• Title/Summary/Keyword: 방류수질

Search Result 348, Processing Time 0.025 seconds

Temporal and Spatial Analysis of Water Quality Data Observed from Major Water Quality Stations in Nakdonggang Watershed (낙동강 유역 주요 수질측정지점의 시·공간적 수질특성 분석)

  • Kim, So Rae;Kyung, Jo Hyun;Kim, Sang Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.545-545
    • /
    • 2017
  • The purpose of this study was to analyze the characteristics of water quality and spatial and temporal water quality in Nakdong River basin. Spatial changes of water quality in Nakdong River due to inflow of sewage treatment plant and main tributaries were analyzed. The water quality data were collected from the water environment information system of the National Institute of Environmental Research (NIED) for 8 days interval from 2004 to 2015, and the collected data were analyzed for water quality items (flow rate, BOD, TN, TP). The discharge water quality data of 32 sewage treatment plants were collected from the National Institute of Environmental Research (NIER) nationwide from 2012 to 2015 and arithmetically averaged over the spring and autumn seasons.

  • PDF

A study on environmental flow release through flood control reservoir (담양·화순 홍수조절지 환경대응용수 활용방안 연구)

  • Dong Gue Choe;Jong Duk Park;Dong Jin Kim;Seon Woong Ryu;Soo Jin Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.371-371
    • /
    • 2023
  • 담양 및 화순 홍수조절지는 홍수 시 본류에 계획방류량만 흘러가도록 제수문을 운영하고, 계획방류량을 초과하는 홍수량은 하도 및 조절지 내에 저류하여 홍수를 지체시킨 후 저류된 홍수량은 첨두홍수가 지나간 이후 방류하는 방법으로 영산강 유역의 홍수를 방어하기 위해 '12년 건설되었다. 그러나 홍수조절지는 200년 빈도의 홍수량을 저감 시키도록 설계됨에 따라 준공 이후 10년간 '20년 8월 홍수 등 3회만 홍수방어용으로 활용되었다. 영산강은 오염부하량 대비 유출량 부족 등으로 수질관리에 취약하고 하천유지용수를 공급하는 다목적댐이 없는 등 수자원 확보가 어려우므로, 비홍수기 홍수조절지에 환경대응용수를 담수 및 방류하여 영산강의 유량확보 및 수질개선 등 활용 다변화 방안을 모색하고자 한다. 이와 관련하여 '16년 및 '19년에 시범담수를 실시하였으나, 담수 수질 관리의 어려움, 방류 전후 강우 등 제한적 여건으로 인해 하류 유량증가 및 수질 개선 효과의 확인은 어려웠으며, 제방 물비침 등을 발견하여 시설 안정성 확보가 필요한 것으로 확인되었다. '21년 안정성 확보를 위한 보강 그라우팅을 시행했으며, '19년부터 '21년 2월까지 「홍수조절지를 활용한 영산강 수질개선 방안」연구용역을 실시하여, 비홍수기 활용방안을 수립하였다. '21년 4/4분기 댐과 보 등의 연계운영협의회에 '시범담수 계획' 안건 상정 및 의결을 거쳤고, '22년 3월 25~26일까지 담양 74mm, 화순 61mm 비가 내려 담양 63만m3, 화순 151만m3를 담수하고 18~19일간 저류 후 담양은 평균 3.0m3/초로 25시간 동안, 화순은 평균 5.0m3/초로 32시간 동안 하류로 방류하였다. 방류 후 담양·화순 모두 가까운 하류 수위국 수위 상승을 확인했으며, 화순의 경우 하류 수질에 일부 영향이 있음을 확인하였다. 다만, 초기유출수 배제 등을 고려하지 않아 담수의 수질이 본류보다 좋지 않았으며, 이에 따라 수질 영향의 인과관계 확인이 어려웠다. 기존 연구용역에서 제시한 비홍수기 활용방안의 검증·보완을 위한 연구용역이 '22.5월부터 '23.12월까지 진행될 예정이며, 초기유출수 배제를 위한 조건 재수립, 수질 모니터링지점 확대 등 보완된 '시범담수 계획'을 '23.3월 댐과 보 등의 연계운영협의회에 보고하였다. 연말까지 연구용역과 연계한 시범담수·방류 시행 및 모니터링·효과분석을 통해 비홍수기 홍수조절지 최적운영방안을 마련할 계획이다.

