• Title/Summary/Keyword: 분배계획

Search Result 159, Processing Time 0.029 seconds

A Study on Flow Distribution to Flocculation Basins Using DOE and RSA (실험계획법과 반응표면분석법을 적용한 응집지로의 유량분배에 관한 연구)

  • Kim, Seong-Jae;Kyung, Gyu-Sun;Jeong, Heui-Jung;Kim, Hyeong-Seop;Yang, Sa-Sun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.12
    • /
    • pp.918-928
    • /
    • 2013
  • The inequitable flow distribution to flocculation basins is an important problem faced in many water treatment plants. This is caused by the structure of a distribution channel, the height differences of outlet weirs etc. But, a modified approach for the structures has no effectiveness to achieve flow equality. The aim of this study is to reduce the inequality by adopting optimized inlet valve opening (%) of the flocculation basins using DOE (Design of Experiments) and RSA (Response Surface Analysis). The inlet valve openings (%) and inflow distributions (%) of 6 paralleled basins were set as factors (X) and characteristics(Y) respectively. 2 level factorial experiments and RSA were conducted for optimization and regression analysis (Y = f(X) + Const.). Adopting the optimized inlet valve opening (%) at field, standard deviation of flow distribution (%) and effluent turbidity was declined from 3.80% to 0.42% and from 0.29 NTU to 0.03 NTU respectively.

Reliability estimation for shared load model with guarantee time under censoring scheme (중도절단계획 하에서 보증시간을 가지는 부하분배모형의 신뢰도추정)

  • Cha, Young-Joon
    • Journal of the Korean Data and Information Science Society
    • /
    • v.20 no.3
    • /
    • pp.467-474
    • /
    • 2009
  • There are many situations arising in reliability engineering and biomedical science where failure of a subsystem increases the failure rate of other subsystem under shared load models. In this paper, the maximum likelihood estimates and the modified maximum likelihood estimates of mean time to failure and reliability function for shared load model with guarantee time are obtained by using censored system life data. Some illustrative examples are included.

  • PDF

Sensitivity Analysis of Water Supply-Wastewater Allocation Model (용수-폐수 분배모형의 민감도분석)

  • 이길성
    • Water for future
    • /
    • v.16 no.1
    • /
    • pp.41-48
    • /
    • 1983
  • The competition for water for municipal, industrial and agricultura and agricultural uses is growing keener as the world fooe and energy crises are intensifying. It is therefore becoming important how systems engineering techniques can be used to plan effectively for the future development of water supply and waste water management systems in a regional area. The feasible direction method and the out-of-kilter algorithm enable us to find the least-cost mix of alternative allocation networks. The interaction between land use patterns and urban water resources, and the environmental impact of alternative policies are discussed.

  • PDF

The Effective Demand Selection Method for Satisfying Service Levels in Supply Chains (서비스 수준을 고려한 공급 사슬 내의 효과적인 수요 선택 방안에 관한 연구)

  • 박기태;권익현;김성식
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.10a
    • /
    • pp.611-614
    • /
    • 2004
  • 현실에서의 공급사슬에 대한 분배 계획은 수요예측(forecasting)을 통해 얻어진 확률적인 분포(stochastic distribution)를 바탕으로 수립된다. 그러나 이러한 수요예측 값은 특정한 한 값을 갖는 것이 아니라 일반적으로 특정한 범위로써 존재하며 이 범위 내의 한 값을 의사 결정자가 선택하고 이를 바탕으로 분배 계획을 수립하게 된다. 하지만 수요의 불확실한 특성 때문에 효과적인 값을 결정하는 것은 쉬운 일이 아니다. 따라서 본 연구에서는 확률적인 형태의 다양한 수요 분포 형태를 정의하고, 이러한 여러 가지 분포 하에서 수요 선택에 영향을 주는 요소들을 판명한다. 이를 바탕으로 적절한 실험계획과 모의실험을 통해서 효과적인 수요선택 방안을 도출한다. 이와 같은 접근 방법을 통해 다양한 실험 조건 하에서 공급 사슬 내의 총 비용을 최소화 시키면서 동시에 목표로 하는 서비스 수준(target service level)을 만족하는 수요 선택 방안을 제시한다.

