This study was carried out to: (1) analyze structural stability of representative rain-sheltering greenhouses for large-grain grapevine cultivation with widths of 3.6 m and 5 m in case of using the existing pipe for agriculture; (2) present the optimum specification of pipes in the greenhouse with a width of 5 m under the condition of using the pipe of which ultimate strength has been above $400N{\cdot}mm^{-2}$; (3) evaluate stability and also present the optimum specification of pipes as eaves height was augmented. The above analyses were done for greenhouses with roof vents and also with a main-column interval of 3 m and a rafter interval of 60 cm. First, the existing 3.6 m greenhouse with a rafter of ${\Phi}25.4{\times}1.5t@600$ was stable far a snow-depth of 35 cm but unstable for a wind velocity of $35m{\cdot}s^{-1}$. Meanwhile the existing 5 m greenhouse with the same rafter was not stable for a wind velocity of $335m{\cdot}s^{-1}$ as well as a snow-depth of 35 cm. This meant that existing greenhouses had to be reinforced to secure stability. Second, the specification of pipes, especially rafter, could be classified as two cases. One had a structural stability at a safe wind velocity of $35m{\cdot}s^{-1}$ and a safe snow-depth of 40 cm for which stability the rafter had to be ${\Phi}31.8{\times}1.5t@600$, and the other had a stability at $30m{\cdot}s^{-1}-35cm$ at the specification of rafter ${\Phi}25.4{\times}1.5t@600$. Finally, eaves height had a significant effect on safe wind velocity. But it had little influence on safe snow-depth. The results showed that the specification of side-wall pipes had to be reinforced for the safe side velocity accord-ing to the increment of eaves height and similarly the specification of fore-end post far the safe fore-end velocity.
Bae, Kang Woo;Song, Tak Ho;Yang, Joo Yeon;Kim, Yun Seup;Park, Jae Seok;Jee, Young Koo;Lee, Kye Young
Tuberculosis and Respiratory Diseases
/
v.57
no.4
/
pp.351-357
/
2004
Background : Paclitaxel is highly beneficial anticancer drug for the treatment of non-small cell lung cancer and has shown remarkable radiosensitizing effect in vitro. We evaluated whether concurrent chemoradiation therapy with weekly paclitaxel (60 $mg/m^2$) could be tolerated and effective in the treatment of locally advanced non-small cell lung cancer (NSCLC). Methods : Twenty-two stage III (IIIA:6, IIIB:16) NSCLC patients were treated with weekly administration of paclitaxel (60 $mg/m^2$) on days 1, 8, 15, 22, 29, and 36 in addition to concurrent radiation therapy of 54 Gy. After the initial phase of concurrent chemoradiation, patients received additional two cycles of consolidation chemotherapy with paclitaxel (175 $mg/m^2$)/cisplatin (75 $mg/m^2$) or paclitaxel (175 $mg/m^2$)/carboplatin (6AUC) every 3 weeks. Results : Overall response rate was 81.8% (18/22) with 9.1% (2/22) of complete response and 72.7% (16/22) of partial response rate. Two patients (9.1%) died of chemoradiation-induced pneumonitis after completion of therapy. In total, grade 3 toxicities included pneumonitis (22.7%), esophagitis (22.7%), neuropathy (13.6%), and neutropenia (13.6%). The median survival time was 15 months and 2-year overall survival were 31.8%. Conclusion : Concurrent chemoradiation therapy with weekly paclitaxel in locally advanced NSCLC showed good local response, but survival rate was not completely satisfactory due to potentially fatal chemoradiation-induced pneumonitis.