  • PDF

Reservoir Operation for Water Quantity and Quality using KModSim (KModSim을 이용한 수량.수질의 저수지 운영계획)

  • Lee, Jin-Hee;Ko, Ick-Hwan;Kang, Shin-Uk;Hwang, Man-Ha;Noh, Jun-Woo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.1693-1697
    • /
    • 2009
  • 수자원의 지속적 확보기술개발사업의 장단기 저수지 연계운영 및 수질개선 방안 연구에서 개발 중인 범용 하천유역관리 모형인 KModSim은 그 수행속도와 모델 구성의 편이성으로 인해 하천의 수요처와 다수개의 저수지를 포함하는 대단위 유역에 적용이 용이하다. 본 연구에서는 현재 한국수자원공사에서 저수지 운영계획에 사용하고 있는 저수지 운영 기준수위를 바탕으로 하천유지용수와 수질개선용수를 확보하는 방안을 검토하였다. 우선 수량과 수질을 고려한 저수지 운영계획을 수립하기 위하여 기존의 수량만을 분배하는 물배분 시스템을 바탕으로 방류량에 증가에 따라 수질개선을 유도할 수 있도록 수질 개선 용수 수요노드를 추가하였다. 이때 유역내의 저수지의 기준수위와 하천의 하천유지용수 및 용수수요노드의 우선순위의 설정에 따라 deficit supply 방식의 물분배가 가능하게 하였으며 이를 통해 꼭 필요한 유량이 발생 할 때 유량을 공급할 수 있도록 모형을 설정 하였다. 반면 방류량에 따른 수질개선 효과를 분석하기 위하여 과거의 수질 측정자료의 상관성을 분석하여 다중회귀분석 모형을 개발하였다. 개발된 모형은 방류량의 증가에 따른 수질개선 효과를 분석할 수 있는 모형으로 특정시점에 있어서 특정 수질 매개변수의 농도를 예측할 수 있으며 적정수준 이하의 수질 농도를 유지하기 위하여 필요한 방류량을 계산하도록 하였다. 이러한 수질 개선을 위한 공급 시나리오는 기존의 용수 우선의 시나리오 분석과 더불어 운영자에게 다양한 정보를 제공하여 보다 효율적 저수지 운영계획이 수립될 수 있도록 활용될 수 있을 것으로 기대한다.

  • PDF

Evaluation of Stream Water Quantity and Quality Behavior by Weir operation in Nakdong River Basin using SWAT (SWAT을 이용한 낙동강유역의 보 개방에 따른 하천 수량·수질 거동 분석)

  • Lee, Ji Wan;Lee, Yong Gwan;Woo, So Young;Jang, Won Jin;Kim, Seong Joon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.44-44
    • /
    • 2018
  • 조류(녹조)발생과 대응 연차보고서(2016)에 따르면, 낙동강 유역의 녹조현상은 2013년부터 해마다 발생했으며 국가적으로 가장 극심한 가뭄을 겪은 2015년의 경우 최장 161일 동안 지속되었음을 보고하였다. 이러한 녹조대응을 위해 환경부 국토부 등 관계기관은 댐 보 연계운영협의회 등을 통해 2016년 8월부터 낙동강 일부 댐 및 보에 대해 부분 방류를 실시하였다. 댐-보 연계운영에 따른 수문 수질 거동 분석은 국가 유역관리 측면에서 우선적으로 대비해야 할 중요한 문제이나, 댐보 연계의 효율적인 운영을 위한 정확한 분석과 평가에 대한 연구가 체계적으로 이뤄지고 있지 않은 실정이다. 본 연구에서는 낙동강유역($2,369km^2$)을 대상으로 SWAT(Soil and Water Assessment Tool)을 이용하여 지표수와 지하수의 상호작용에 의한 물수지 분석을 수행하고, 수질(SS, T-N, T-P)을 모의하였다. SWAT 모형 구축을 위해 낙동강유역을 표준유역 단위로 구분하고, 기상자료, 다목적댐(안동댐, 임하댐, 합천댐, 남감댐, 밀양댐)과 다기능보(상주보, 구미보, 칠곡보, 강정보, 달성보, 합천보, 함안보) 운영자료, 국가지하수정보센터에서 관측 및 관리하고 있는 지하수위 관측자료, 국가수질측정망 하천수 수질 측정자료를 수집하였다. SWAT 모형의 신뢰성있는 수문 및 수질 보정을 위해 낙동강유역 내 위치하는 다목적댐 및 다기능보의 실측 방류량을 이용하여 댐 운영모의를 고려하였고, 지하수위, 토양수분 및 수질자료를 이용하여 모형의 시공간적 보정(2005~2009)과 검증(2010~2017)을 실시하였다. 댐-보 연계운영 평가를 위해 환경부에서 제시한 4개의 연계운영 시나리오 중 3개의 시나리오((1) 댐+보 동시방류+제약수위 유지, (2) 보 동시방류+제약수위 유지, (3) 보 순차방류+제약수위 유지)를 선택하여 모의하였으며, 시나리오에 따른 수문 수질 거동을 분석하였다.

