• Title/Summary/Keyword: 발파분진

Search Result 25, Processing Time 0.031 seconds

암반 발파시의 안전 및 환경공해 대책

  • 안명석
    • Proceedings of the ESK Conference
    • /
    • 1994.04a
    • /
    • pp.106-106
    • /
    • 1994
  • 암반 발파시에는 장약의 선택과 적정량의 산출 여부에 따라 소음, 진동, 분진 및 비석양이 크게 달라진다. 뿐만 아니라, 이들은 안전 및 환경적 공해요인이 된다. 따라서 본 연구는 암반발파시의 안전을 도모하고 환경공해문제를 최소화 하기 위하여, 폭약의 선택 및 취급안전, 암반 발파시의 안전대책, 소음방지대책, 분진방지대책 및 비석방지대책 등에 관한 방안을 제시하고자 한다.

  • PDF

Study on Simulation of Dust Diffusion at Open Pit Mines (노천광산의 발파분진 비산영역 예측에 관한 연구)

  • 김복윤;이상권;조영도;김임호
    • Tunnel and Underground Space
    • /
    • v.8 no.3
    • /
    • pp.194-199
    • /
    • 1998
  • This research was aimed to figure out the trend of dust diffusion at open pit limestone mine for assessing the environmental impacts on the high voltage power transmission line. It is rather easy to assess the dust generation and size distribution of limestone dust at the blasting site, but it is very hard to assess the expected area of dust diffusion and amount of dust fall by the distances from the dust source. In this research, a 3-dimensional fluid dynamic simulation software (3D-Flow) was used for analysing the above mentioned matters to assess the impacts to the insulators on the transmission tower by the blasting dust. It was verfied that the 3D-Flow is reliable tool for simulating dust movement, and the limestone dust is not much hazardous to the power transmission line.

  • PDF

Dust Fall Property of Open Cut Limestone Mine (석회석 노천채광장의 분진 비산특성)

  • 이상권;김복윤;조영도;김임호
    • Explosives and Blasting
    • /
    • v.17 no.2
    • /
    • pp.45-51
    • /
    • 1999
  • To find out the characteristics and trend of dust fall in open cut limestone mine in-situ measurement and wind tunnel tests were carried out. In-siti measurement was done by two dust fall samplers at the Halls mine for 60 days. The laboratory test was done in the 100m long temporary wind tunnel installed at the yard of the institute. The most of dust falled within 25m form the dust source and only less than 0.5% defused up to over 100 meters. It was known that the dust fall at 100m away from souces were negligible.

  • PDF

System Analysis of Dust Concentration at the Field of Tunnel Excavation (터널 굴착시 작업현장의 분진농도 실태조사)

  • Park, Jong-Soon;An, Dae-Hyun;Shim, Myeong-Jin;Jung, Ji-Seung;You, Jin-O;Um, Myeong-Heon;Kim, Jae-Yong
    • Applied Chemistry for Engineering
    • /
    • v.18 no.2
    • /
    • pp.126-129
    • /
    • 2007
  • In order to ruduce traffic-jam, it is requested to extend road. As a result, the construction of tunnels is inevitable considering our mountatinous topography. In tunnel construction work, major contamination materials occur from rock drilling, blasting rock, rock transporting, and short-creat. After rock blasting, a very high concentration of particles over $5000{\mu}g/m^3$ is maintained for 4 h when air is supplied by pans, by which the construction work has to be delayed at least 30 min. Although dry dust collectors are used, the effective operation time span is limited to 3 h. In this work, the behavior of particles in air and use of particle removal instruments are investigated. As a result, it was important to compare efficiencies of dry and hydro dust collectors.

