• Title/Summary/Keyword: 보강 간격

Search Result 277, Processing Time 0.036 seconds

The Optimum Specification of Pipes in Rain-Sheltering Greenhouse with Roof Vents for Large-Grain Grapevine Cultivation (대립계 포도 천창개폐형 비가림하우스의 최적 파이프 규격)

  • Yum, Sung-Hyun;Yun, Nam-Gyu;Kim, Gyeong-Won;Lee, Sung-Hyoun;Cho, Yong-Ho;Park, Seo-Jun;Park, Mun-Kyun
    • Journal of Bio-Environment Control
    • /
    • v.16 no.4
    • /
    • pp.275-283
    • /
    • 2007
  • This study was carried out to: (1) analyze structural stability of representative rain-sheltering greenhouses for large-grain grapevine cultivation with widths of 3.6 m and 5 m in case of using the existing pipe for agriculture; (2) present the optimum specification of pipes in the greenhouse with a width of 5 m under the condition of using the pipe of which ultimate strength has been above $400N{\cdot}mm^{-2}$; (3) evaluate stability and also present the optimum specification of pipes as eaves height was augmented. The above analyses were done for greenhouses with roof vents and also with a main-column interval of 3 m and a rafter interval of 60 cm. First, the existing 3.6 m greenhouse with a rafter of ${\Phi}25.4{\times}1.5t@600$ was stable far a snow-depth of 35 cm but unstable for a wind velocity of $35m{\cdot}s^{-1}$. Meanwhile the existing 5 m greenhouse with the same rafter was not stable for a wind velocity of $335m{\cdot}s^{-1}$ as well as a snow-depth of 35 cm. This meant that existing greenhouses had to be reinforced to secure stability. Second, the specification of pipes, especially rafter, could be classified as two cases. One had a structural stability at a safe wind velocity of $35m{\cdot}s^{-1}$ and a safe snow-depth of 40 cm for which stability the rafter had to be ${\Phi}31.8{\times}1.5t@600$, and the other had a stability at $30m{\cdot}s^{-1}-35cm$ at the specification of rafter ${\Phi}25.4{\times}1.5t@600$. Finally, eaves height had a significant effect on safe wind velocity. But it had little influence on safe snow-depth. The results showed that the specification of side-wall pipes had to be reinforced for the safe side velocity accord-ing to the increment of eaves height and similarly the specification of fore-end post far the safe fore-end velocity.

Concurrent Chemoradiation with Weekly Paclitaxel in Locally Advanced Non-small Cell Lung Cancer (국소진행성 비소세포폐암에서 Paclitaxel 매주투여 및 방사선치료 동시요법)

  • Bae, Kang Woo;Song, Tak Ho;Yang, Joo Yeon;Kim, Yun Seup;Park, Jae Seok;Jee, Young Koo;Lee, Kye Young
    • Tuberculosis and Respiratory Diseases
    • /
    • v.57 no.4
    • /
    • pp.351-357
    • /
    • 2004
  • Background : Paclitaxel is highly beneficial anticancer drug for the treatment of non-small cell lung cancer and has shown remarkable radiosensitizing effect in vitro. We evaluated whether concurrent chemoradiation therapy with weekly paclitaxel (60 $mg/m^2$) could be tolerated and effective in the treatment of locally advanced non-small cell lung cancer (NSCLC). Methods : Twenty-two stage III (IIIA:6, IIIB:16) NSCLC patients were treated with weekly administration of paclitaxel (60 $mg/m^2$) on days 1, 8, 15, 22, 29, and 36 in addition to concurrent radiation therapy of 54 Gy. After the initial phase of concurrent chemoradiation, patients received additional two cycles of consolidation chemotherapy with paclitaxel (175 $mg/m^2$)/cisplatin (75 $mg/m^2$) or paclitaxel (175 $mg/m^2$)/carboplatin (6AUC) every 3 weeks. Results : Overall response rate was 81.8% (18/22) with 9.1% (2/22) of complete response and 72.7% (16/22) of partial response rate. Two patients (9.1%) died of chemoradiation-induced pneumonitis after completion of therapy. In total, grade 3 toxicities included pneumonitis (22.7%), esophagitis (22.7%), neuropathy (13.6%), and neutropenia (13.6%). The median survival time was 15 months and 2-year overall survival were 31.8%. Conclusion : Concurrent chemoradiation therapy with weekly paclitaxel in locally advanced NSCLC showed good local response, but survival rate was not completely satisfactory due to potentially fatal chemoradiation-induced pneumonitis.