Journal of Korean Tunnelling and Underground Space Association
/
v.20
no.3
/
pp.543-560
/
2018
With the increased development in downtown underground space facilities that vertically cross under a railway at a shallow depth, the demand for non-open cut method is increasing. However, most construction sites still adopt the pipe roof method, where medium and large diameter steel pipes are pressed in to form a roof, enabling excavation of the inside space. Among the many factors that influence the loosening region and loads that occur while pressing in steel pipes, the size of the pipe has the largest impact, and this factor may correspond to the magnitude of load applied to the underground structure inside the steel pipe roof. The super equilibrium method (SEM) has been developed to minimize ground disturbance and loosening load, and uses small diameter pipes of approximately 114 mm instead of conventional medium and large diameter pipes. This small diameter steel pipe is called an SEM pile. After SEM piles are pressed in and the grouting reinforcement is constructed, a crossing structure is pressed in by using a hydraulic jack without ground subsidence or heaving. The SEM pile, which plays the role of timbering, is a fore-poling pile of approximately 5 m length that prevents ground collapse and supports surface load during excavation of toe part. The loosening region should be adequately calculated to estimate the spacing and construction length of the piles and stiffness of members. In this paper, we conducted a comparative analysis of calculations of loosening load that occurs during the press-in of SEM pile to obtain an optimal design of SEM. We analyzed the influence of factors in main theoretical and empirical formulas applied for calculating loosening regions, and carried out FEM analysis to see an appropriate loosening load to the SEM pile. In order to estimate the soil loosening caused by actual SEM-pile indentation and excavation, a steel pipe indentation reduction model test was conducted. Soil subsidence and soil loosening were investigated quantitatively according to soil/steel pipe (H/D).
Purpose: This study evaluated the pretreatment expression patterns of MDM2, p53, and pRb proteins to determine if the expression patterns could predict the outcome of concurrent chemoradiotherapy (CCRT) for esophageal squamous cell carcinoma and aid in the decisions for the selection of treatment modalities. Materials and Methods: Fifty-one patients that were treated with definitive chemoradiotherapy for stage $I{\sim}IVa$ esophageal squamous cell carcinoma were selected for this study. Radiotherapy was administered with daily $1.8{\sim}2\;Gy$ fractions up to a median dose of 54 Gy for primary tumors, and with four cycles of cisplatin/5-fluorouracil chemotherapy that was administered every 4 weeks, the first two cycles of which were administered concurrently with radiotherapy. Expression of MDM2, p53, and pRb was investigated by immunohistochemical analysis using pretreatment biopsy specimens. Results: MDM2, p53, and pRb were detected with high immunoreactivity in 19.6%, 27.5%, and 66.7% of the patients, respectively. However, there was no significant correlation between expression of these factors and clinical outcome. By the use of multivariate analysis with nine covariates-age, tumor location, tumor length, stage, pathological response, clinical response, MDM2 expression, p53 expression, and pRb expression, only pathological response and stage were significant factors for cause-specific survival. Conclusion: Expression of MDM2, p53, and pRb was not found to be clinically significant for predicting outcomes after CCRT in this study. Further studies with a larger patient population and longer follow-up periods are needed to re-evaluate the expression pattern and to identify new predictors for CCRT response.
Lee, Haksung;Kang, Bang Hun;Lee, Kwang-seung;Lee, Su Hwan
Journal of Bio-Environment Control
/
v.30
no.4
/
pp.287-294
/
2021
In order to expand facility agriculture and reduce greenhouse construction costs in reclaimed land, a greenhouse foundation method that satisfies economic feasibility and structural safety at the same time is required. As an alternative, the allowable bearing capacity and settlement were reviewed when the DCM(Deep cement mixing) method was applied among the soft ground reinforcement methods. To examine the applicability of the greenhouse foundation, the allowable bearing capacity and settlement were calculated by applying the theory of Terzaghi, Meyerhof, Hansen, and Schmertmann. In case of the diameter of 800mm and the width and length of the foundation of 4m, the allowable bearing capacity was 179kN/m2 and the settlement was 7.25mm, which satisfies the required bearing capacity and settlement standards. The calculation results were verified through FEM(Finite element method) analysis using the Mohr-Coulomb material model. The allowable bearing capacity was 169kN/m2 and the settlement was 2.52mm. The bearing capacity showed an error of 5.6% compared to calculated value, and the settlement showed and error of 65.4%. Through theoretical calculations and FEM analysis, it was confirmed that the allowable bearing capacity and settlement satisfies the design criteria as a greenhouse foundation when the width and length of the foundation were 4m. Based on the verified design values, it is expected to be able to present the foundation design criteria for greenhouses through empirical tests such as bearing capacity tests and long-term settlement monitoring.
