• Title/Summary/Keyword: 분리막 생물반응조

Search Result 24, Processing Time 0.023 seconds

Treatment of Textile Wastewater by Membrane-Bioreactor Process (막-생물반응조 공정을 이용한 염색폐수의 처리)

  • 강민수;김성수;황규대;강종림
    • Membrane Journal
    • /
    • v.7 no.4
    • /
    • pp.175-182
    • /
    • 1997
  • Membrane-bioreactor process which combines anaerobic-aerobic bioreactor and membrane process, was used to remove refractory organic susbstances and dye molecule in textile wastewater effectively. Direct feeding of raw feed water to membrane process caused serious fouling on membrane. On the other hand, pretreated feed by bioreactor before the membrane process remarkably reduced the fouling and prolonged the membrane life. Removal efficiency and fouling were more dependent on the material property of the membrane rather than the membrane pore size and structure. Operation mode of hollow fiber membrane module and linear velocity in the hollow fiber influenced the ramoval efficiency and the water flux of the membrane. The combined membrane- bioreactor process was more effective in treating the textile wastewater than each single process.

  • PDF

Reusing of Dye Wastewater through Combined Membrane Process (조합형 분리막 공정을 이용한 염색폐수의 재이용 연구)

  • 박헌휘;최호상
    • Membrane Journal
    • /
    • v.12 no.2
    • /
    • pp.67-74
    • /
    • 2002
  • Submerged membrane bioreactor(SMBR) and reverse osmosis(R/O) systems treated dye wastewater for reusing of industrial water. The permeate fluxes of SMBR at 20-25 cmHg of lab. test and field test were 10 LMH($1/m^2$.hr) all test. Removal efficiencies of CODcr, $COD_{Mn}$ and T-N were 93%, 90% and 60% in the SMBR, respectively The advanced treatment of combined process(SMBR+R/0) was accomplished for increasing the removal efficiency of non-biodegradable materials and T-N. Therefore, the removal efficiency of T-N obtained in 80% above, then nitrogen concentration was under 15 mg/L. The combined process(SMBR+R/0) was suitable to reuse of the dye wastewater.

Influence of Ammonia and Dissolved Oxygen Concentrations on Nitrite Accumulation in a MBR (MBR 반응조에서 아질산염 축적에 미치는 암모니아와 용존산소 농도의 영향 연구)

  • Choi, In-Su;Wiesmann, Udo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.29 no.8
    • /
    • pp.922-929
    • /
    • 2007
  • The complete oxidation of ammonia to nitrate is a distinctive two-step process divided into the oxidation of ammonia to nitrite(nitritation) by Nitrosomonas and the oxidation of nitrite to nitrate(nitratation) by Nitrobacter. The nitrogen removal via nitrite accumulation offers several advantages such as saving costs for aeration, saving carbon source and finally reduction of sludge discharge. In this work a suspended bioreactor coupled with membrane filtration(MBR) was used to find the process conditions of nitrite build-up. The MBR enables to reach sufficient nitrifying bacteria in the bioreactor, although the autotrophic bacteria can be easily washed out due to their lower growth rate. The dissolved oxygen concentration $c'_{O2}$ and ammonia concentration $c_{NH3}$ in the reactor were varied and investigated as parameters for nitrite accumulation. As a result the higher ammonia concentration in the reactor is very effective for starting nitrite build-up and the effect was strengthened in combination with lower dissolved oxygen concentration. With lower $c'_{O2}<0.3$ $mgL^{-1}$ $O_2$ and high $c_{NH3}=6.3\sim14.9$ $mgL^{-1}$ $NH_3N$ the 74% of the nitrite accumulation was achieved. Specially, it was found that the nitrite accumulation could occur not only in biofilm reactor as many references showed but also in the membrane bioreactor carried out in this study.

