• Title/Summary/Keyword: 비상수리

Search Result 49, Processing Time 0.026 seconds

Design of Emergency Spillway Using Hydraulic and Numerical Model - ImHa Multipurpose Dam (수리모형실험과 수치모의를 이용한 비상여수로 설계-임하댐)

  • Jeon, Tae-Myoung;Kim, Hyung-Il;Park, Hyung-Seop;Baek, Un-Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1726-1731
    • /
    • 2006
  • Hydraulic and numerical models were applied to design the emergency spillway of ImHa multipurpose Dam. For the numerical model, FLOW-3D was used to evaluate the three-dimensional flow in the spillway. The results of hydraulic model were compared with those of the numerical model which were separated into four zones such as approaching zone, weir zone, transition & tunnel chute zone, and dissipator zone. Moreover, for optimum design of the spillway, the hydraulic and numerical models were performed for the basic plan. Solving the problems of the basic plan, the optimized alternative design was proposed. The numerical models for various conditions of the spillway were performed, which is not always feasible in the hydraulic models. Verified by using the hydraulic models, the optimum alternative design was proposed.

  • PDF

A Comparative Study on 1D and 2D Hydraulic Analysis Model for Emergency Action Plan (비상대처계획 활용을 위한 1차원 및 2차원 수리해석모형의 비교 검토 연구)

  • Kim, Tae Hyung;Kim, Ji Sung;Lee, Young Gon;Kwak, Jae Won;Choi, Kyu Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.350-350
    • /
    • 2016
  • 댐 및 저수지 시설물의 붕괴에 대비하기 위한 댐 붕괴 비상대처계획 수립은 대규모 인명 또는 재산의 피해를 예방하기 위한 중요한 비구조적 대책중의 하나이다. 특히 대규모 댐붕괴로 인한 재난 발생시 국민의 생명과 재산 피해를 최소화하기 위해 댐 시설물의 관리주체 및 유관기관은 발생가능한 비상상황을 미리 예측하고, 대응조치를 신속하고 효율적으로 집행해야 한다. 댐 붕괴 비상대처계획 수립을 위해 가장 중요한 사항은 댐 붕괴 위험도를 파악하고, 발생가능한 여러 시나리오에 따른 댐 하류부의 피해정도를 예측하는 일이다. 댐 붕괴 비상대처계획 시 작성되는 홍수범람 지도는 댐 붕괴사고가 발생했을 때 주민대피계획 및 위험지역 교통통제, 응급의료활동 및 생필품 공급 등, 비상대처계획 수립을 위한 가장 기본적인 자료가 된다. 현재 우리나라는 댐 붕괴 비상대처계획 수립을 위해 1차원 또는 2차원 수리해석 모형을 이용하여 홍수범람지도를 작성하고 있다. 전체적인 비상대처 계획도 작성을 위해 댐 붕괴로 인한 홍수파 해석이 가능한 1차원 수리해석 모형을 주로 이용하지만, 홍수파가 전파되는 하류부의 지형학적 특성상 2차원 해석이 필요한 지역에 대해 2차원 수리해석 모형을 이용하여 추가의 검토가 이루어지고 있다. 본 연구에서는 비상대처계획시 동시에 활용되는 1차원 수리해석 모형과 2차원 수리해석 모형의 특성을 각각 분석하고, 시범지역의 가상 댐 붕괴사상에 대해 적용함으로써, 각 모형의 장단점과 적용성에 대한 비교 검토 연구를 수행하였다. 낙동강유역내 위치한 다목적댐에 대해 1차원 및 2차원 붕괴모의를 실시하였으며, 여러 시나리오에 대해 1차원 모형과 2차원 모형 각각에 대해 동일하게 적용함으로써 두 모형의 모의 결과에 대한 비교 분석을 실시하였다. 본 연구를 통해 비상 대처계획 수립을 위한 홍수범람지도 작성 시 1차원 모형과 2차원 모형의 장점을 각각 반영할 수 있도록 홍수범람지도를 효율적이고 정확하게 작성하기 위한 제언을 제시하고자 하였다.

  • PDF

A Study on Solving High Pressure Problems Possible in Emergency Interconnection Operation in Water Distribution Systems (상수관망에서의 비상연계 운영 시 발생 가능한 고압 문제 해결에 대한 연구)