Case Study on the Explosive Demolition of the KOGAS Office Building in Bundang District (한국가스공사 분당사옥 발파해체 시공사례)

  • Kim, Sang-min;Park, Keun-sun;Son, Byung-min;Kim, Ho-jun;Kim, Hee-do;Kim, Gab-soo
    • Explosives and Blasting
    • /
    • v.36 no.4
    • /
    • pp.48-61
    • /
    • 2018
  • This case study is concerned with the project of the explosive demolition for the KOGAS office building located in Bundang district in Seongnam city. Since the office building was a kind of long-span beam structures, a mechanical demolition method using jacking support systems was considered in the beginning of the project. With consideration of the excessive reinforcement cost, uncertainty of safety, and prolonged construction period, however, the original plan was later changed to use an explosive demolition method. For the purpose of protecting nearby buildings and facilities during the collapse process, the explosive initiation sequence was elaborately designed to bring down the building structure towards its front left corner. A total of over 550 electronic detonators (Unitronic 600) was used to sequentially initiate the explosives installed at appropriate columns in the first, second, and fifth floors. To diminish dust production, water bags of small and large sizes were respectively installed at each column and on the floors to be blasted. As such, every effort was exercised to mitigate overall noise, dust, and shock vibrations that could be generated during the explosive demolition process for the office building.

Performance Experiment and Evaluation of Water jet by the Explosives Position in Water-bag blasting using the Mist Guider (분무 가이더를 이용한 워터 백 기폭 시 폭약의 위치에 따른 분사 성능실험 및 평가)

  • Kim, Seung-Jun;Kim, Jung-Gyu;Ko, Young-Hun;Jung, Seung-Won;Baluch, Khaqan;Jin, Guochen;Yang, Hyung-Sik
    • Explosives and Blasting
    • /
    • v.36 no.3
    • /
    • pp.29-38
    • /
    • 2018
  • With the recent industrial developments and economic development nationally, there has been a rapidly increasing demand for the use of underground space as locations for establishing social infrastructure and various convenience facilities. In this study, a mist-control system was developed to reduce the generation of dust in underground blasting. To enhance the dust-reduction effect, a guiding device was developed which is capable of adjusting the direction of the spray toward's the blasting face of mine or tunnel. A numerical analysis was performed by using the AUTODYN software, and results were compared with those published in basic experiments. To verify the mist-diffusion effect according to the position of explosives in a water bag, numerical analyses were conducted for the following cases: Explosives were set in the middle, and in the bottom of the water bag. The optimum condition was external detonation and center charge. The mist particle size from the result was suitable for the reduction of dust after blasting in underground mine and tunnel.

A Study on the Quarrying System by Two-face Rock Blasting and Diamond Wire-saw (양면발파법 및 다이아몬드 와이어쏘를 이용한 채석 시스템 연구)

  • 홍기표;류창하;선우춘;최병희;한공창
    • Explosives and Blasting
    • /
    • v.18 no.3
    • /
    • pp.49-58
    • /
    • 2000
  • 본 논문은 양면발파에 의한 채석기술에서 주로 양면발파 장약패턴 및 다이아몬드 와이어쏘절삭기술에 관한 내용을 중심으로, 현재 각 석재광산에서 시행하고 있는 채석기술과 연구소 에서 시행한 현장 시험발파 결과를 기술한 것이다. 첫째, DA석재광산에서는 제트버너를 이용하여 자유면을 형성하고, 일면발파법과 양면발파법의 작업시간을 비교한 결과 양면 발파할 때에 37%이상의 작업시간 절약효과가 있었으며, 인원은 36%이상의 감소효과가 있었다.둘째, DH석재광산에서는 다이아몬드 와이어쏘를 이용하여 자유면을 형성하고 양면발파 작 업시간과 타 광산에서 일반적으로 사용하고 있는 제트버너에 의한 양면발파 작업시간을 비교하였을 때에 21%이상의 절감효과가 있었고, 작업인원도 21%이상의 감소효과가 있었다. 다이아몬드 와이어쏘를 이용하여 양측면에 자유면을 형성하고 양면 발파하는 채석기술은 소음 및 분진에 의한 환경공해를 방지할 수 있었으며, 작업공정 및 경제성 면에서도 매우 유 리하나 실패시 다른 채석기술에 비해 모암의 손상으로 인한 경제적 손실이 커질 수 있다는 단점도 있으므로 정밀한 발파설계 및 기술이 필요하다.