  • PDF

The Relationship Between Water Quality and Needed Discharge during Drought Season (갈수시 하천수질과 필요유량 관계 연구)

  • Jung, young Hun;Yi, Choong Sung;Kim, Hung Soo;Shim, Myung Pil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.748-752
    • /
    • 2004
  • 근래 환경의 중요성이 크게 인식되면서 하천의 수질관리에 대해서도 많은 연구가 진행되고 있다. 오염된 하천의 수질을 개선하기 위한 방법 중에 배출 오염원을 삭감시키는 환경기초시설이나 댐과 같은 저수구조물에서 양질의 용수를 방류하여 희석시킴으로써 하천의 수질오염을 개선할 수 있다. 본 연구에서는 하천수질을 개선시키는 과정에서 희석을 위한 저수지의 방류량을 필요유량으로 간주하였으며 일정 수질농도를 지속적으로 지니고 있는 자연하천의 유입량과 이때 어느 대상지점의 목표수질등급을 만족시킬 수 있는 저수구조물에서의 인위적 조정이 가능한 필요유량의 관계를 연구하였다. 연구대상 지역은 금강 본류와 본류로 유입하는 갑천유역을 대상으로 하였다. 즉, 갑천의 확률갈수유량을 3등급과 4등급으로 가정하고, 이들 유량이 금강본류로 유입되련, 금강본류와 미호천합류 바로 전의 금강하류지점 목표수질을 2등급이라 하였을 때, 이를 만족할 수 있는 금강본류의 필요유량을 산정하고자 하였다. 이때 갑천유역의 일강우량자료는 기존 Markov 연쇄의 상태모형을 개선해 모의하였고, 강우-유출 모형으로는 NWS-PC모형을 이용하였는데 컴플렉스 혼합 진화기법으로 매개변수들을 보정하여 확률갈수유량을 산정하였다. 다음에 QUAL2E를 이용하여 목표수질을 만족하는 희석 목적의 유랑을 구하여 필요유량으로 간주하였다. 결과를 살펴보면, 유입되는 갑천의 확률갈수유량들에 대하여 대청조정지댐에서 방류량이 목표수질을 만족시키기 위해서는 $0.5\~2.5$배정도 더 유입되어야 함을 알 수 있었다.

  • PDF

The performance evaluation of dam management by using Granger causal analysis (그랜저 인과분석을 통한 댐관리 성과평가)

  • Cho, Sung-Min;Yoo, Myoung-Kwan;Lee, Deokro
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.2
    • /
    • pp.135-144
    • /
    • 2021
  • This paper attempted to find implications for water resource management and water quality improvement by analyzing the causal relationship among discharge, water temperature and pollution index, which were expected to have a great effect on water quality with the rise of water temperature and precipitation change as the warming effect in recent years. For this purpose, the unit root test, cointegration test, and Granger causal test were carried out for 10 multi-purpose dams in Korean major water systems using time series data on discharge, water temperature, BOD, COD and DO. It was analyzed that the fluctuation of water temperature affected the pollution index more than the fluctuation of discharge volume. Also, Hapcheon dam and Chungju dam were the best water quality management dams based on the high causal relationship between water quality and discharge. The second rank was Daecheong dam. The third-ranking group were Yongdam and Andong dam, whose causal relationships between water quality and discharge were low. The last group were the remaining five dams.

