• Title/Summary/Keyword: 발파 장약량

Search Result 86, Processing Time 0.025 seconds

Development of Automated Pattern Generation Method for Tunnel Blasting (터널발파설계 자동화를 위한 발파패턴 설계식 개발)

  • Choi Yong-Kun
    • Explosives and Blasting
    • /
    • v.23 no.4
    • /
    • pp.19-29
    • /
    • 2005
  • Blasting design methods applied in Korea were originally made for foreign rock conditions and blasting environments. Therefore, it has not been fully fitted to the Korean rock renditions. Since 1998, several studies for the automated pattern design of tunnel blasting have been carried out. As the result, a new blasting design method which can settle the problems was developed. Through it is more complex than prior method, it call provide a variety of advantages for us. Through the method, it is possible to vary charge weight according to the changing advance. It ran also be applied to the various design for contour holes. In this study, the newly developed method is introduced.

Relationship between Rock Quality Designation and Blasting Vibration Constant "K" & Decay Constant "n" by Bottom Blasting Pattern (바닥발파에서 암질지수(RQD)와 발파진동상수 K, n의 관계)

  • 천병식;오민열
    • Geotechnical Engineering
    • /
    • v.11 no.3
    • /
    • pp.55-68
    • /
    • 1995
  • This paper is the analysis of the relationship between RQD and decay constant, blasting vi bration constant of cube root scaling and square root scaling, through experimental blast ins test in subway construction for excavation of shaft hole by bottom blasting. The magnitude of particle velocity is largely effected by the distance from blasting source, the maximum charge per delay and the properties of ground. In order to verify the effects of ground properties on blast-induced vibration, the relation-ship between magnitude of blasting vibration and Rock Quality Disignation which stands for joint property was studied. The results of test are verified that blasting vibration constant "K" and the absolute value("n") of decay constant relatively increse as RQD increased. According to the result, it can be predict the particle velocity by the blast -induced vibration in bottom blasting pattern.om blasting pattern.

  • PDF

A Study on the Economical Design of Bench Blasting in Lime Stone Quarry (석회석광산에서의 경제적인 벤치발파패턴에 대한 연구)

  • 이천식;정민수;이윤재;송영석;양난주;강대우
    • Explosives and Blasting
    • /
    • v.21 no.1
    • /
    • pp.19-27
    • /
    • 2003
  • 국내 석회석 광산에서는 벤치 발파패턴을 현장의 KNOW-HOW에 따라 가장 경제저인 발파패턴을 적용하고 있다. 그러나 인건비 재료비등 제반경비가 상승함에 따라 좀 더 효율적인 발파방법의 개선이 요구되고 있는 바, 현 석회석 광산에서의 발파패턴을 보다 개선하여 경제적인 발파패턴을 적용하고, 그에 따른 고려해야 할 사항들을 본 논문에서 연구 하고자 한다. 따라서 국내 석회석 광산의 발파 패턴과 외국의 광산발파 패턴을 비교하고, 수치해석을 적용하여 기존의 발파 패턴에서 장약길이, 공간격, 장약량의 변화, 천공경은 102mm에서 115mm로 변화하고 장양방법을 단일장약에서 이중장약으로 변화하여 동해 쌍용자원에서 시험을 실시하였다. 연구 결과 장약길이의 20% 감소는 Power Factor를 (20%)낮게 하나, 파쇄효과는 28% 감소하고 Back Break가 (7%)이상 발생하였으며, 천공경을 115mm로 적용하고, 장약길이를 11% 감소를 위하여 이중장약을 적용하여 Power Factor를 10% 낮게 하였을 때 파쇄효과는 22.45%가 증대되었으며, 기존 동일 패턴에 Booster를 추가로 적용하였을 때 파쇄효과는 13.21% 가 증대되었고, Power Factor는 11% 가 감소되는 것을 알 수 있었다.

