• 제목/요약/키워드: 부분 선조립 공법

검색결과 3건 처리시간 0.017초

벽체철근 일반조립과 부분 선조립 공법의 작업시간 비교에 관한 연구 (The Comparison of Work Time between Field Fabrication Method and Partial Prefabrication Method of Rebar work)

  • 김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.12-13
    • /
    • 2018
  • Reinforced concrete works account for 40 to 50 percent of the total construction work. However, the shortage of construction workers is a problem in the delay of the construction period of reinforced concrete. The partial rebar prefabrication is one of the ways to shorten construction period. Thus, this study compared the partial rebar prefabrication and field fabrication method through work sampling. As a result, the partial rebar prefabrication showed a significant decrease in time compared to field fabrication method. As a result of this study, it is expected to be used as a reference for the efficient selection of reinforced concrete methods.

  • PDF

보 철근공사 조립공법별 작업시간분석 (Work Time Analysis of Rebar Fabrication Method in Beam Construction.)

  • 김주용;김민규;김영길;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF

Up-Set Coupler 이음철근의 인장특성에 대한 실험적 연구 (An Experimental Study of Tension Properties on New Developed Up-Set Coupler)

  • 심종성;박철우;강태성;김태수
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제12권5호
    • /
    • pp.109-115
    • /
    • 2008
  • 구조물이 초고층화, 대형화 되어감에 따라 철근의 이음방법에 대한 필요성이 증대되고 있다. 현재 일반적으로 건설현장에서는 겹이음을 많이 사용하고 있으나 굵은 직경을 사용한 구조부재의 경우 겹이음 사용 시 피복두께 확보의 어려움으로 부착파괴 및 접합부의 복잡한 배근으로 인한 콘크리트 타설의 시공성 저하 등이 문제가 되고 있다. 또한 압접이음은 철근의 단부를 국부적으로 가열하여 접합하는 방식으로 압접 후 철근의 취약부분이 발생할 수 있으므로 시공현장에서의 철저한 품질관리가 요구되는 단점이 있다. 이러한 단점을 해결하고자 새로운 개념의 Up-set Coupler를 적용하였다. 본 연구에서는 기계적 이음방법 중 철근 선조립공법이나 고강도, 대직경의 철근을 사용하는 PSC구조물의 접합부에서 주로 사용되는 대표적인 이음방법인 Screw Coupler와 Up-set Coupler, 그리고 이음이 없는 철근을 사용하여 각각의 인장특성과 사용성을 실험적으로 연구하고자 한다.