• Title/Summary/Keyword: 발파 설계

Search Result 286, Processing Time 0.025 seconds

Review of Applicability of the Standard Blasting Patterns of MLTM to Various Rock Types (국토해양부 표준발파패턴의 셰일암반 적용성에 관한 사례 연구)

  • Kim, Se-Hyun
    • Explosives and Blasting
    • /
    • v.27 no.1
    • /
    • pp.47-52
    • /
    • 2009
  • Blasting is necessary for excavation processes since more than 70% of korean land is consist of mountains. The vibration and noise accompanied by blasting processes usually bring about public complaints. Blasting patterns are chosen by economical efficiency, stability and construction conveniency. However, there are many alternatives without control to settle the popular complaint. To prevent those alternatives, standard blasting method for design and construction were suggested by MLTM (Ministry of Land, Transport and Maritime Affairs) in 2006. However, standard blasting pattern of MLTM was designed in a lump irrespective of types of rocks. Economical loss may occur by ignoring the characteristics of rocks for the applications to the rocks with low intensity, such as shale, or containing many joint. We deduced some economical progresses by performing test blasting with adjusted drilling spacing and length of burden considering the characteristics of local rock. This paper suggests the start of case studies for different applications. Economic improvement can be expected by applying those results deduced from case studies to design and construction.

The Kingdome Implosion (미국 Kingdome 구조물 발파해체사례)

  • 대한화약발파공학회
    • Explosives and Blasting
    • /
    • v.18 no.4
    • /
    • pp.61-68
    • /
    • 2000
  • 본 기사는 2000년 3월 26일 미국 시애틀 소재 Kingdome 체육관 시설을 발파해체공법을 이용하여 해체한 사례로서 The Journal of Explosives Engineering(v.17 n.5, 2000)에 기고한 Dr. Douglas A. Anderson (Senior Consultant, West Chester, PA office of Schnabel Engineering Associates, Inc.)의 글을 옮긴 것이다. Kingdome 구조물의 해체와 해제 후 Seahawk Stadium 건설의 책임을 맡은 주계약자는 Turner Construction 회사이며 발파해체 사전준비 및 사후처리의 택일은 Aman Environment사, 발파해체 설계 및 시공은 CDI사, 주위 주요 구조물에 대한 영향평가 및 진동계측은 Schnabel Engineering Associates사가 맡아 수행하였다. 이 건물은 세계에서 가장 큰 규모의 쉘 콘크리트 돔 구조로 되어 있으며, 주위에 주요 구조물들이 위치하고 있고 특히 이 지역에 과거 발생했던 지진으로 인하여 주민들이 지반진동에 대한 피해나 또는 지진을 유발하수도 있다는 위험 가능성에 매우 예민하여 관심이 높았던 해체사례이다. 이 구조물을 한번에 붕괴시킬 경우 지반에 25,000톤의 중량이 충격으로 작용할 수 있으므로 충격을 최소화하기 위한 방법에 초점을 맞추어 설계되었으며 5,905개의 천공에 4,728파운드(약 2,145kg)의 폭약이 사용되었고 도폭선을 이용하여 기폭시켰다. 사용된 도폭선의 길이는 약 37.9 Km에 달하였다. 발파해체 기사에 나타나 있듯이 주위에 피해를 주지 않고 성공적으로 수행되었다.

  • PDF

A case study on the reduction of Blasting vibration using EDD in tunnel (터널에서 전자뇌관을 이용한 발파진동 저감 기술 사례)