Fouling Mitigation for Pressurized Membrane of Side-Stream MBR Process at Abnormal Operation Condition (가압식 분리막을 이용한 Side-Stream MBR 공정의 비정상 운전조건에서 막 오염 저감)

  • Ko, Byeong-Gon;Na, Ji-Hun;Nam, Duck-Hyun;Kang, Ki-Hoon;Lee, Chae-Young
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.38 no.6
    • /
    • pp.323-328
    • /
    • 2016
  • Pressurized membrane used for side-stream MBR process requires fouling control strategy both for normal and abnormal operation conditions for stable operation of the facilities. In this study, $85m^3/day$ of pilot-scale side-stream MBR process was constructed for the evaluation of fouling mitigation by air bubble injection into the membrane module. In addition, fouling phenomena at abnormal operation conditions of low influent and/or loading rate were also investigated. Injection of air bubble was found to be effective in delaying transmembrane pressure (TMP) increase mainly due to scouring effect on the membrane surface, resulting in expanded filtration cycle at a high flux of $40L/m^2{\cdot}h$ (LMH). At abnormal operation condition, injection of PACl (53 mg/L as Al) into the bioreactor showed 19% reduction of TMP increase. However, inhibition of nitrifying bacteria by continuous PACl injection was observed from batch experiments. In contrast, injection of powdered activated carbon (PAC, 0.6 g/L) was able to maintain the initial TMP of $0.2kg/cm^2$ for 5 days at the abnormal conditions. It may have been caused from the adsorption of extracellular polymeric substances (EPS), which was known to be excessively released during growth inhibition condition and act as the major foulants in MBR operations.

Behavior of Soluble Microbial Products in a Submerged Membrane Separation Activated Sludge Process (침지형 막분리 활성오니법에 있어서 생물대사성분의 거동)

  • Cha, Gi-Cheol;Lee, Dong-Yeol;Shim, Jin-Kie;Lee, Yong-Moo;Yoo, Ik-Keun;Ann, Seung-Ho
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.22 no.5
    • /
    • pp.959-970
    • /
    • 2000
  • A laboratory-scale experiment was conducted to investigate the effect of soluble microbial products(SMP) on permeate flux in the submerged membrane separation activated sludge process. Continuous and batch filtration test were operated to understand mechanism of relationship between membrane fouling and SMP. Synthetic wastewater(phenol) was used as a carbon source. Hydraulic retention time(HRT) and mixed-liquor volatile suspended solids(MLVSS) of the reactor were kept at 12 hours and 9.000mg VSS/L, respectively. Batch filtration tests ($J_{60}/J_o$) using the mixed liquor from reactor showed that the increase of accumulated SMP concentration in the reactor caused to the decreasing permeate flux and the increasing of the adhesion matters which form cake and gel layer. The resistance value of cake layer was measured $2.9{\times}10^{10}{\sim}4.0{\times}10^{10}(1/m)$, this value showed more significant effect on flux drop than that of among other resistance layers. Batch phenol-degradation experiment was conducted to observe SMP type expected $SMP_{nd}$ and $SMP_{e}$ (SMP resulted from endogenous cell decomposition), these are non-biodegradable high molecular weight organic matter and playa significant role in permeate flux drop. Also, SMP concentration was accumulated as increased of HRT against flux drop.

  • PDF

A Study on Membrane Fouling Contaminants and Control in Enhanced Sewage Treatment by Submerged Membrane Bioreactor (침지형 분리막을 이용한 오수고도처리 공정의 막오염 원인물질 및 제어에 관한 연구)

  • Park, Chul-Hwi;Yun, Jae-Gon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.5
    • /
    • pp.619-627
    • /
    • 2004
  • Purposes of this study were to examine closely the extracellular polymeric substances (EPS) which was a membrane fouling contaminant, to control detected EPS by powdered activated carbon (PAC) dosage etc. and to evaluate the possibility of practical reuse facility. With high removal efficiency of general pollutants, when the PAC is added to MBR, improvement of removal efficiency of $COD_{cr}$, and color was expected and treated wastewater can be reused. It was judged that the correlation between EPS and membrane fouling was very high. Carbohydrate and DNA in the EPS were judged to be cause of membrane fouling. If EPS could be controled, not only membrane fouling would be decreased but also operation time would be extended. In experiment of powdered activated carbon (PAC), characteristics of the best PAC for membrane fouling control were the particle size of $7{\mu}m$, lodine Number of 1,050, surface area of peat of $1,150m^2/g$. In lab test, operation time of MBR by PAC dosage of 200mg/gVSS was longer than one of MBR by without PAC dosage. Because EPS, especially carbohydrate and DNA, was controled successfully by PAC, membrane fouling in MBR could be decreased.