A study on the comparison by the methods of estimating the relaxation load of SEM-pile (SEM파일의 이완하중 산정방법별 이완하중량 비교 연구)

  • Kim, Hyeong-Gyu;Park, Eun-Hyung;Cho, Kook-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.3
    • /
    • pp.543-560
    • /
    • 2018
  • With the increased development in downtown underground space facilities that vertically cross under a railway at a shallow depth, the demand for non-open cut method is increasing. However, most construction sites still adopt the pipe roof method, where medium and large diameter steel pipes are pressed in to form a roof, enabling excavation of the inside space. Among the many factors that influence the loosening region and loads that occur while pressing in steel pipes, the size of the pipe has the largest impact, and this factor may correspond to the magnitude of load applied to the underground structure inside the steel pipe roof. The super equilibrium method (SEM) has been developed to minimize ground disturbance and loosening load, and uses small diameter pipes of approximately 114 mm instead of conventional medium and large diameter pipes. This small diameter steel pipe is called an SEM pile. After SEM piles are pressed in and the grouting reinforcement is constructed, a crossing structure is pressed in by using a hydraulic jack without ground subsidence or heaving. The SEM pile, which plays the role of timbering, is a fore-poling pile of approximately 5 m length that prevents ground collapse and supports surface load during excavation of toe part. The loosening region should be adequately calculated to estimate the spacing and construction length of the piles and stiffness of members. In this paper, we conducted a comparative analysis of calculations of loosening load that occurs during the press-in of SEM pile to obtain an optimal design of SEM. We analyzed the influence of factors in main theoretical and empirical formulas applied for calculating loosening regions, and carried out FEM analysis to see an appropriate loosening load to the SEM pile. In order to estimate the soil loosening caused by actual SEM-pile indentation and excavation, a steel pipe indentation reduction model test was conducted. Soil subsidence and soil loosening were investigated quantitatively according to soil/steel pipe (H/D).

MDM2, p53 and pRb Expression Prior to Definitive Chemoradiotherapy in Esophageal Carcinoma (식도암에서 MDM2, p53, pRb 발현과 동시적 항암화학방사선요법의 결과)

  • Yoon, Mee-Sun;Lee, Jae-Hyuk;Cho, Sang-Hee;Song, Ju-Young;Ahn, Sung-Ja;Chung, Ik-Joo;Chung, Woong-Ki;Nah, Byung-Sik;Nam, Taek-Keun
    • Radiation Oncology Journal
    • /
    • v.25 no.4
    • /
    • pp.193-200
    • /
    • 2007
  • Purpose: This study evaluated the pretreatment expression patterns of MDM2, p53, and pRb proteins to determine if the expression patterns could predict the outcome of concurrent chemoradiotherapy (CCRT) for esophageal squamous cell carcinoma and aid in the decisions for the selection of treatment modalities. Materials and Methods: Fifty-one patients that were treated with definitive chemoradiotherapy for stage $I{\sim}IVa$ esophageal squamous cell carcinoma were selected for this study. Radiotherapy was administered with daily $1.8{\sim}2\;Gy$ fractions up to a median dose of 54 Gy for primary tumors, and with four cycles of cisplatin/5-fluorouracil chemotherapy that was administered every 4 weeks, the first two cycles of which were administered concurrently with radiotherapy. Expression of MDM2, p53, and pRb was investigated by immunohistochemical analysis using pretreatment biopsy specimens. Results: MDM2, p53, and pRb were detected with high immunoreactivity in 19.6%, 27.5%, and 66.7% of the patients, respectively. However, there was no significant correlation between expression of these factors and clinical outcome. By the use of multivariate analysis with nine covariates-age, tumor location, tumor length, stage, pathological response, clinical response, MDM2 expression, p53 expression, and pRb expression, only pathological response and stage were significant factors for cause-specific survival. Conclusion: Expression of MDM2, p53, and pRb was not found to be clinically significant for predicting outcomes after CCRT in this study. Further studies with a larger patient population and longer follow-up periods are needed to re-evaluate the expression pattern and to identify new predictors for CCRT response.