Kim, Sung Jae;Yi, Na Hyun;Kim, Sung Bae;Kim, Jang-Ho Jay
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.5A
/
pp.407-415
/
2010
In Korea, more than 90% of the total number of steel bridges built for 40~70 m span length is a steel box-girder bridge type. A steel box-girder bridge is suitable for long span or curved bridges with outstanding flexural and torsional rigidity as well as good constructability and safety. However, a steel box-girder bridge is uneconomical, requiring many secondary members and workmanship such as stiffeners and ribs requiring welding attachments to flanges or webs. Therefore, in US and Japan, a plate girder bridge, which is relatively cheap and easy to construct is generally used. One type of the plate girder bridge is the two- or three-main girder plate bridge, which is a composite plate girder bridge that minimizes the number of required main girders by increasing the distance between the adjacent girders. Also, for the simplification of girder section, the stiffener which requires attachment to the web is not required. The two-main steel girder plate bridge is a representative type of plate girder bridges, which is suitable for bridges with 10 m effective width and has been developed in the early 1960s in France. To ensure greater safety of two- or three-main girder plate bridges, a larger steel section is used in the bridge domestically than in Europe or Japan. Also, the total number of two- or three-main girder plate bridge constructed in Korea is significantly less than the steel box girder bridge due to a lack of designers' familiarity with more complex design detailing of the bridge compare to that of a steel box girder bridge design. In this study, a new construction method called Turn Over method is proposed to minimize the steel section size used in a two- or three-main girder plate bridge by applying prestressing force to the member using confining concrete section's weight to reduce construction cost. Also, a full scale 20 m Turn Over girder specimen and a Turn Over girder bridge specimen were tested to evaluate constructability and structural safety of the members constructed using Turn Over process.
Youn Seon Min;Yang Kwang Mo;Lee Hyung Sik;Hur Won Joo;Oh Sin Geun;Lee Jong Cheol;Yoon Jin Han;Kwon Heon Young;Jung Kyung Woo;Jung Se Il
Radiation Oncology Journal
/
v.19
no.3
/
pp.237-244
/
2001
Purpose : To assess the tolerance, complete response rate, bladder preservation rate and survival rate in patients with muscle-invading bladder cancer treated with selective bladder preservation protocol. Method and Materials : From October 1990 to June 1998, twenty six patients with muscle-invading bladder cancer (clinical stage T2-4, N0-3, M0) were enrolled for the treatment protocol of bladder preservation. They were treated with maximal TURBT (transurethral resection of bladder tumor) and 2 cycles of MCV chemotherapy (methotrexate, crisplatin, and vinblastine) followed by $39.6\~45\;Gy$ pelvic irradiation with concomitant cisplatin. After complete urologic evaluation (biopsy or cytology), the patients who achieved complete response were planed for bladder preservation treatment and treated with consolidation cisplatin and radiotherapy (19.8 Gy). The patients who had incomplete response were planed to immediate radical cystectomy. If they refused radical cystectomy, they were treated either with TURBT followed by MCV or cisplatin chemotherapy and radiotherapy. The median follow-up duration is 49.5 months. Results : The Patients with stage T2-3a and T3b-4a underwent complete removal of tumor or gross tumor removal by TURBT, respectively. Twenty one out of 26 patients $(81\%)$ successfully completed the protocol of the planned chemo-radiotherapy. Seven patients had documented complete response. Six of them were treated with additional consolidation cisplatin and radiotherapy. One patient was treated with 2 cycles of MCV chemotherapy due to refusal of chemo-radiotherapy. Five of 7 complete responders had functioning tumor-free bladder. Fourteen patients of incomplete responders were further treated with one of the followings : radical cystectomy (1 patient), or TURBT and 2 cycles of MCV chemotherapy (3 patients), or cisplatin and radiotherapy (10 patients). Thirteen patients of them were not treated with planned radical cystectomy due to patients' refusal (9 patients) or underlying medical problems (4 patients). Among twenty one patients, 12 patients $(58\%)$ were alive with their preserved bladder, 8 patients died with the disease, 1 patient died of intercurrent disease. The 5 years actuarial survival rates according to CR and PR after MCV chemotherapy and cisplatin chemoradiotherapy were $80\%\;and\;14\%$, respectively (u=0.001). Conclusion : In selected patients with muscle-invading bladder cancer, the bladder preservation could be achieved by MCV chemotherapy and cisplatin chemo-radiotherapy. All patients tolerated well this bladder preservation protoco. The availability of complete TURBT and the responsibility of neoadjuvant chemotherapy and chemoradiotherapy were important predictors for bladder preservation and survival. The patients who had not achieved complete response after neoadjuvant chemotherapy and chemoradiotherapy should be immediate radical cystectomy. A randomized prospective trial might be essential to determine more accurate indications between cystectomy or bladder preservation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.