Nitrogen and Phosphorus Removal in Membrane Bio-Reactor (MBR) Using Simultaneous Nitrification and Denitrification (SND)

동시 질산화-탈질(SND) 반응을 적용한 MBR 반응조에서 질소 및 인 제거 특성

  • Tian, Dong-Jie (Department of Environmental Engineering, Chungbuk Natianal University) ;
  • Lim, Hyun-Suk (Department of Environmental Engineering, Chungbuk Natianal University) ;
  • An, Chan-Hyun (Department of Environmental Engineering, Chungbuk Natianal University) ;
  • Lee, Bong-Gyu (Institute of Health and Environment) ;
  • Jun, Hang-Bae (Department of Environmental Engineering, Chungbuk Natianal University) ;
  • Park, Chan-Il (Department of Environmental Engineering, Chungbuk Natianal University)
  • Received : 2013.09.13
  • Accepted : 2013.10.14
  • Published : 2013.10.30

Abstract

Simultaneous nitrification and denitrification (SND) occurs concurrently in the same reactor under micro dissolved oxygen (DO) conditions. Anaerobic zone was applied for phosphorus release prior to an aerated membrane bio-reactor (MBR), and anoxic zone was installed by placing a baffle in the MBR for enhancing denitrification even in high DO concentration in the MBR. Phosphorus removal was tested by alum coagulation in the anaerobic reactor preceding to MBR. DO concentration were 2.0, 1.5, 1.0, 0.75 mg/L in the MBR at different operating stages for finding optimum DO concentration in MBR for nitrogen removal by SND. pH was maintained at 7.0~8.0 without addition of alkaline solution even with alum addition due to high alkalinity in the raw sewage. Both TCODcr and $NH_4^+$-N removal efficiency were over 90% at all DO concentration. TN removal efficiencies were 50, 51, 54, 66% at DO concentration of 2.0, 1.5, 1.0, 0.75 mg/L, respectively. At DO concentration of 0.75 mg/L with addition of alum, TN removal efficiency decreased to 54%. TP removal efficiency increased from 29% to 95% by adding alum to anaerobic reactor. The period of chemical backwashing of the membrane module increased from 15~20 days to 40~50 days after addition of alum.

동시 질산화 탈질은 미세 용존 산소하에 한 반응조내에서 일어난다. 따라서, 본 연구에서는 인 방출을 위해 공기가 공급되는 MBR 전단에 혐기성 존을 만들어주었으며, 높은 DO 농도에서 탈질효율을 향상시켜 주기 위해서는 MBR 내에 배플을 설치하여 무산소 존이 이루어지게 하였다. 그리고 인 제거를 위한 테스트는 MBR 전단의 혐기성 반응조에 알럼 응집제를 투입하여 수행하였다. 질소 제거를 위한 SND의 최적 DO 농도 도출은 MBR 내 DO 농도를 2.0, 1.5, 1.0, 0.75 mg/L의 다양한 조건에서의 운전을 통해 수행하였다. 심지어 높은 알칼리성 하수라 알럼 응집제를 투입하였을 때 알칼리 용액 첨가 없이도 pH는 7.0~8.0로 유지되었다. TCODcr와 $NH_4^+$-N의 제거 효율은 모든 DO 농도에서 90% 이상이었다. DO 농도 2.0, 1.5, 1.0, 0.75 mg/L에서의 TN 제거효율은 각각 50, 51, 54, 66%이었다. DO 농도 0.75 mg/L 조건에서 알럼을 첨가한 결과 TN 제거효율은 54%로 감소하였다. 혐기성 반응조에 알럼을 투입한 결과 TP 제거효율은 29%에서 95%로 향상되었다. 그리고 알럼 투입 후 분리막 모듈의 화학적 세정 주기는 15~20일부터 40~50일으로 늘어났다.

Keywords

References

  1. Park J. I. and Lee, T. J., "A study of the simultaneous nitrification and de nitrification in a single bioreactor," J. Kor. Soc. Environ. Eng., 29(2), 220-228(2007).
  2. Lee, S. H., Park, N. B., Park, S. M. and Jun, H. B., "Effect on nitrogen removal in the intermittent aeration system with the anaerobic archaea added," J. Kor. Soc. Environ. Eng., 27 (1), 1186-1192(2005).
  3. Metcalf, Eddy, "Wastewater engineering: treatment and reuse," McFrow-Hill, New York(2004).
  4. Munch, E.V. and Lant, J. Keller, "Simultaneous nitrification and denitrification in bench scale sequencing batch reactors," Water Res., 30(2), 277-285(1996). https://doi.org/10.1016/0043-1354(95)00174-3
  5. Pochana, K. and Keller, J., "Study of factors affecting simultaneous nitrification and denitrification (SND)," Water Sci. Technol., 39(6), 61-68(1999).
  6. Jeff, A. R., Paul, M. S. and Prakash, N. M., "Application of the membrane biological reactor system for combined sanitary and industrial wastewater treatment," Inter Biode. Biodegr, 46, 37-42(2000). https://doi.org/10.1016/S0964-8305(00)00058-5
  7. Choi, W. Y., "Nitrogen removal using simultaneous nitrification and denitrification in a membrane bio-reactor," Department of environmental and urban engineering graduate school, Chungbuk National University, Master's thesis(2010).
  8. Cheong, J. H., Heo, Y. R., Im, J. D., Lee, E. S. and Park, M. G., "Nitrogen and phosphorus removal in long term pilot plant operation using submerged hollow fiber membrane and ferric chloride," Kor. Soc. Environ. Eng., 27(11), 1168-1173 (2005).
  9. Lee, S. M., Jeong, J. H., Kim, D. Y., Yu, J. E., Ha, S. A., Jeong, I. C. and Kim, J. H. "Reuse of treated wastewater for coagulation-membrane separation process and put conditions on the impact of the type of coagulant," Proc. Kor. Environ. Sci. Soc. Conference, 18(1), 391-394(2009).
  10. Kim, G. Y., Kim, G. H., Kim, Y. H. and Kim, H. S., "Effect of coagulant in coagulant added MBR system," Proc. Membr. Soc. Kor. Conference, pp. 193-195(2006).
  11. Park, N. B., Choi, W. Y., Yoon, A. H. and Jun, H. B., "Effects of DO concentration on simultaneous nitrification and denitrification (SND) in a membrane bioreactor (MBR)," Kor. J.. Environ. Agric., 28(4), 371-377(2009). https://doi.org/10.5338/KJEA.2009.28.4.371
  12. Qingjuan, M., Fenglin, Y., Lifen, L. and Fangang, M., "Effect of COD/N ratio and DO concentration on simultaneous nitrification and denitrification in an airlift circulation membrane bioreactor," J. Environ. Sci., 20, 933-939(2008). https://doi.org/10.1016/S1001-0742(08)62189-0
  13. Eo, S. U., "Aeration activated sludge nitrification by injection directly into the impact of coagulant," Korea institute for industrial economics & Trade, pp. 275-294(1999).
  14. Park, J. R., Lim, H. M. and Kim, E. H., "Nitrogen and phosphorus removal characteristics from domestic sewage using two stage membrane bioreactor," J. Kor. Soc. Water Environ., 18(2), 131-140(2002).

Cited by

  1. Nitrogen removal characteristics of pigment wastewater using PAC-A/O process vol.32, pp.1, 2018, https://doi.org/10.11001/jksww.2018.32.1.019