A Study on the Blasting Vibration Characteristics of Geomunoreum Lava Tubes System, Jeju Island (제주 거문오름 용암동굴계에 영향을 미치는 발파진동특성에 대한 연구)

  • Song, Jae-Yong;Lee, Geun-Chun;Ahn, Ung-San;Lim, Hyun-Muk;Moon, Seong-Woo;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.31 no.1
    • /
    • pp.103-118
    • /
    • 2021
  • For management and preservation measures of lava tube, it is studied how the blasting vibration by constructions near Geomunoreum lava tubes in Jeju affect lava tube. 11 boreholes were drilled in study area, and in-situ blasting tests were conducted by changing from 0.5 kg to 10 kg charge per delay in those boreholes. The vibration velocity, which meets the regulatory vibration criterion during daytime, was estimated as below 0.276 cm/sec by analyzing the relationship between vibration velocity and vibration level. In addition, SRE and CRE were calculated from the results of in-situ blasting tests, and k-values were shown as 130.04 in SRE, 199.71 in CRE, respectively. Also, n-values were shown as -1.717 in SRE, -1.711 in CRE, respectively. Charge per delay were assessed based on these equations, and charges per delay had ranges of 0.57~7.42 kg/delay in estimation equation of vibration velocity, 0.21~5.29 kg/delay in SRE, and 0.04~5.51 kg/delay in CRE, considering the 0.2 kine vibration criterion for cultural heritage and the 20~100 m distance from vibration source. Additionally, the relationships which meet the criteria of 0.2 kine, were calculated by combining CRE in this study with the result of previous study. Allowable charges per delay, which meet the criteria of 0.2 kine, were evaluated as 1.07 kg/delay in 50 m, 5.13 kg/delay in 100 m and 22.26 kg/delay in 200 m distances. These relationships for each vibration velocity are useful to deduce charge per delay for the ground near Geomunoreum lava tube.

On the vibration influence to the running power plant facilities when the foundation excavated of the cautious blasting works. (노천굴착에서 발파진동의 크기를 감량 시키기 위한 정밀파실험식)

  • Huh Ginn
    • Explosives and Blasting
    • /
    • v.9 no.1
    • /
    • pp.3-13
    • /
    • 1991
  • The cautious blasting works had been used with emulsion explosion electric M/S delay caps. Drill depth was from 3m to 6m with Crawler Drill ${\phi}70mm$ on the calcalious sand stone (soft -modelate -semi hard Rock). The total numbers of test blast were 88. Scale distance were induced 15.52-60.32. It was applied to propagation Law in blasting vibration as follows. Propagtion Law in Blasting Vibration $V=K(\frac{D}{W^b})^n$ were V : Peak partical velocity(cm/sec) D : Distance between explosion and recording sites(m) W : Maximum charge per delay-period of eight milliseconds or more (kg) K : Ground transmission constant, empirically determind on the Rocks, Explosive and drilling pattern ets. b : Charge exponents n : Reduced exponents where the quantity $\frac{D}{W^b}$ is known as the scale distance. Above equation is worked by the U.S Bureau of Mines to determine peak particle velocity. The propagation Law can be catagorized in three groups. Cubic root Scaling charge per delay Square root Scaling of charge per delay Site-specific Scaling of charge Per delay Plots of peak particle velocity versus distoance were made on log-log coordinates. The data are grouped by test and P.P.V. The linear grouping of the data permits their representation by an equation of the form ; $V=K(\frac{D}{W^{\frac{1}{3}})^{-n}$ The value of K(41 or 124) and n(1.41 or 1.66) were determined for each set of data by the method of least squores. Statistical tests showed that a common slope, n, could be used for all data of a given components. Charge and reduction exponents carried out by multiple regressional analysis. It's divided into under loom over loom distance because the frequency is verified by the distance from blast site. Empirical equation of cautious blasting vibration is as follows. Over 30m ------- under l00m ${\cdots\cdots\cdots}{\;}41(D/sqrt[2]{W})^{-1.41}{\;}{\cdots\cdots\cdots\cdots\cdots}{\;}A$ Over 100m ${\cdots\cdots\cdots\cdots\cdots}{\;}121(D/sqrt[3]{W})^{-1.66}{\;}{\cdots\cdots\cdots\cdots\cdots}{\;}B$ where ; V is peak particle velocity In cm / sec D is distance in m and W, maximLlm charge weight per day in kg K value on the above equation has to be more specified for further understaring about the effect of explosives, Rock strength. And Drilling pattern on the vibration levels, it is necessary to carry out more tests.

