• Title/Summary/Keyword: 벽식구조

Search Result 155, Processing Time 0.023 seconds

Flexible Unit Floor Plan of a Modular House Considering the Production System (생산 시스템을 고려한 모듈러주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun
    • Land and Housing Review
    • /
    • v.12 no.3
    • /
    • pp.67-78
    • /
    • 2021
  • After World War II, modular housing was developed as a means of quickly and efficiently meeting the housing supply demand. For the past 30 plus years, efforts have been made to improve modular housing in South Korea and to increase their competitiveness in the housing market. This study investigated modular houses based on a steel framed rahem structure which provides a flexible floor plan where walls are easily reconfigured to create rooms of various sizes and functions. Similar to the factory production methods used in the automotive industry, the modular housing industry can also benefit by standardizing such aspects as building components, manufacturing and construction methods, materials, process management, and floor plans. This study examined the feasibility of using a 3m × 3m module for developing various floor plans which are easy to produce and transport. Each 3m × 3m module can be configured to meet different living needs resulting in a complete home when multiple modules are connected. The module configurations can be varied to meet ground transportation and crane limitations. This study found that a 3m × 3m steel framed modular unit is a promising step towards providing residents with plans that meet their living preferences while improving and increasing the supply of modular houses.

Shear Strength Reduction Ratio of Reinforced Concrete Shear Walls with Openings (개구부를 갖는 철근콘크리트 전단벽의 전단강도 저감률)

  • Bae, Baek-Il;Choi, Yun-Cheul;Choi, Chang-Sik;Choi, Hyun-Ki
    • Journal of the Korea Concrete Institute
    • /
    • v.22 no.4
    • /
    • pp.451-460
    • /
    • 2010
  • There are many types of remodeling, however, engineers and architectures preferred to merge two or more separate units to one very spacious unit. Performing this type of remodeling, in the case of wall dominant apartments, requires partial removal of structural wall causing a concern of structural integrity. However, there are insufficient studies about partial removal, that is, openings. Presently, ACI standard have no clear way to evaluate the effect of opening on the structural wall. AIJ has the provision about strength reduction factor '$\gamma$'. However, this reduction factor cannot exactly evaluate the reduction effect of openings because this factor '$\gamma$' was determined through the elastic analysis. Therefore, in this study, 2 structural wall specimens were tested and many test results from previous studies were collected. Using these data, this study performed statistical analysis about strength of structural wall which have the opening in wall panel. And this study performed parametric study verifying shear strength reducing effect by opening area. In the results of statistical study, previous reduction factor show very conservative results because this equation did not consider other factors, reinforcement ratio and aspect ratio of openings, which was affect the shear strength of shear walls. Therefore we performed parametric study based on the test data and suggest new equation for shear strength reduction factor '$\gamma$'.

The Improvement Direction of Piloti Space for Neighborhood Regeneration of Deteriorated Low-Rise Residential Block (노후 저층주거지 근린재생을 위한 필로티 공간 개선 방향)

  • Yoo, Hae-Yeon;Song, Jun-Yeop;Yang, Ji-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.761-770
    • /
    • 2017
  • The objective of this study is to propose a community facility design for the revitalization of the piloti spaces of deteriorated low-rise residential blocks. For this study, the precedent research and institutional limitations are examined. In addition, this study selected and analyzed a deteriorated low-rise residential block utilizing pilotis. Generally, in this type of residence, 8 to 10 generations live together in multi-family houses and row houses, so it is a type of housing that lacks both public space and parking places. Therefore, we attempted to improve the situation of the communities by making use of the space between the pillars and walls without infringing on the parking places. In addition, we took into consideration the design and arrangement of the piloti by evaluating the inconveniences and needs of the residents through interviews. Specifically, various modules were planned and used to transform the spaces between the pillars of the pillar type piloti structure. This study examined the possibilities offered by various materials and modules, and studied the diverse possibilities that can be offered by changing the modules.

Non-linear Time History Analysis of Piloti-Type High-rise RC Buildings (필로티형 고층 RC건물의 비선형시간이력해석)

  • Ko, Dong-Woo;Lee, Han-Seon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.13 no.1
    • /
    • pp.35-43
    • /
    • 2009
  • Two types of piloti-type high-rise RC building structures having irregularity in the lower two stories were selected as prototypes, and nonlinear time history analysis was performed using OpenSees to verify the analysis technique and to investigate the seismic capacity of those buildings. One of the buildings studied had a symmetrical moment-resisting frame (BF), while the other had an infilled shear wall in only one of the exterior frames (ESW). A fiber model, consisting of concrete and reinforcing bar represented from the stress-strain relationship, was adapted and used to simulate the nonlinearity of members, and MVLEM (Multi Vertical Linear Element Model) was used to simulate the behavior of the wall. The analytical results simulate the behavior of piloti-type high-rise RC building structures well, including the stiffness and yield force of piloti stories, the rocking behavior of the upper structure and the variation of the axial stiffness of the column due to variation in loading condition. However, MVLEM has a limitation in simulating the abrupt increasing lateral stiffness of a wall, due to the torsional mode behavior of the building. The design force obtained from a nonlinear time history analysis was shown to be about $20{\sim}30%$ smaller than that obtained in the experiment. For this reason, further research is required to match the analytical results with real structures, in order to use nonlinear time history analysis in designing a piloti-type high-rise RC building.

A Study on the Compression of Construction Period by the Improvement of Trench Excavation for Slurry Wall Method (지하연속벽 시공 시 트렌치 굴착방법 개선을 통한 공기단축에 관한 연구: 현장적용사례를 중심으로)

  • Lee, Young Soo;Park, Hyung-Keun;Kang, Kyubyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.499-505
    • /
    • 2012
  • As the excavation depths during excavation works in urban sites are getting deeper and bigger, It is necessary to study for the improvements to solve the problems in the excavation processes. This research deals with the excavation method that can not only minimize the effect on the surrounding constructions, but also shorten the construction period of the excavation work. For this research, there have been an extensive literature review of the bibliographic data about Slurry Wall Method, which is recognized around the world, and the analysis of the major problems in the existing ineffective construction step. These efforts led to the technical improvements. Accordingly, a new construction method applied with the new technical factors has been suggested, and it was possible to compare Slurry Wall Method with the construction method and analyze them on the base of the examples using the suggested method. This new method decreased the excavation period by 15 days. It took only 33days to finish the excavation work, as compared to 48 days that can be seen on the pre-modification schedule. Furthermore, the suggested method in this research is safer, more economically feasible, and better for the environment than Slurry Wall Method. It will contribute to shortening the construction period of Slurry Wall Method in the end.