  • PDF

Experiment and Evaluation of Mist Diffusion from Water Tube for Blasting Dust Control in accordance with the Explosives Position (폭약 기폭위치에 따른 발파 분진제어용 워터튜브 주입수의 분무확산 실험 및 평가)

  • Yang, Hyung-Sik;Ko, Young-Hun;Kim, Jung-Gyu;Noh, You-Song;Park, Hoon;Cho, Sang-Ho
    • Tunnel and Underground Space
    • /
    • v.25 no.1
    • /
    • pp.46-55
    • /
    • 2015
  • A water tube with detonating cord was devised to control the blast dust. Water diffusion experiments with different detonating cord positions were conducted during the series of experiments to optimize the design parameters of the tube. Images from high speed camera were analyzed to evaluate the results. AUTODYN program was adopted to simulate the diffusion process of water and compared with the images. Diffusion of water shows cross flow in case of external charge while the internal case shows radial flow. A bubble ring was formed during the numerical analysis of internal charge case as occurred in underwater blast. An additional bubble ring was formed by the reflection pressure from the ground. And the Weber number was determined as sufficient for spray atomization performance of the water tube.

Case Study of Explosive Demolition for a Structure in Urban Area (Explosive Demolition of Former Sung-Nam City Hall to Construct Sung-Nam City Hospital) (도심지 구조물 발파해체 적용사례 (성남시 의료원 건립을 위한 구성남시청사 발파해체))

  • Jung, Min-Su;Song, Young-Suk;Heo, Eui-Haeng;Kim, Hyo-Jin
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.17-28
    • /
    • 2012
  • Building demolitions at urban area make some inconvenience to neighborhood through generating noises, ground vibrations, and dusts. For this reason, various methods to control such environmental impacts have been being designed and practiced. Among the methods, the use of explosive demolition is rapidly increasing because it can minimize the inconveniency as well as decrease the working time and cost. In this respect, the old Sung-Nam city hall, which was a Rahmen structure comprised of beams, slabs and columns, was decided to be demolished by explosive demolition. This paper shows that explosive demolition can be the most suitable way of removing old buildings eco-friendly, safely, and economically by showing the observation results obtained from the actual demolition operation for the Sung-Nam city hall.

A Case Study of RC Rahmen Structure Explosives Demolition (Focusing Demolition at Chungang Department in Daejeon City) (RC 라멘조 발파해체 적용사례와 기술.경제적 성과분석 -대전 중앙데파트 발파해체사례를 중심으로-)

  • Jung, Min-Su;Song, Young-Suk;Park, Yun-Seok;Heo, Eui-Haeng
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.99-107
    • /
    • 2010
  • Domestic explosive demolition techniques have been developed and applied for low-rise structures up to now. However, the demand for the development of those techniques that can be applied economically, safely and environment-friendly rapidly increases because the old high-rise RC rahmen structures that were built since around 1970s are now required to rebuild. As a result, element technologies of explosive demolition for low-rise structures were applied to take advantage of technology in high-rise structures that performed application testing at Chungang Department demolition field in Daejeon city. It could judge elements technology establishment for high-rise structure demolition and field application and suggest the improvements when the problems occurred to develop High-rise building demolition techniques for method of protection a field test and the dust reduction test. The water cannon test was applied to reduce the dust site and the drilling tests are performed to select the best components for explosives demolition elements techniques of the reliability. This paper shows that we have the ability to remove a high-rise building using environmentally friendly safe and economical explosives demolition method. It would contribute to prevent a foreign company from entering the domestic market and should contribute to acquire competitiveness of domestic demolition industry.