  • PDF

A Case Study of Application of the Emulsion Explosives in Long Hole Tunnel Blasting (장공 터널발파에서 Emulsion폭약의 시공사례와 적용성에 관한 연구)

  • 조영곤;김희도;이상돈
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.31-40
    • /
    • 2001
  • 일반적으로 장공발파(長孔發破) 방법(Long hole blasting method)은 그동안 주로 대규모 채탄막장이나 댐 기초굴착, 광산 등에서 행하여져 왔으나 최근 토목터널에서 시공 효율성 및 경제성을 목적으로 관심이 높아지고 있다. 기존의 터널설계 패턴은 I -Type을 기준으로 3.5~3.8m 천공이며 신공법 적용시 최대 4.Om까지 설계되는 것이 보통이었다. 과거 착암장비는 천공장이 늘어남으로서 슬러지에 의한 천공속도가 저하되어 천공비가 증가하기 때문에 빠른 슬러지 배제가 필요하고 Rod의 휨 현상에 의한 천공오차의 증대를 초래할 수 있는 단점이 있었다. 그러나 최근 장비의 발달로 인하여 천공각도 및 천공장 등을 Computer로 모니터링하여 제어할 수 있어 정밀한 천공이 가능하여 졌고 또한, 고성능 에멀젼계 폭약(Super Emulsion)의 개발로 그동안 극 경암터널에서 에멀젼계 폭약의 단점으로 여겨졌던 비 장약량의 증대와 사압현상의 발생, 굴진효율 저하문제론 극복할 수 있었다. 따라서 본 연구는 현재 건설중인 대상현장을 중심으로 장공 터널발파의 효율성과 경제성을 분석하고 나아가 암질에 따른 새로운 Type별 설계기준을 마련하는 기초자료로서 활용하고자 하였다. 된 연구의 대상현장은 충북 괴산군 영풍면 소재 중부내륙(여주-구미간) 고속도로 제 9공구 이화터널 건설공사현장으로 $\varphi{102mm}$ 무 장약공 Cylinder 4공을 이용한 심발법을 사용하였으며 천공장은 최대 5.0m로 2000년 11일 15일에서 동년 12월 15일까지 31일간 총 112회의 시험발파를 실시하여 평균 92%의 높은 굴진 효율을 기록하였다.

  • PDF

A Study on Experimental and Numerical Analysis for Behavior of Multi-layerd Pipeline Subjected to Blasting Vibration (지중 다중 관의 발파 진동 특성 분석을 위한 실험 및 수치해석적 연구)

  • Kim, Moon-Kyum;Won, Jong-Hwa;Noh, Gi-Seok;Cho, Seok-Ho;Kim, Kyung-Min
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.417-420
    • /
    • 2010
  • 지중매설관은 경우에 따라 긴 수송거리를 보이기 때문에 부식 및 충격에 의한 파손 등에 대한 모니터링이 어려운 실정이다. 이러한 조건을 극복하기 위하여 복합관 및 다중관을 설치하고 있으나, 이에 대한 연구는 아직 미비한 실정이다. 본 연구에서는 발파진동원에서 고정된 이격거리, 매설심도에서 배관 상단에 특정 진동속도를 발생시키는 발파 하중을 고려하여, 이격거리에 대한 수치해석을 수행하였으며 장약량에 따른 이격거리와 발파효율을 측정하였다. 실험값과 수치해석 값의 오차는 발파지점에서 가까울수록 크게 나타났으며 발파지점과 마주보는 방향이 반대방향보다 크게 나타났다.