Effects of Sludge Pre-Treatment on the Excess Sludge Production in a Membrane-Coupled Bioreactor (막결합형 생물반응조에서 슬러지 전처리가 잉여슬러지 발생량에 미치는 영향)

  • Lee, Kang-Hoon;Kim, Ju-Hyun;Nguyen, Hai;Yeom, Ick-Tae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.4
    • /
    • pp.565-572
    • /
    • 2011
  • The effects of chemical pretreatments on the excess sludge production in the membrane-coupled bioreactor were investigated. In addition, their effects on membrane fouling were also evaluated. Two membrane bioreactors were operated. In one reactor, a part of the mixed liquor was t reated with NaOH and ozone gas consecutively and was returned to the reactor. T he f lowrate of the chemical pretreatment stream was 1.5% of the influent flowrate. During the 200days of operation, the MLSS level in the bioreactor with mixed liquor pretreatment was maintained relatively constant at the range of 8,000 ~ 10,000$mg/{\ell}$ while it increased steadily up to 26,000 $mg/{\ell}$ in the absence of the pretreatment. Each reactor was equipped with two laboratory membrane modules where the flux for each module was 20, and 30 ${\ell}/m^2{\cdot}h$, respectively. With pretreatment, almost constant transmembrane pressure(TMP) was observed throughout the operation at the flux of 20 ${\ell}/m^2{\cdot}h$. Without pretreatment the membrane module at the same flux could also be operated at relatively stable condition. However, as the MLSS increases up to 25,000 $mg/{\ell}$, a fast TMP increase was observed. In conclusion, a complete control of excess sludge production in the membrane-coupled bioreactor was possible without significant deterioration of the treated water quality. In addition, it was shown that stable operation in terms of TMP is possible with sludge pretreatment and recirculation.

The Evaluation of Temperature Effect on Nitrogen RemovaI at Intermittent MBR System by Computer Simulation (컴퓨터 시뮬레이션을 이용한 간헐폭기 MBR공정에서의 운전온도 변화에 따른 질소제거 성능 평가)

  • Lee, Byonghi;Park, Min-Jung
    • Membrane Journal
    • /
    • v.22 no.6
    • /
    • pp.489-501
    • /
    • 2012
  • The nitrogen removal characteristics of the MBR system consisted of two intermittent reactors, a membrane reactor and a deaeration reactor under constant flow and wastewater composition at different operational temperature and SRTs (Sludge Retention Times) were studied by computer simulation. The nitrogen removal efficiencies were dropped from 59% to 31%, when operational temperature was increased to $25^{\circ}C$ from $13^{\circ}C$ with same SRT of 25 days. Lower RBO (Readily Biodegradable Organic) concentrations at intermittent reactors at $25^{\circ}C$ compared with those at $13^{\circ}C$ of operational temperature were believed to be the main cause. The nitrogen removal efficiencies and RBO concentrations at each intermittent reactors were recovered when SRT was reduced to 12.6 days at $25^{\circ}C$. The effect of both SRT and operational temperature on RBO concentrations at intermittent reactors is need to be studied further.

Nitrogen and Phosphorus Removal in Membrane Bio-Reactor (MBR) Using Simultaneous Nitrification and Denitrification (SND) (동시 질산화-탈질(SND) 반응을 적용한 MBR 반응조에서 질소 및 인 제거 특성)

  • Tian, Dong-Jie;Lim, Hyun-Suk;An, Chan-Hyun;Lee, Bong-Gyu;Jun, Hang-Bae;Park, Chan-Il
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.10
    • /
    • pp.724-729
    • /
    • 2013
  • Simultaneous nitrification and denitrification (SND) occurs concurrently in the same reactor under micro dissolved oxygen (DO) conditions. Anaerobic zone was applied for phosphorus release prior to an aerated membrane bio-reactor (MBR), and anoxic zone was installed by placing a baffle in the MBR for enhancing denitrification even in high DO concentration in the MBR. Phosphorus removal was tested by alum coagulation in the anaerobic reactor preceding to MBR. DO concentration were 2.0, 1.5, 1.0, 0.75 mg/L in the MBR at different operating stages for finding optimum DO concentration in MBR for nitrogen removal by SND. pH was maintained at 7.0~8.0 without addition of alkaline solution even with alum addition due to high alkalinity in the raw sewage. Both TCODcr and $NH_4^+$-N removal efficiency were over 90% at all DO concentration. TN removal efficiencies were 50, 51, 54, 66% at DO concentration of 2.0, 1.5, 1.0, 0.75 mg/L, respectively. At DO concentration of 0.75 mg/L with addition of alum, TN removal efficiency decreased to 54%. TP removal efficiency increased from 29% to 95% by adding alum to anaerobic reactor. The period of chemical backwashing of the membrane module increased from 15~20 days to 40~50 days after addition of alum.