  • PDF

TSP Activity Support by Workload Balancing based on Schedule Change (일정 변경에 따른 업무 균등 분배를 통한 TSP 활동 지원)

  • Lee, Sang Hun;Choi, Ho-Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.11a
    • /
    • pp.268-271
    • /
    • 2010
  • TSP(Team Software Process)의 계획 단계에서는 계획된 프로젝트 일정에 맞춘 업무를 팀 리더 또는 계획관리자(plan manager)가 각 팀원에 할당하고, 업무수행 시에는 각 팀원이 할당된 업무를 적시에 수행하는지를 추적하여 일정지연을 방지해야 한다. 하지만 업무 할당에 있어 팀원의 능력, 일정 및 업무의 논리적인 순서가 고려되어야 하고, 업무 수행 시에도 수시로 변화하는 업무 일정으로 인해 할당된 업무를 일정에 맞추지 못하는 상황이 발생하며 이는 결국 일정지연으로 이어진다. 이러한 문제를 해결하기 위해 본 논문은 TSP 가 지원하는 업무 균등 분배(workload balancing)를 적용하여 해결하고자 하였으며, 이 활동을 지원하는 도구에 대해 소개한다.

Advanced High Frequency AC Propulsion System for Next Generation Electric Hybrid Vehicle

  • 김민회
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.2 no.1
    • /
    • pp.12-25
    • /
    • 1997
  • 본 논문은 PNGV 계획에 따른 차세대 전기자동차의 개발을 위하여 고주파 교류 전력분배 시스템을 적용하여 이용할 수 있는 추진력 장치의 구현 가능성에 대한 조사 연구이다. 실행 가능한 관점에서 전력 분배와 에너지원의 결합이 쉽게 이루어 질 수 있고 변환이 가능한 여러 가지 형태의 시스템이 비교 검토되었으며, 현재 기술 수준으로 보아 가까운 장래에 실현 가능한 최적의 시스템 구성은 배터리와 내연기관엔진 및 유도전동기를 이용하는 하이브리드형이 제시되었다. 각 시스템의 원활한 전력수급과 운전특성을 위하여 단상 고주파 교류 전력분배 제어기법을 적용하였으며, 이 시스템의 타당성을 입증하기 위하여 시스템 구성에 따른 모델링과 컴퓨터 시뮬레이션을 실시하였다. 이 결과 차세대 전기자동차용으로 제시된 고주파 교류 전력분배에 의한 하이브리드형 추진력 시스템이 가능하며 운전특성도 우수함을 보여주었다.

  • PDF

Scheduling Problem of Receiving and Shipping Trucks for Cross Docking Systems (크로스도킹시스템을 위한 하역과 선적 트럭의 일정계획)

  • Yu Woo yeon
    • Journal of the Korea Safety Management & Science
    • /
    • v.4 no.3
    • /
    • pp.79-93
    • /
    • 2002
  • Cross docking is a material handling and distribution concept in which products move directly from receiving dock to shipping dock, without being stored in a warehouse or distribution center. Depending on the facility and operating conditions or strategies employed, it is possible to generate various cross docking scenarios or models. The cross docking model, which is studied in this research, assumes there are a separate receiving dock and a separate shipping dock. It is also assumed that the products contained in a receiving truck and the products needed for a shipping truck are known in advance. Furthermore, the study is restricted to scenarios where there is only one receiving dock and only one shipping dock at the warehouse. The research objective is to find the best truck spotting sequence for both receiving and shipping trucks to minimize total operation time (i.e., the makespan) of the cross docking system.