Estimation of Allowable Bearing Capacity and Settlement of Deep Cement Mixing Method for Reinforcing the Greenhouse Foundation on Reclaimed Land (간척지 온실기초 보강을 위한 심층혼합처리공법의 허용지내력 및 침하량 산정)

  • Lee, Haksung;Kang, Bang Hun;Lee, Kwang-seung;Lee, Su Hwan
    • Journal of Bio-Environment Control
    • /
    • v.30 no.4
    • /
    • pp.287-294
    • /
    • 2021
  • In order to expand facility agriculture and reduce greenhouse construction costs in reclaimed land, a greenhouse foundation method that satisfies economic feasibility and structural safety at the same time is required. As an alternative, the allowable bearing capacity and settlement were reviewed when the DCM(Deep cement mixing) method was applied among the soft ground reinforcement methods. To examine the applicability of the greenhouse foundation, the allowable bearing capacity and settlement were calculated by applying the theory of Terzaghi, Meyerhof, Hansen, and Schmertmann. In case of the diameter of 800mm and the width and length of the foundation of 4m, the allowable bearing capacity was 179kN/m2 and the settlement was 7.25mm, which satisfies the required bearing capacity and settlement standards. The calculation results were verified through FEM(Finite element method) analysis using the Mohr-Coulomb material model. The allowable bearing capacity was 169kN/m2 and the settlement was 2.52mm. The bearing capacity showed an error of 5.6% compared to calculated value, and the settlement showed and error of 65.4%. Through theoretical calculations and FEM analysis, it was confirmed that the allowable bearing capacity and settlement satisfies the design criteria as a greenhouse foundation when the width and length of the foundation were 4m. Based on the verified design values, it is expected to be able to present the foundation design criteria for greenhouses through empirical tests such as bearing capacity tests and long-term settlement monitoring.

Development and Experimental Performance Evaluation of Steel Composite Girder by Turn Over Process (단면회전방법을 적용한 강합성 소수주거더 개발 및 실험적 성능 평가)

  • Kim, Sung Jae;Yi, Na Hyun;Kim, Sung Bae;Kim, Jang-Ho Jay
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5A
    • /
    • pp.407-415
    • /
    • 2010
  • In Korea, more than 90% of the total number of steel bridges built for 40~70 m span length is a steel box-girder bridge type. A steel box-girder bridge is suitable for long span or curved bridges with outstanding flexural and torsional rigidity as well as good constructability and safety. However, a steel box-girder bridge is uneconomical, requiring many secondary members and workmanship such as stiffeners and ribs requiring welding attachments to flanges or webs. Therefore, in US and Japan, a plate girder bridge, which is relatively cheap and easy to construct is generally used. One type of the plate girder bridge is the two- or three-main girder plate bridge, which is a composite plate girder bridge that minimizes the number of required main girders by increasing the distance between the adjacent girders. Also, for the simplification of girder section, the stiffener which requires attachment to the web is not required. The two-main steel girder plate bridge is a representative type of plate girder bridges, which is suitable for bridges with 10 m effective width and has been developed in the early 1960s in France. To ensure greater safety of two- or three-main girder plate bridges, a larger steel section is used in the bridge domestically than in Europe or Japan. Also, the total number of two- or three-main girder plate bridge constructed in Korea is significantly less than the steel box girder bridge due to a lack of designers' familiarity with more complex design detailing of the bridge compare to that of a steel box girder bridge design. In this study, a new construction method called Turn Over method is proposed to minimize the steel section size used in a two- or three-main girder plate bridge by applying prestressing force to the member using confining concrete section's weight to reduce construction cost. Also, a full scale 20 m Turn Over girder specimen and a Turn Over girder bridge specimen were tested to evaluate constructability and structural safety of the members constructed using Turn Over process.

