• Title/Summary/Keyword: 분배조

Search Result 132, Processing Time 0.022 seconds

A Study on the Clauses of Allocation of Costs in the Incoterms 2010 (Incoterms 2010의 비용분배조항에 관한 연구)

  • Jeon, Soon-Hwan
    • International Commerce and Information Review
    • /
    • v.14 no.3
    • /
    • pp.481-511
    • /
    • 2012
  • Incoterms 2010 Rules consist of 11 rules. The 11 rules are presented in "rules for any mode or modes of transport" and "rules for sea and inland waterway transport". The each rule of Incoterms 2010 rules has the guidance note, 10 articles(A1~A10) in relation to the seller's obligations and 10 articles(B1~B10) in relation to the buyer's obligations. The A6 and B6 of Incoterms 2010 rules, likewise previous Incoterms rules, have the article of allocations of costs. These articles of Incoterms 2010 rules provide the allocation of costs between the seller and the buyer. According to These A6 and B6, in principle, the seller must pay all costs relating to the goods until they have been delivered in accordance with A4, and the buyer must pay all costs relating to the goods from the time they have been delivered as envisaged in A4. The purpose of this paper is, therefore, to analyze the clauses of allocation of costs in Incoterms 2010 and to provide the problems of the clauses.

  • PDF

Simplified Load Distribution Factor Equation for the Design of Composite Steel Girder Bridges (강합성교 설계를 위한 하중분배계수 간략식)

  • Chung, Wonseok
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.2 s.75
    • /
    • pp.131-138
    • /
    • 2005
  • The AASHTO wheel load distribution factor (LDF) equation has been with us since 1931 and has undergone minor modifications. In 1994, an entirely new procedure was introduced in the AASHTO LRFD code based on parametric studies and finite element analyses. However, this LDF equation involves a longitudinal stiffness parameter, the design of which is not initially known. Thus, an iterative procedure is required to correctly determine the LDF value. The increased level of complexity puts undue burden on the designer resulting in a higher likelihood for misinterpretation and error. In this study, based on current AASHTO LRFD framework, a new simplified equation is developed that does not require an iterative procedure. A total of 43 representative composite steel girder bridges are selected and analyzed using a finite element model.The new simplified equation produces LDF values that are always conservative when compared to those obtained from the finite element analyses and are generally greater than the LDF obtained using AASHTO LRFD specification. Therefore, the proposed simplified equation is expected to streamline the determination of LDF for bridge design without sacrificing safety.

Effect of Cross Beams on Live Load Distribution in Rolled H-beam Bridges (압연형강(H형강) 거더교의 가로보가 활하중 횡분배에 미치는 영향)

  • Yoon, Dong Yong;Eun, Sung Woon
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.5
    • /
    • pp.535-542
    • /
    • 2006
  • In this study, the effects of cross beams on the lateral distribution of live loads in composite rolled H-beam girder bridges, were investigated through three-dimensional finite element analysis. The parameters considered in this study were the inertial moment ratio between the main girder and the cross beam, the presence of the cross beam, and the number of cross beams. The live load lateral distribution factors were investigated through finite element analysis and the customary grid method. The results show that there was no difference between the bridge models with and without a cross beam. The cross beam of the beam and frame types also showed almost the same live load lateral distribution factors. However, the finite element analysis showed that the concrete slab deck plays a major role in the lateral distribution of a live load, and consequently, the effect of the cross beam is not so insignificant that it can be neglected.

Optimization of distribution basin and ratio at valve opening in the water treatment process (정수공정에서 분배조 및 밸브 개도율 최적화)

  • Cho, Youngman;Ryu, Dongchoon;Yoo, Pyungjong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.5
    • /
    • pp.559-564
    • /
    • 2015
  • Distribution basins are used widely in the water treatment process. Uniform distribution at the distribution basin is an important because it affect precipitation efficiency of sedimentation basin. Generally distribution basin has a free surface water and is consisted of a weir. Study result, when inflow of distribution basin is less, amount of overflow is much at the nearest weir from the inlet. But when inflow is much, amount of overflow is much at the far weir from the inlet. The difference of distribution amount at the pipe is affected by the curvature and length of the pipe. The magnitude of the effect is determined by the relative energy loss and the flow state of the distribution basin. Optimization of the response surface method for minimizing an amount of deviation of the distribution is a very useful technique to determine the optimal ratio of the valve opening.

