining (워크케이스 마이닝을 위한 실행계열분석 알고리즘 설계)

  • Paik Su-Ki
    • Journal of the Korea Computer Industry Society
    • /
    • v.6 no.3
    • /
    • pp.437-446
    • /
    • 2005
  • Workflow mining is a newly emerging research issue for rediscovering and reengineering workflow models from workflow logs containing information about workflow being executed on the workflow engine. This paper newly defines a workflow process reduction mechanism that formally and automatically reduces an original workflow process to a minimal set of activities, which was used proposed 'E-walk series analysis algorithm'. Main purpose of this paper is to minimize discrepancies between the workflow process modeled and the enacted workflow process as it is actually being executed. That means, we compare a complete set of activity firing sequences on buildtime with workflow execution logs which was generate on runtime. For this purpose we proposed two algorithm, the one is 'Activity-Dependent Net Algorithm' and the other is 'E-Walk Series Analysis Algorithm'.

  • PDF