  • Kim, Su Ri;Gim, A Rin;Jun, Hwan Don
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.202-202
    • /
    • 2019
  • 상수관망 시스템의 목적은 수요자에게 양적으로 안정하고 질적으로 안전한 용수를 적정 수압으로 공급하는 것이다. 그러나, 상수관망 시스템은 노후화, 시공 중 파손 등 다양한 내 외적 요인들에 의해 파괴가 불가피하며, 이를 복구하는 과정에서 단수는 필연적으로 발생하게 된다. 단수피해를 효율적으로 감소시키는 방법은 인근 배수블록과의 비상연계를 실시하는 것이다. 비상연계란, 관망의 파손 등 비정상상황 발생 시 단수구역에 용수를 공급하기 위해, 인접한 배수블록과 연결된 비상관로를 운용하여 인접 배수블록으로부터 단수구역에 용수를 공급하는 것을 의미한다. 본 연구에서는 비상연계 시 연계공급을 실시하는 배수블록에서의 문제점이 아닌 연계공급을 받는 배수블록에서의 문제점을 실제 A시 관망을 바탕으로 분석하고, 이에 대한 해결책을 제안하였다. 실제 A시에서는 직경 600mm 간선관로(수지식)의 파손으로 2지 배수블록 하단부가 단수되는 사고가 발생하였다. 이에 단수피해를 최소화하고자 인근 배수블록인 1지 배수블록과의 비상연계를 실시하였으나, 2지 배수블록 하단부의 말단부분에서 고압이 발생하고 관로 파손과 같은 추가적인 문제가 발생하였다. 본 연구에서는 A시에서 실시한 비상연계 시나리오를 구축한 후 수원에서의 유한함을 고려할 수 있는 A-PDA 기반 수리해석을 실시하여 대한 고압발생의 원인을 분석하였다. 고압 문제의 원인은 연계 공급을 실시하는 1지 배수블록과 2지 배수블록간의 고도차에 의해 발생한 것으로 사료되며, 이에 대한 해결책으로 감압밸브 추가 설치, 주요 관로 복수화 방안을 제시하였다. 이후 각 해결책에 따른 모델을 구축한 후 수리해석을 실시하여 해결책이 상수관망에 미치는 영향을 분석하였다. 본 연구는 실제 관망에서 비상연계 시 발생한 문제를 분석함으로써 비상연계 시스템 구축 시 추가적으로 발생 가능한 문제 및 해결방안을 제안하였다.

  • PDF

An application of the A-PDA model and the water supply performance index for the temporal and spatial evaluation of the performance of emergency water supply plans via interconnections (비상시 용수 연계공급 성능의 시·공간적 평가를 위한 A-PDA 모형 및 공급성능지표의 적용)

  • Oak, SueYeun;Kim, SuRi;Jun, Hwandon
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.11
    • /
    • pp.977-987
    • /
    • 2018
  • The purpose of the water distribution system is gradually changing to increase the flexibility for responding to various abnormal situations. In addition, it is essential to improve resilience through preparing emergency plans against water supply failure. The most efficient way is emergency interconnections which supply water from interconnected adjacent blocks. To operate successful interconnections, it is essential to evaluate the supply performance in spatial and temporal aspects. The spatial and temporal aspects are dominated by its interconnected pipes and interconnected reservoirs respectively. In this study, an emergency interconnection scenario where problem occurred in reservoir 1 at 0:00hr in A city, Korea. An Advanced-Pressure Driven Analysis model was used to simulate the volume and inflow volume of the interconnected reservoirs. Based on the hydraulic analysis results, a multi-dimensional evaluation of the supply performance was conducted by applying possible water supply range indicator (PWSRI) and possible water supply temporal indicator (PWSTI) which are based on fuzzy membership functions. As a result, it was possible to evaluate the supply performance on the sides of consumers in spatio-temporal aspects and to review whether established plans mitigate the damage as intended. It is expected to be used for decision making on structural and non-structural emergency plan to improve the performance of an emergency interconnection.

Improvement of Supervision Work in Cultural Heritage Repair (문화재 감리업무 개선방안 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo;Kim, Kyong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.1
    • /
    • pp.61-71
    • /
    • 2020
  • The Cultural Heritage Administration is operating the resident supervision and non-resident supervision system to prevent poor repair and ensure the quality of cultural heritage repairs And recently, responsible supervision system was introduced to enhance the supervision of cultural heritage repairs. However, many problems have arisen in the operation of the supervision work, and need improvement. Accordingly, this study improved the resident and non-resident supervision of cultural heritage repair and developed work guidelines for the responsible supervision. First, this research has derived unreasonable sectors and problems of work guidelines for resident supervision about cultural heritage repair and has suggested supervision work guidelines which are improved. Second, we have derived the problems of work guidelines for non-resident supervision about cultural heritage repair and has suggested non-resident supervision work guidelines which are improved. Third, this paper has proposed the development direction and detailed supervision work to perform responsible supervision as a result of the adoption of the supervision system for cultural heritage repair.