  • Yoon, Ji-Sun;Lee, Jin-Moo;Cho, Young-Gon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.433-441
    • /
    • 2004
  • 국내 발파 현장에서 사용되고 있는 폭약류에 강력한 폭굉력을 충분하게 발휘하기 위해서는 뇌관(Blasting cap, Detonator)의 역할이 중요하다. 그리고 이 뇌관의 정밀성에 따라 발파 효율의 차이가 있게된다. 초기의 도화선 및 공업뇌관에서 시작하여 현재 정밀성 면에서는 MS(Milli Second)뇌관의 경우 20ms또는 25ms의 정밀한 시차로 순차적으로 기폭함으로써 발파효과의 극대화와 소음 및 진동제어에 큰 효과를 이루었으나, 최근 개발된 진자뇌관의 경우 자체 IC회로를 내징하여 $1{\sim}2ms$의 초정밀시차(오차범위 $0.1{\sim}0.2ms$이내)의 구현이 가능해짐에 따라 이를 적절히 조합하여 설계함으로써 각종 제어발파, 파쇄도 향상, 암손상영역 저감 등의 효과에 대해 국외에서 연구가 진행되고 있는 것으로 알려지고 있다. 그러나 우리나라와 같이 도심지 발파 및 터널이나 노천 현장 근거리에 보안물건이 위치해 있어 진동제어가 절실히 필요한 상황에서 진동제어에 효과가 있는 것으로 알려진 전자뇌관에 대한 연구가 이루어지고 있지 않은 상황에서 본 연구는 앞으로 이루어질 전사뇌관에 대한 수많은 연구에 기초자료를 제공하고자 실시하였다. 본 연구에서는 이를 위해 국내에서 최초로 2003년 9월 23일 강원도 양구 지역읜 00터널에 전자뇌관을 이용한 시험발파를 실시하였고, 발파에 의한 진동 등을 조사하여 그 효율성을 검토하였다. 이를 위해 전자뇌관의 특성과 장점을 최대한 살리기 위하여 각공을 발파하는 방식, 즉 1지발에 1공을 발파하는 방식을 채택하고 비전기 뇌관과 전자뇌관으로 설계를 하여 각각의 발파효율을 비교하여 보았다. 그 결과 발파신동의 경우 비전기뇌관을 이용하여 1공씩을 1지발로 발파를 한 경우에는 18${\sim}$56%의 진동저감 효과가 있었고, 번 설계에 의해 진해오딘 발파에 비하여는 최대 70% 이상의 진동저감 효과가 있는 것으로 나타났다.

  • PDF

Rock Mass Classification and Its Use in Blast Design for Tunneling (암분류기법과 터널굴착을 위한 발파설계에의 활용)

  • Ryu Chang-Ha;SunWoo Choon;Choi Byung-Hee
    • Explosives and Blasting
    • /
    • v.24 no.1
    • /
    • pp.63-69
    • /
    • 2006
  • Building tunnels means dealing with what rock is encountered. Relocation of the site of the underground structure is rarely possible. Tunneling engineers and miners have to cope with the quality of the rock mass as it is. Different tunneling philosophies and different rock classification methods have been developed in various countries. Most of the rock classification methods are based on the response of the rock mass to the excavation. Tunnel support requirements could be assessed analytically, supplemented by rock mass classification predictions, and verified by measurements during construction. Rock mass classifications on their own should only be used for preliminary, planning purposes and not for final tunnel support. Design of blast pattern in tunneling projects in Korea is also mostly prepared according to the general rock classification methods such as RMR or Q. They, however, do not take into account the blast performance, and as a consequence, produce poor blasting results. In this paper, the methods of general rock classification and blast design for tunnel excavation in Korea are reviewed, and efforts to develop a new classification method, reflecting the blasting performance, are presented.

Evaluation of Blast Velocity by Artificial Joint Conditions using Numerical Analysis (수치해석을 이용한 인공절리 조건에 따른 발파속도 평가)

  • Suk, Chul-Gi;Noh, You-Song;Park, Hoon
    • Explosives and Blasting
    • /
    • v.35 no.4
    • /
    • pp.1-9
    • /
    • 2017
  • This study undertakes an evaluation of blast effect through the analysis of the contribution rate and effect that different artificial joint number, artificial joint spacing and artificial joint angle have on blast velocity. Blast velocity according to the different state of the artificial joint was obtained using AUTODYN, a dynamic analysis program. The result of the numerical analysis was subjected to further normalization analysis. For the contribution rate of design factors was analyzed using the robust design method. The orthogonal array used in the analysis was $L_9(3^4)$ and each parameters were having 3 levels. The result of normalization analysis regarding the artificial joint angle was indicated a tendency in which blast velocity decreased. The result of analyzing blast velocity regarding artificial joint spacing and artificial joint angle was indicated a tendency in which blast velocity decreased as artificial joint spacing increased when the angle was perpendicular. In the case of blast velocity contribution rates they were ranked in the descending order of artificial joint angle, artificial joint number, artificial joint spacing.

