• Title/Summary/Keyword: 복선철도

Search Result 44, Processing Time 0.029 seconds

3D Terrain Analysis and Modeling for Double-Tract Railway Route Selection Using Geo-Spatial Information (공간정보를 이용한 복선 철도노선 선정에서의 3차원 지형분석 및 모델링)

  • Lee Young-Wook;Yeon Sang-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.5 no.6
    • /
    • pp.248-254
    • /
    • 2005
  • Recently remote sensing technology is applied for construction planning and design areas by use of remote sensed satellite images according to engineering application technology in the various experimental tasks. In this study, it was applied for 3 dimensional terrain analysis and basic design by comparing with present railway and newly expanded double-tract railway route of forest sites on the new construction site of 15km at national railway lines, and then showed 3-D perspective images and fly simulation images to examine possibility of various application as terrain analysis modeling and running simulation at the corresponding course. As a result of its application, it gained the results not only improvement of present methods but also real various application possibilities.

  • PDF

3D Terrain Analysis and Modeling for Double-Tract Railway Route of Forest Sites (산악지 복선 철도노선에서의 3차원지형분석 및 모델링)

  • Yeon, Sang-Ho
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.892-899
    • /
    • 2004
  • Recently remote sensing technology is applied for construction projects planning and design areas by use of remote sensed satellite images according to engineering application technology in the various experimental tasks. In this study, It was applied for 3 dimensional terrain analysis and basic design by comparing to present railway and new expand doble-tract railway route of forest sites on the new construction site of 15km at national railway lines,. and then showed 3-D perspective images and fly simulation images to possibility for various application as terrain analysis modeling and running simulation at the course. As a results of its applied, It gained the results not only improvement of present methods but also real various application possibilities.

  • PDF

3D Terrain Analysis and Modeling for Double-Tract Railway Route (복선 철도노선에서의 3차원지형분석 및 모델링)

  • Yeon Sang-Ho;Lee Young-Wook
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2005.05a
    • /
    • pp.131-137
    • /
    • 2005
  • Recently remote sensing technology is applied for construction projects planning and design areas by use of remote sensed satellite images according to engineering application technology in the various experimental tasks. In this study, It was applied for 3 dimensional terrain analysis and basic design by comparing to present railway and new expand doble-tract railway route of forest sites on the new construction site of 15km at national railway lines, and then showed 3-D perspective images and fly simulation images to possibility for various application as terrain analysis modeling and running simulation at the course. As a results of its applied, It gained the results not only improvement of present methods but also real various application possibilities.

  • PDF

Prospect for the metropolitan area railway service in Reparation for the railway connection between the South and the North (남북철도연결을 대비한 수도권 철도망 정비방향)

  • 신종서
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.52-57
    • /
    • 2001
  • ㆍ수도권 철도는 우리나라의 경제성장과 함께 증가하는 교통처리 대책으로 1974년 8월 15일 서울지하철 1호선과 함께 경인선 서울∼인천간, 경부선 서울∼수원간, 경원선 용산∼청량리∼성북간을 복선 전철화 하여 도시철도로 전환, 이에 따라 수도권 위성도시의 발전과 인구 폭증으로 안산, 산본, 평촌, 분당, 일산 등 신도시를 개발하고 교통난 해소를 위해 서울지하철은 1호선에서 9호선가지 건설중이며, 수도권 철도는 경부선 영등포∼천안간 2복선전철과 안산선, 분당선, 일산선, 경의선, 경원선, 중앙선, 경춘선, 용산선, 신공항선 등 복선전철화와 경부고속철도 등 수송능력 증강을 위해 건설하고 있다. (중략)

  • PDF

Application of Geospatial Information for Route Selection of New Double Track Railway (신규 복선철도 노선선정을 위한 지형공간정보의 적용)

  • Yeon Sang-Ho;Lee Jin-Duck
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.475-481
    • /
    • 2005
  • Recently remote sensing technology is applied for construction projects planning and design areas by use of remote sensed satellite images according to engineering application technology in the various experimental tasks. In this study, It was applied for 3 dimensional terrain analysis and basic design by comparing to present railway and new expand doble-tract railway route of forest sites on the new construction site of 15km at national railway lines, and then showed 3-D perspective images and fly simulation images to possibility for various application as terrain analysis modeling and running simulation at the course. As a results of its applied, It gained the results not only improvement of present methods but also real various application possibilities.

  • PDF

Screening Effects of Double-track Electric Railway and Shielded Cables on Communication-Line Inductive Interference (전기철도 복선화 및 차폐 케이블 적용에 따른 통신선 유도장해 차폐 효과)

  • Seol, Il-Hwan;Choi, Kyu-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5148-5155
    • /
    • 2013
  • The induced voltage on the telecommunication cable generated by nearby electric railway system may bring about telecommunication errors and safety accidents. In order to reduce the induced voltage and to achieve communication reliability, the effect of the shield cables and the recent double-track railway systems on the inductive interference should be investigated. This paper analyzes the parameters which seriously influence the induced voltage on the telecommunication cables which run parallel with a AT-fed electric railway line, and provides a simulation-based approach to estimate the amount of the induced voltage. Simulation results indicate that the induced noise voltage generated by a double-track railway decreases by 18 % compared to that generated by a single-track railway, showing the screening effect by nearby track. The induced noise voltages on the 50%-shielded cable and 15%-shielded cable decrease to 1/8 and 1/15 of the induced voltage on the non-shielded cable, respectively. A meaningful shield effect is achieved and the induced voltage is minimized by the double-track railway and the shielded cable.

The study about applying concentric circle to curved line in railroad (복선철도에서 구축과 내$\cdot$외측 궤도의 동심원 선형구성의 필요성 연구)

  • Shin, Tae-Gyun;Chung, Chan-Mun;Kim, Seoung-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.157-162
    • /
    • 2003
  • The curved line in construction of railroad is inevitable. Also it needs a transition curve when the straight line connects to curved line. In this research, by establishing the reciprocal relations of inner, center and outer track, we will present the calculation method of construction-center line in normal double-track railroad which uses cubic parabolic type as a transition curve.

  • PDF