Evaluation of Emergency Water Supply Plan for Block System of Water Network using WaterGEMS (WaterGEMS모형을 이용한 상수관망 블록시스템의 비상급수계획 평가)

  • Baek, Chun-Woo;Jun, Hwan-Don;Kim, Joong-Hoon;Yoo, Do-Guen;Lee, Kwang-Choon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.6
    • /
    • pp.15-20
    • /
    • 2008
  • Hydraulic analysis of water distribution system can be divided into demand-driven analysis and pressure-driven analysis. Demanddriven analysis can give unrealistic results to simulate hydraulic conditions under abnormal operating conditions such as sudden demand increase and pipe failure. In Korea, demand-driven analysis has been used to establish emergency water supply plan in many water projects, but it is necessary to use pressure-driven analysis for establishment of emergency water supply plan. In this study, WaterGEMS model that was developed for pressure-driven analysis is used to evaluation of emergency water supply plan of J city. As the results, it was able to draw up more efficient plan for water supply in small block, and established emergency water supply plan of J city was determined to be appropriate.

Hydraulic & Hydrologic Design Criteria for an Emergency Drainage of Reservoir (II) (댐 비상방류 설계기준 선정을 위한 수리수문학적 검토(II))

  • Yi, Jaeeung;Son, Kwangik;Kang, Min Suk
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.3
    • /
    • pp.159-167
    • /
    • 2015
  • Low-level outlets are necessary to empty reservoir storage in case of emergency such as abrupt storage level rise due to storm, dam body inspection as well as initial reservoir storage filling. However, the Korean standard for low-level outlet should be complemented. In this study, the HEC-ResSim model is utilized to simulate and calculate the capacity of the outlets and the days of release in order to evacuate reservoir storage safely. Three cases are analyzed according to its capacity. As a large dam with more than $1,000{\times}106m^3$ total capacity, Soyanggang Dam is selected and as a medium dam between $100{\times}106m^3$ and $1,000{\times}106m^3$ total capacity, Habcheon Dam is selected. Finally as a small dam with a total capacity less than $100{\times}106m^3$, Daegok Dam is selected. The size of low-level outlet and days of storage evacuation is estimated and the applicability of the analysis method is studied.

Implementation of the Voice and Data Communication-based Remote Monitoring System (음성 및 데이터 통신을 이용한 엘리베이터 원격감시 시스템 구현)

  • Lee, Wang-Hee;Song, Jae-Hong;Kim, Hyong-Suk
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.3198-3200
    • /
    • 2000
  • 엘리베이터의 고장 상태를 원격지에서도 상시 감시할 수 있는 시스템을 구현하였다 엘리베이터에 고장이 발생하는 경우에는 신속한 수리가 매우 중요하지만, 엘리베이터마다 전문 기술 인을 상시 근무시키는 일은 쉽지 않다. 본 논문은 최근 발달한 컴퓨터와 통신망 기술을 이용하여 대량의 엘리베이터를 원격지에서 전문적으로 감시하게 하여 엘리베이터 이용자에게는 보다 안전한 운전과 신속한 수리를 보장받게 하고 엘리베이터 관리회사는 신용과 효율성을 확보할 수 있게 하기 위한 것이다. 이 시스템은 엘리베이터 상태 감시 모듈, 비상사태 상태감시 모듈, 음성 및 데이터 통신망 및 원격 모니터링 시스템으로 구성된다. 상태 감시모듈은 엘리베이터의 비정상적인 동작을 상시 감시하여 이상 발생 시 엘리베이터의 관리회사에 즉시 통보하며, 비상사태 감시 모듈은 엘리베이터 내부의 소음 상태를 측정하여 강도나 엘리베이터의 갇힘 상태 등을 감시한다. 또, 음성 및 데이터 통신망은 기존의 전화 연결 망에 모뎀을 통하여 연결되게 함으로써 저렴한 가격으로 구성이 가능하게 하며, 원격 모니터링 시스템은 관리회사에 보고된 엘리베이터의 이상 상태를 그래픽을 통하여 적절히 표시하고 응급 조치 연락망에 연락하거나 수리에 필요한 기구나 부품들을 제시한다.

  • PDF

Hydraulic & Hydrologic Design Criteria for an Emergency Discharge of Reservoir (I) (댐 비상방류 설계기준 선정을 위한 수리수문학적 검토(I))

  • Son, Kwang Ik;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.3
    • /
    • pp.149-158
    • /
    • 2015
  • It is well known that emergency outlet works have to be provided for the safety of dams. However, concept of emergency outlet works did not applied for the design of the most dams in Korea. Korean design standard for low-level outlet works does not provide enough design criteria which could be used in design of emergency outlet works. In this research, as-built status and hydraulic design criteria of outlet works, such as drawdown rate or hydraulic pressure due to the impounded water depth, were examined. Another relationship between drawdown rate and the dam slope stability was also examined with SEEP model. It was found that 25% reduction of impounded water depth decreases the pressure forces about 50%. Therefore, outlet works should be designed to drawdown properly at the beginning of the emergency. Seepage analysis of dam bodies showed that most of Korean dams could safely stand for 1m/day drawdown rate. Higher drawdown rate could result high discharge so the drawdown rate must be related with the flood risk of downstream. Finally, multi-stage design was recommended that faster discharge for the initial 25% of water depth in 7-10 days than the rest of it in 1-2 months.