• Title/Summary/Keyword: 방사광가속기

Search Result 50, Processing Time 0.033 seconds

뉴스의 인물-포항가속기연구소장 이 동녕 박사

  • Min, Yeong-Gi
    • The Science & Technology
    • /
    • v.28 no.7 s.314
    • /
    • pp.31-34
    • /
    • 1995
  • 우리나라 최초로 시설된 포항방사광가속기는 1988년 착수하여 6년만인 작년말에 준공되었다. B일본에도 없는 제3세대 최신형으로 1천5백억원을 투입한 방사광가속기가 완공되기까지는 6년동안 심혈을 기울여 전 과정을 진두지휘한 포항공대 이동녕 박사의 숨결이 담겨있다. 방사광가속기 준공의 산파역인 이동영 박사에게 앞으로의 설계를 들어보았다.

  • PDF

Pohang Accelerator Laboratory and the 4th Generation Light Sourc (포항가속기연구소와 제4세대 방사광가속기)

  • Choi, Jin-Hyuk
    • Journal of the Korean Vacuum Society
    • /
    • v.15 no.6
    • /
    • pp.547-555
    • /
    • 2006
  • The Pohang Light Source (PLS) of Pohang Accelerator Laboratory (PAL), which was constructed in 1994, is a 3rd generation synchrotron light source user facility. It consists of 2.5 GeV linear accelerator and a storage ring with circumference of 280 m. Presently, 27 beamlines around the storage ring are in operation providing synchrotron radiations to users. In addition, PAL has a construction project of the 4th generation light source. In this paper, the operation status of the PLS is described and the prospect of the 4th generation light source is reviewed.

포항공과대학 방사광가속기 건설계회

  • 오세웅
    • 전기의세계
    • /
    • v.38 no.5
    • /
    • pp.5-17
    • /
    • 1989
  • 포항공과대학은 대단위 연구기설의 하나로서 740억원 규모의 제3세대 방사광가속기(PLS)를 건설키로 확정하고 1988년 4월 이의 추진에 착수하였다. 이 시설 및 추진현황을 소개하고자 한다.

  • PDF

포항방사광가속기 시운전 중 진공도 변화

  • Ha, Tae-Gyun;Park, Jong-Do
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2012.02a
    • /
    • pp.121-121
    • /
    • 2012
  • 포항방사광가속기의 성능향상사업이 3년 간 진행되어 현재 본격적인 가동을 위한 시운전 중에 있다. 전자로부터 발생한 방사광이 저장링 진공챔버 내부 특히 광자막이에 맞으면 그 표면으로부터 다량의 기체가 방출되어 압력이 높아진다. 여기서는 시운전 초기 단계에서 저장링 진공챔버 내부의 진공도 변화 양상을 발표한다.

  • PDF

RI동정

  • Korea Radioisotope Association
    • 동위원소뉴스
    • /
    • no.2 s.62
    • /
    • pp.5-8
    • /
    • 2002
  • PDF

Policy Evaluation of the Large-scale Research Facility by Period: Focusing on PSL-II Accelerator (대형연구시설 정책의 시기별 평가: 3세대 방사광가속기를 중심으로)

  • Yun, Sujin
    • Journal of Technology Innovation
    • /
    • v.25 no.4
    • /
    • pp.285-311
    • /
    • 2017
  • PSL-II Accelerator is a large-scale research facility located in Pohang, which was established in 1988 and operated since 1995. It is a program to be promoted to contribute to basic science research in Korea by applying it to cutting-edge research in the field of basic and applied science. It is estimated that around KRW 787.9 billion was invested for construction and operation in the near-30-year period until 2016. Although there have been various evaluations of the need, importance and effectiveness of accelerator in relation to the accelerator policy, most of them emphasize the successful outcome of the present time and suggest the government's need for sustained support in the future or suggest policy implications for improving the policy in a comprehensive manner. And there was no systematic analysis of the results on a comprehensive review or the various policy evaluations of the accelerator policy. In this study, three stages of PSL-II accelerator program were evaluated, and five main criteria of policy activity were considered. The purpose of this study is to suggest the policy implications related to the principles of policy activity which is essential in construction and operation of similar large-scale research facilities in addition to PSL-II accelerator.

Design of Third Harmonic Superconducting RF Cavity for Pohang Light Source (포항방사광가속기의 초전도 3차 하모닉 RF 공동기의 설계)

  • 손영욱;김은산;박인수;김경렬;전명환;김형균
    • Proceedings of the Korean Magnestics Society Conference
    • /
    • 2005.12a
    • /
    • pp.94-96
    • /
    • 2005
  • 포항방사광가속기의 전자빔수명을 연장하기 위한 3차 하모닉 초전도 RF 공동기를 개발하고 있다. 저장링 빔물리 계산에 따르면 3차 하모닉 초전도 RF 공동기를 설치할 경우 점자빔의 수명이 약2.3배 증가하는 것으로 나타났다. 또 이 공동기를 설치할 경우 란다우 (Landau) 감쇄 (damping)에 의한 빔의 안정화도 개선되는 효과가 있다. 본 논문은 이것을 실현하기 위한 초전도 RF 공동기의 전자기장 분포와 고차원 전자장 계산을 통하여 최적의 공동기의 모양 결정과 설계 특성에 대한 것을 보고 하고자 한다.

  • PDF