Load Distribution Factors for Two-Span Continuous I-Girder Bridges (2경간 연속 I-형교의 하중분배계수)

  • Back, Sung Yong;Shin, Gi Su
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.233-245
    • /
    • 2007
  • Previous finite element studies have shown that AASHTO Standard load distribution factor (LDF) equations appear to be conservative for longer spans and larger girder spacing, but too permissible for short spans and girder spacing. AASHTO LRFD specification defines the distribution factor equation for girder spacing, span length, slab thickness, and longitudinal stiffness. However, this equation requires an iterative procedure to correctly determine the LDF value due to an initially unknown longitudinal stiffness parameter. This study presents a simplified LDF equation for interior and exterior girders of two-span continuous I-girder bridges that does not require an iterative design procedure. The finite element method was used to investigate the effect of girder spacing, span length, slab thickness, slab width, and spacing and size of bracing. The computer program, GTSTRUDL, was used to idealize the bridge superstructures as the eccentric beam model, the concrete slab by quadrilateral shell elements, steel girders by space frame members, and the composite action between these elements by rigid links. The distribution factors obtained from these analyses were compared with those from the AASHTO Standard and LRFD methods. It was observed through the parametric studies that girder spacing, span length, and slab thickness were the dominant parameters compared with others. The LRFD distribution factor for the interior girder was found to be conservative in most cases, whereas the factor for the exterior girder to be unconservative in longer spans. Furthermore, a regression analysis was performed to develop simplified LDF formulas. The formulas developed in this study produced LDF values that are always conservative to those from the finite element method and are generally smaller than the LDF values obtained from the AASHTO LRFD specification. The proposed simplified equation will assist bridge engineers in predicting the actual LDF in two-span continuous I-girder bridges.

A Numerical Study on Load Distribution Factors for Simplified Composite H-Beam Panel Bridges (강합성 초간편 H형강 교량의 하중분배계수에 관한 해석적 연구)

  • Park, Jong Sup;Kim, Jae Heung
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.3
    • /
    • pp.221-232
    • /
    • 2009
  • The load distribution factor (LDF) values of simplified composite H beam panel bridges (SCHPBs) that were subjected to one lane and two lane loads were investigated using three dimensional finite element analyses with the computer program ABAQUS (2007). This study considered some design parameters such as the slab thickness, the steel plate thickness, the span length, and the continuity of the SCHPBs in the development of new LDFs. The distribution values that were obtained from these analyses were compared with those from the AASHTO Standard, LRFD, and the equations presented by Tarhini and Frederick, Huo et al., Back and Shin, and Cai. The AASHTO Standard distribution factors for SCHPBs were found to be very conservative. Sometimes, the distribution values from the finite element analyses for interior girders were similar to the results of the AASHTO LRFD, whereas the values for exterior girders were conservative in most cases. The new distribution values that were presented in this study produced LDFs that are more conservative than those from the finite element method. For the simple application of the design to SCHPBs, bridge engineers can use 0.42 for the interior girder and 0.32 for the exterior girder. The proposed values improve the current design procedure for the LDF problem and increase SCHPB design efficiency.

Study for Transient Voltage Characteristic by Power Switching on Aircraft Electrical Master Box (항공기용 전원분배장치의 전원개폐에 의한 과도전압 특성 연구)

  • Seo, Youngjin;Ji, Sangyong;Jo, Jihyung
    • Journal of Aerospace System Engineering
    • /
    • v.13 no.5
    • /
    • pp.24-31
    • /
    • 2019
  • In this study, we analyzed the cause of the burn out phenomenon in the power distribution system for aircraft and proposed the improvement method. The power distribution device for aircraft has an AC and DC, and there is a rectifier between the two devices. The capacitors in the power board burn out when the power is turned on and off. The main reason for this is the excessive voltage caused by the inductance built into the rectifier. The cases that can cause a failure are classified. The impact was analyzed and the solution was established through the experimental method.

광 CATV용 분배 시스템 개발

  • 이태훈;조재일;이수경;박애순;백인기;백인기;박승현;이만섭
    • Proceedings of the Korean Institute of Communication Sciences Conference
    • /
    • 1992.10a
    • /
    • pp.334-337
    • /
    • 1992

A Study on the Quality Improvement of Electrical Master Box in Aircraft Vibration Environment (항공기 진동 환경에서의 전원분배장치 품질개선 연구)

  • Seo, Youngjin;Lee, Yoonwoo;Jang, Minwook;Jo, Jihyung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.8
    • /
    • pp.181-189
    • /
    • 2019
  • An aircraft power distribution device distributes and controls the power generated by the generator and provides overcurrent protection. There are many defect phenomena that make AC power distribution impossible during flight, which poses a problem in because some electronic equipment cannot be operated. We describe a process of deriving the root cause of defects by using vibration testing equipment to simulate the vibration conditions during aircraft flight, which result in defects. The results show that the cause of the defect is internal wiring damage caused by the vibration of the contactor of the AC power distribution device. Therefore, the shape of the contactor was improved to solve this problem. We also improved the test procedure by performing defect detection tests using vibration testing equipment to detect a faulty contactor. As a result of the improvements, a component certification test and flight test proved that the defect phenomena of the AC electrical master box were improved.