  • PDF

철근콘크리트 기둥폭파 및 방호재료 특성에 대한 실험적 연구

  • 류창하;최수일;박용원;김양균
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1996.03a
    • /
    • pp.95-106
    • /
    • 1996
  • 건물발파해체 설계 및 시공에 있어서 중요한 공정의 하나는 불안정성을 유도하도록 실시하는 건물의 주요 지지부 기둥에 대한 발파이다. 이와 관련된 요소기술로는 기둥단면에 따라 천공패턴을 결정하고 적정장약량을 산정하는 것과 폭파시 파괴된 파편의 비산에 대한 방호기술을 들 수 있다. 비산은 인접건물에 대한 피해와 인명사고들을 유발할 수 있으므로 사전에 철저한 대책이 강구되어야 할 대상이다. (중략)

  • PDF

A Case Study on the Boring-Hole Blasting for Offering of the Ground Vibration Source (지진동 Source 제공을 위한 시추공 발파 기술 사례)

  • 조영곤;김희도;조준호;함준호
    • Proceedings of the KSEG Conference
    • /
    • 2003.04a
    • /
    • pp.109-116
    • /
    • 2003
  • 본 기술사례는 과학기술부가 주도하는 자연재해방재기술개발 국가중점연구사업 중 기상청 주관의 기상지진기술개발사업의 한반도 지각속도 구조연구 과제 중 서산지역과 포항지역을 연결하는 200km 측선에서 2차원 지각구조를 밝히기 위한 지각규모 굴절파탐사의 지진동 source 제공을 위해 발파로 실시하였다. 본 연구를 위하여 국내에서는 거의 실행해 본 경우가 없는 지발당 장약량이 500~1000kg의 발파를 실시하였다. 200개의 계측지점에 지진동이 전달될 수 있도록 충분한 폭속을 가진 폭약과 외부의 충격과 우수한 기폭력, 시차가 정확한 이중비전기뇌관을 특수 제작하여 사용하였다. 시추공내로 유출되는 물에 의한 사압을 방지하기 위하여 폭약은 철관용기를 제작하여 벌크 형태로 장약을 하여 발파를 하였다. 발파전 용기 밀폐 시험 및 용기제작 후 기폭실험, 수압작용으로 인한 폭약 및 뇌관에 미치는 영향 등을 실험을 통하여 사전 파악을 하였다. 또한 실제 발파 중 진동치를 측정한 결과 보안물건에 대한 진동치값은 미광무국식(USBM)을 이용하여 예측한 진동치보다 평균 180% 정도 높게 나타났다.

  • PDF

터널에서 대구경 무장약공과 선균열을 이용한 심빼기 공법에 관한 연구

  • 김재홍;임한욱
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2001.03a
    • /
    • pp.63-74
    • /
    • 2001
  • 실린더 컷은 터널 굴착단면의 크기에 관계없이 널리 이용된다. 본 연구에서는 발파당 굴진장을 증대시키기 위하여 종래의 방법과 다른 새로운 방법을 제안하였다. 이 방법의 새로운 패턴은 그림과 같으며, 각 단계별로 상세한 저항선, 공간간격은 별도 그림과 같다. 새로운 실린더 컷 방법과 종래의 방법과의 결과는 다음과 같다. 종래 방법은 굴진장이 천공장의 90-95%인데 비하여 새로운 방법은 대체로 99.5%이다. 비장약량이 1.363kg/㎥에서 1.297로 약 5% 감소되며, 비천공장이 2.393m/㎥에서 2.130으로 약 8% 감소된다. 그밖에 지반진동, 비산, 파쇄암의 크기 등이 종래 방법에 비하여 우수함을 확인하였다.

  • PDF