Combined Modality Therapy with Selective Bladder Preservation for Muscle Invading Bladder Cancer (침윤성 방광암 환자에서 방광 보존 치료)

  • Youn Seon Min;Yang Kwang Mo;Lee Hyung Sik;Hur Won Joo;Oh Sin Geun;Lee Jong Cheol;Yoon Jin Han;Kwon Heon Young;Jung Kyung Woo;Jung Se Il
    • Radiation Oncology Journal
    • /
    • v.19 no.3
    • /
    • pp.237-244
    • /
    • 2001
  • Purpose : To assess the tolerance, complete response rate, bladder preservation rate and survival rate in patients with muscle-invading bladder cancer treated with selective bladder preservation protocol. Method and Materials : From October 1990 to June 1998, twenty six patients with muscle-invading bladder cancer (clinical stage T2-4, N0-3, M0) were enrolled for the treatment protocol of bladder preservation. They were treated with maximal TURBT (transurethral resection of bladder tumor) and 2 cycles of MCV chemotherapy (methotrexate, crisplatin, and vinblastine) followed by $39.6\~45\;Gy$ pelvic irradiation with concomitant cisplatin. After complete urologic evaluation (biopsy or cytology), the patients who achieved complete response were planed for bladder preservation treatment and treated with consolidation cisplatin and radiotherapy (19.8 Gy). The patients who had incomplete response were planed to immediate radical cystectomy. If they refused radical cystectomy, they were treated either with TURBT followed by MCV or cisplatin chemotherapy and radiotherapy. The median follow-up duration is 49.5 months. Results : The Patients with stage T2-3a and T3b-4a underwent complete removal of tumor or gross tumor removal by TURBT, respectively. Twenty one out of 26 patients $(81\%)$ successfully completed the protocol of the planned chemo-radiotherapy. Seven patients had documented complete response. Six of them were treated with additional consolidation cisplatin and radiotherapy. One patient was treated with 2 cycles of MCV chemotherapy due to refusal of chemo-radiotherapy. Five of 7 complete responders had functioning tumor-free bladder. Fourteen patients of incomplete responders were further treated with one of the followings : radical cystectomy (1 patient), or TURBT and 2 cycles of MCV chemotherapy (3 patients), or cisplatin and radiotherapy (10 patients). Thirteen patients of them were not treated with planned radical cystectomy due to patients' refusal (9 patients) or underlying medical problems (4 patients). Among twenty one patients, 12 patients $(58\%)$ were alive with their preserved bladder, 8 patients died with the disease, 1 patient died of intercurrent disease. The 5 years actuarial survival rates according to CR and PR after MCV chemotherapy and cisplatin chemoradiotherapy were $80\%\;and\;14\%$, respectively (u=0.001). Conclusion : In selected patients with muscle-invading bladder cancer, the bladder preservation could be achieved by MCV chemotherapy and cisplatin chemo-radiotherapy. All patients tolerated well this bladder preservation protoco. The availability of complete TURBT and the responsibility of neoadjuvant chemotherapy and chemoradiotherapy were important predictors for bladder preservation and survival. The patients who had not achieved complete response after neoadjuvant chemotherapy and chemoradiotherapy should be immediate radical cystectomy. A randomized prospective trial might be essential to determine more accurate indications between cystectomy or bladder preservation.

  • PDF