A Multi-agent System based on Genetic Algorithm for Integration Planning in a Supply Chain Management (유전 알고리즘에 기반한 동적 공급사슬 통합계획을 위한 멀티 에이전트 시스템)

  • Park, Byung-Joo;Choi, Hyung-Rim;Kang, Moo-Hong
    • Journal of Intelligence and Information Systems
    • /
    • v.13 no.3
    • /
    • pp.47-61
    • /
    • 2007
  • In SCM (supply chain management), companies are pursuing a new approach through which overall functions within the supply chain, ranging from material purchase to production, distribution, and sales are designed, planned, and managed in an integrated way. The core functions among them are production planning and distribution planning. As these problems are mutually related, they should be dealt with simultaneously in an integrated manner. SCM is large-scale and multi-stage problems. Also, its various kinds of internal or external factors can, at any time, dynamically bring a change to the existing plan or situation. Recently, many enterprises are moving toward an open architecture for integrating their activities with their suppliers, customers and other partners within the supply chain. Agent-based technology provides an effective approach in such environments. Multi-agent systems have been proven suitable to represent domains such as supply chain networks which involve interactions among manufacturing organization, their customers, suppliers, etc. with different individual goals and propriety information. In this paper, we propose a multi-agent system based on the genetic algorithm that make it possible to integrate the production and distribution planning on a real-time basis in SCM. The proposed genetic algorithm produced near optimal solution and we checked that there is a great difference in the results between integrated planning and non-integrated planning.

  • PDF

Indivisible load scheduling applied to Linear Programming (선형계획법을 적용한 임의 분할 불가능한 부하 분배계획)

  • Son, Kyung-Ho;Lee, Dal-Ho;Kim, Hyoung-Joog
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2005.08a
    • /
    • pp.382-387
    • /
    • 2005
  • There are many studies on arbitrarily divisible load scheduling problem in a distributed computing network consisting of processors interconnected through communication links. It is not efficient to arbitrarily distribute the load that comes into the system. In this paper, how to schedule in case that arbitrarily indivisible load comes into the system is studied. Also, the cases of the divisible load mixed with the indivisible load that come into network were dealt with optimal load distribution in parallel processing system by scheduling applied to linear programming.

  • PDF

Application of CFD model for the design of multi-layer settling basin structure (이층 침전지 설계를 위한 CFD모형의 적용)

  • Yu, Chang-Hwan;Kim, Tae-Won;Kim, Nam-Il;Lee, Kil-Seoung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1677-1680
    • /
    • 2006
  • 하수처리장의 침전지 구조물은 고형물(SS) 및 현탁물을 침전, 제거하여 하수의 정화를 도모하는 시설로 초기 유입 하수의 생물학적 처리로 인해 발생되는 슬러지와 처리수를 분리함에 그 목적을 두고 있다. 침전지 구조물은 장소의 제약 및 침전지의 효율성 측면에서 많은 공법이 제안되고 있으며, 그중 이층 침전지의 경우 구조물의 시공비용 절감 및 공간 활용측면에서 단층 침전지에 비해 우수성을 인정받고 있다. 하지만 상 하 층에 위치하고 있는 침전지 유입부의 위치적 특성으로 인해 균등한 유량의 분배가 이루어지지 않고 유량이 한곳에 집중되는 현상으로 보일 수 있다. 본 연구에서는 3차원 수치모형인 FLOW-3D를 이용하여 이층 침전지의 유량분배 최적화를 위한 설계인자를 도출 하였다. 특히 상 하층에 위치하고 있는 유입부의 위치적인 특성을 고려하여 유입부의 직경을 상층 $500mm{\sim}600mm$, 하층 $500mm{\sim}700mm$으로 변화시키며 수치모의를 수행하였으며, 유입량의 분배효과를 확인하기 위해 각 동일한 위치에서 유입량을 산정하였다. 각 케이스별 분배효과를 분석한 결과 상 하층의 유입부 직경을 상층 600mm 와 하층 700mm를 적용했을 경우 유입량의 표준편차가 가장 작게 발생하며, 침전지 내부의 흐름이 원활하게 이루어지는 것으로 확인되었다. 본 연구에서는 상용 CFD모형인 FLOW-3D를 계획 중인 H하수처리장의 이층 침전지 설계에 적용하였으며 유입부 직경에 따른 분배효과를 분석하였다.

  • PDF