Effects of Coastal Environment by Discharge from the Sewage Treatment Plant (해안방류된 하수처리수가 해양환경에 미치는 영향)

  • Shin, Bumshick;Kim, Kyu-Han
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.127-133
    • /
    • 2020
  • Most sewage treatment plants located offshore are discharged to the shore either directly or through rivers. Therefore, the water quality of the treated water discharged from the sewage treatment plant affects the water quality of the river water discharged to the river and the ocean. In this study, field surveys and numerical simulations were conducted to investigate the effect of treated water from the sewage treatment plant adjacent to the coastal environment. As a result of analyzing the water quality and sediment quality with the samples collected from the river and the estuary where the treated water was discharged to understand the impact on the coast, the treated water discharged from the sewage treatment plant was discharged to the river without exceeding the design criteria. However, the water quality discharged to the shore through estuaries was more contaminated than treated water. The cause of water quality deterioration of coastal effluent is due to the sedimentation of estuary temporarily by longshore sediment sransport which appeared around the estuary, the occurrence of estuary obstruction, and the increase of stagnant time in the estuary. As it was released and discharged, it was analyzed to affect the water quality, water quality and marine life around the estuary. Therefore, in the case of the east coast where the longshore sediment transport is strong, when planning the sewage treatment facility discharged to the ocean, it is necessary to closely examine the water quality change of the river water in the treated water such as the river mouth occlusion by the longshore sediment transport.

Application of Horizontal Flow Fins Inclined Plate for Sedimentation Efficiencies Improvement in River Water with High Turbidity (고탁도 원수의 침전효율 증대를 위한 수평류식 핀 경사판 적용에 관한 연구)

  • Choi, Jung-Su;Jin, Oh-Suk;Joo, Hyun-Jong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.34 no.9
    • /
    • pp.644-650
    • /
    • 2012
  • The purpose of this study is to evaluate the applicability of Horizontal Flow Fins Inclined Plate (HFIP) for the removal of high-turbidity raw water in water treatment plant. As an experimental result, treated water quality and removal efficiency were 0.34 NTU and 90.45% by the application of HFIP for low-turbidity raw water and for the high-turbidity influent resulted 0.75 NTU and 97.27% in removal efficiency. In view of stability for discharge water NTU, the standard deviation were found as 0.12 NTU for low-turbidity and 0.75 NTU for high-turbidity raw water indicating low fluctuations. Result of flow analysis using CFD (Computational Fluid Dynamic) that the addition of HFIP improves the turbidity treatment followed by the stabilization of flow velocity distribution and increases in settling velocity.

Cost Analysis of Ocean Outfall and Tertiary Treatment Processes in Suyong Sewage Treatment Plant (수영 하수처리장 방류수의 해중 방류법과 3차 처리시설 설치시 비용 비교 분석)

  • 박해식;조은일;박청길
    • Journal of Environmental Science International
    • /
    • v.8 no.1
    • /
    • pp.115-123
    • /
    • 1999
  • Sewage has been almost treated by secondary treatment process. Secondary-treated effluent of sewage treatment plant caused the pollution of nearby beach. Nitrogen(N) and Phosphorus(P) in effluent water have caused many problems on estuary, such as red tide, eutrophication and aquatic toxicity. Therefore, the effective nitrogen and phosphorus removal from sewage treatment plants is necessary to prevent those pollution problems. However, little sewage treatment plant in Korea is effectively being operated for the removal of the nutrients. This study is analyzed for the effectiveness of cost when tertiary treatment process and Ocean Outfall are applied for the water quality of Suyong Bay After secondary treatment process, the effluent was discharged from the seabed in the depth of 32m of 4000m offshore. Pollutant concentration is decreased as much as the 180 times after the result of initial dilution, so that environmental protection requirement of Suyong Bay can satisfied. This Ocean Outfall process can save the 2.6~3.5 times as much as the cost of construction and operation for tertiary treatment process running over a 20 year.

  • PDF