• Title/Summary/Keyword: 부동산종합공부시스템

Search Result 6, Processing Time 0.02 seconds

A Reference Model for Korea Real Estate Administration Intelligence System Using Block Chain (블록체인을 이용한 부동산종합공부시스템 참조모델)

  • Sun, Jong-Cheol;Kim, Jin Wook
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.7 no.11
    • /
    • pp.281-288
    • /
    • 2018
  • The block chain, which is characterized by a distributed ledger that stores the same data in several places, has various technical features including security and stability. Due to these characteristics, various researches are being conducted on the application of the block chain. In this paper, we consider the issues to be considered for applying the block chain to the Korea Real Estate Administration Intelligence System (KRAS). Based on this, we propose a block chain reference model for KRAS including a system configuration method and a consensus algorithm.

A Study on Linkage of Block Chain in Korea Real Estate Administration Intelligence System (부동산종합공부시스템에서의 블록체인 연계방안 연구)

  • Sun, Jong Cheol;Kim, Jin Wook
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2018.05a
    • /
    • pp.113-116
    • /
    • 2018
  • 동일한 데이터를 여러 곳에 보관하는 분산원장을 특징으로 갖는 블록체인은 보안성과 안정성을 비롯한 여러 가지 기술적 특징을 가지며, 이로 인해 블록체인의 활용처에 대한 연구가 다양하게 이루어지고 있다. 본 논문에서는 공적장부의 하나인 부동산종합공부시스템에 블록체인을 적용하기 위해 고려할 사항들을 도출하고, 이를 바탕으로 블록체인 시스템 구성 방안과 합의 알고리즘 참조모형을 제시한다.

The Improvement of Real-time Updating Methods of the National Base Map Using Building Layout Drawing (건물배치도를 이용한 국가기본도 수시수정 방법 개선)

  • Shin, Chang Soo;Park, Moon Jae;Choi, Yun Soo;Baek, kyu Yeong;Kim, Jaemyeong
    • Journal of Cadastre & Land InformatiX
    • /
    • v.48 no.1
    • /
    • pp.139-151
    • /
    • 2018
  • The National Base Map construction consists of the regular correction work of dividing the whole country into two regions and carrying out the modification Plotting by aerial photographs every two years as well as the real time updating work of correcting the major change feature within two weeks by the field survey and the As-Built Drawing. In the case of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) used for real time updating work of the National base map, the coordinate transformation error is included in the positional error when applied to the National Base Map based on the World Geodetic Reference System as the coordinate system based on the Regional Geodetic Reference System. In addition, National Base Map is registered based on the outline(eaves line) of the building in the Digital Topographic Map, and the Cadastral and Architecture are registered based on the building center line. Therefore, the Building Object management standard is inconsistent. In order to investigate the improvement method, the network RTK survey was conducted directly on a location of the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS) and the problems were analyzed by comparing with the plane plotting position reference in National Base Map. In the case of the general structure with the difference on the Building center line and the eaves line, beside the location information was different also the difference in the ratio of the building object was different between Building center line and the eave. In conclusion, it is necessary to provide the Base data of the double layer of the Building center line and the outline of the building(eaves line) in order to utilize the Building Layout Drawing of Korea Real estate Administration intelligence System(KRAS). In addition, it is necessary to study an organic map update process that can acquire the up-to-dateness and the accuracy at the same time.

A Study on Determinants of Realization Rate of Publicly Notified Individual Land Price Using One-Way ANOVA - focused on case of Wansan-gu, Jeonju-si - (일원변량분석을 이용한 개별공시지가 현실화율 결정요인에 관한 연구 - 전주시 완산구 사례를 중심으로 -)

  • Min, Woong-Kie
    • Journal of Cadastre & Land InformatiX
    • /
    • v.50 no.1
    • /
    • pp.87-105
    • /
    • 2020
  • The government is trying to secure reliability by raising the accuracy, objectivity, and transparency of the official price by promoting the reliability improvement plan of the official price and increasing the realization rate, but the Realization rate of Publicly Notified Individual Land Price is showing a big difference because the current market price is not fully reflected in the official price. Therefore, this study collected the actual transaction price reported to the RTMS in Wansan-gu, Jeonju, Jeollabuk-do and the individual official price of the KRAS and calculated the realization rate of publicly notified individual Land Price. SPSS 25.0 program was used for the empirical analysis of this study. The Dependent Variable was the realization rate of publicly notified individual Land Price, and Independent Variables, was six land characteristics items were selected, one-way ANOVA was conducted and post-test was conducted by Scheffe method. As a result of the analysis, average difference in realization rate of publicly notified individual Land Price was found in Residential areas, Commercial areas, and Farmland, Public land and Residential and commercia, Residential and Forest. Especially, it was found that the price of commercial area is higher than that of residential area and green area, and the price is less reflected in individual official land price.

Study on Establishment of Cadastral Surveying Fee System Suitable for Digital Cadastral Management Environment (디지털 지적관리 환경에 적합한 지적측량수수료 체계 확립 연구)

  • Hong, Sung-Eon
    • Journal of Digital Convergence
    • /
    • v.13 no.12
    • /
    • pp.23-30
    • /
    • 2015
  • The current cadastral business is being operated by conversion to a digital cadastral management system through computerized registers (land register and forest land register) and maps (cadastral map and forest cadastral map). Digital surveying methods, such as GPS surveying and electronic plane table surveying, are also used for cadastral surveying. At present, fees for cadastral surveying are calculated based on a standard pursuant to the Construction Standard Production Unit System and an announcement by the Ministry of Land, Infrastructure, and Transportation. In many cases, however, the cadastral surveying fee system announced at present fail to apply the digitalized environment depending on the item. This study sought to analyze the cadastral surveying fee system that requires improvement in the rapidly changing digital cadastral management environment, and to prepare a basis to establish a cadastral surveying fee system suitable to the digital environment by suggesting an improvement method for such system. As a result of the study, the following suggestions were made: a method of changing to terms suitable to the digital environment based on the current status analysis; preparation of a new estimation system regarding new estimation items; and re-survey of an estimation system of cadastral confirmation survey and preparation of an estimation system.

Evaluation on Park Planning of Provincial Parks among Korea Natural Parks (자연공원 유형중 도립공원 계획의 평가)

  • Cho, Woo
    • Korean Journal of Environment and Ecology
    • /
    • v.33 no.3
    • /
    • pp.321-332
    • /
    • 2019
  • The purpose of this study is to identify the problems and present the improvement measures by assessing the suitability of planning of provincial natural parks on a legal basis. We assessed the suitability of 29 provincial parks to examine the suitability of park planning (special-purpose district planning and facilities planning) according to the Natural Park Act, implementation of the park projects, and registration of Korea Real estate Administration intelligence System (KRAS) for park management and obtained the following results. In the case of the park nature conservation districts among the special-purpose districts, 24.1 % (7 parks) were not feasible or decided the park facility that was larger than the planned area. The amended law requires the park cultural heritage district as a new special-purpose district, but 41.2% did not designate the district or failed to comply with the standard. Moreover, there was a problem of establishing or announcing the plan that was unsuitable for the management of park village district (former collective facilities district). Although provincial parks are categorized as the restricted area, the park facility plans still focus on regional development and tourism development, and the titles (names) of the park facilities are wrong. The law requires digitalization and disclosure of park plans, but many parks fail to abide by the law. We judge that it is necessary to develop effective provincial park planning and establish the measures to protect and manage the provincial parks.