Numerical Study on the Characteristics of Fracture Growth in Fracture Controlled Blasting using Notched Blasthole (노치성형 발파공을 이용한 균열제어 발파방법의 균열발생 특성에 대한 수치해석적 고찰)

  • 백승규;김재동;류창하;임한욱
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1999.03a
    • /
    • pp.41-50
    • /
    • 1999
  • 발파는 토목, 건설현장이나 광산 등에서 암반에 대한 굴착 방법으로서 가장 널리 쓰이고 있는 방법중의 하나이다. 그러나 최근 들어 발파에 의한 진동이나 소음 등의 위해가 사회적 문제로까지 대두하고 있으며, 또한 발파작업에서 작업계획에 대한 결과의 정밀도를 높이기 위하여 조절발파 등 여러 가지 방법들이 연구 발전되어 가고 있는 추세에 있다. 이러한 연구들은 주로 현장 발파작업 및 발파패턴의 설계에 치중되어 있으며 발파모델을 이용한 해석 연구는 다소 미진한 정도이다. (중략)

  • PDF

A Case Study of Selecting Rock Excavation Method Considering the Geological Conditions in Daejon Area (대전지역의 토목지질학적 조건을 고려한 암파쇄공법 선정에 관한 사례연구)

  • 윤성현;이광열;안명석;류창하
    • Explosives and Blasting
    • /
    • v.19 no.4
    • /
    • pp.11-22
    • /
    • 2001
  • 토목공사장에서 암파쇄 작업은 경제성과 안정성에 지대한 영향을 미치는 작업이다. 본 논문은 대전지역에서 수행된 암파쇄 공법 설계 및 시공사례로서, 현장암반의 특성을 고려한 적정발파공법을 선정하기 위하여 대상 지역의 지질현황을 조사·분석하고, 또한 민원이 첨예한 도로개설 공사장에서 시험발파를 실시하여 이를 토대로 암절취 공법을 선정하여 시공한 사례보고이다. 대전지역의 지질은 선캠브리아기의 변성암류와 변성퇴적암류 및 이를 관입한 심성암류와 중생대 화강암으로 이루어져 있는 복잡한 분포를 이루고 있다. 사례연구 대상 현장은 편상구조가 현저한 관입 편상화강암 및 화강암질 편마암으로 구성되어 있었으며, 시험발파 및 분석결과를 기초로하여 25.5m이내 지역은 HRS 등 무진동 파쇄공법의 적용을 제안하였고, 25.5∼36m 범위의 대부분 지역은 진동제어를 할 수 있는 제어발파공법을 권장하였고, 기타 진동 영향권에서 비교적 안전한 것으로 나타난 지역은 소발파공법을 적용하도록 제안하였다. 제안된 안에 따라 설계를 보완하고 시공한 결과 문제의 발생없이 성공적으로 시공이 완료되었다.

  • PDF

Tunnel Blasting Design Suited to Given Specific Charge (비장약량 맞춤형 터널발파 설계방법)

  • Choi, Byung-Hee;Ryu, Chang-Ha;Jeong, Ju-Hwan
    • Explosives and Blasting
    • /
    • v.27 no.2
    • /
    • pp.33-41
    • /
    • 2009
  • Specific charge, also called powder factor, is defined as the total explosive mass in a blast divided with the total volume or weight of rock to be fragmented. It is a well-known fact that change in explosive consumption per ton or per cubic meter of rock is always a good indication of changed rock conditions. In mining, it is common to use explosive consumption per ton of ore as a measure of the blastability for rock. On the contrary, in civil engineering, it is common to use explosive consumption per cubic meter of rock. In this paper, we adopt the definition of the civil engineering because we are mainly concerned with tunnel blasting. Up to now, although various methods for tunnel blast design have been proposed, there are so many cases in which the proposed methods do not work well. These may be caused by the differences in rock conditions between countries or regions, and can give a serious technical difficulty to a contractor. But if we know the specific charge for a given rock, then the blast design can become much more easier. In this respect, we suggest an algorithm for tunnel blast design that can exactly produce the predetermined specific charge as a result of the design. The algorithm is based on the concept of assigning different fixation factors to various parts of tunnel section, and may be used in combination with the known methods of tunnel blast design.