A Study on the Selection Method of Construction Management based on Public Construction Projects (공공건설사업의 건설사업관리방식 선정 방법에 관한 연구)

  • Kim, Kwan-Su;Park, Hyung-Keun;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.65-73
    • /
    • 2013
  • Even though the construction management (CM) system was introduced for the purpose of increasing the efficiency of the domestic construction industry along with the establishment of construction industry fundamental laws in December of 1996, now it is very difficult that the public institutions can judge their application of construction management methods due to the lack of clear guidelines or directions to select construction management methods when the public institutions were executing public construction projects. Therefore, this study was executed to prepare for the selection criteria which could be referred in reviewing the application of construction management ordering methods according to public institution's competences and project characteristics. It is expected that future domestic demand of construction management will be gradually increasing both in public and private construction sectors. However under the current construction management systems, it is judged to be difficult that the construction projects that apply the construction management methods will be activated with full-scale. Therefore, it could be said that active efforts in domestic sectors are required in order that the construction management systems of developed countries levels could be activated. Additionally in order to vitalize the construction management systems, it is expected that public institutions could use this study results as the review data for feasibility of construction projects for the consignment of construction management in selecting the ordering methods.

A Model for Predicting Management Costs of the Multiple Prime Contract (분리발주 방식의 관리비용 예측 모델)

  • Kim, Kihyun;Kim, Kyungrai;Park, Wansoo;Lee, Eunjae;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.44-52
    • /
    • 2014
  • On March, 2013, the Government announced the Multiple Prime Contract method will be expanded in public building construction projects. The applying multiple prime contract method has been immersing issue among all stakeholders of construction project. The owner conducts the role of a general contactor as well as owner's original responsibility while construction works being executed by specialty contractors. If the owner has not experience of project management, it should be bring about increasing management cost due to the interface problems among prime contractors. With this reason, it is difficult to administrate the multiple prime contract. So far there has been no methodology of predicting management cost in the multiple prime contract. Therefore, this study aims to enable the operation of efficient multiple prime contracts by developing a model to predict their management costs.

A Study for Multi-items Ordering Model with transportation on the Depot System (데포시스템에서의 수송조건을 고려한 다품종발주모델에 관한 연구)

  • Beum-Jun Ahn
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.3 no.2
    • /
    • pp.120-125
    • /
    • 2002
  • In this paper, we propose a new ordering model for the mixed parts transportation problem with multi-items based on the depot system. Order scale are used as decision parameters instead of order point for ordering multi-items. Finally we test the model with simple example and show computational result that verifies the effectiveness of the model.

  • PDF

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

Commissioning Model for CM Services Considering Project and owner Properties (프로젝트 및 발주자 특성을 고려한 CM업무 위탁모델)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.632-636
    • /
    • 2007
  • These days, Construction industries are getting bigger, more specialized and complicated. Accordingly, the items of management is increased, also owner's organization is reduced. For this reason, various a method of construction management is introduced in the domestic construction industry. But introduction of construction management have caused increase cost because role duplication of managers. This role duplication is caused by confusion of trial and error, irrationality of system. And every construction project have peculiar properties, also owner's organization of project have various properties. This various properties is not reflected in the construction management , and the regimental method of construction management applied. In order to solving these problems, this study suggested the commissioning model for CM service reflected the properties of project and owner. This study have to selection of the critical service, service item of construction management and definition of owner's role through analysis of the properties of project, owner's capacity and requirement.

  • PDF

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

A Decision Support Model for Optimal Delivery of Public Construction Projects (공공건설사업의 최적 발주방식 선정을 위한 의사결정지원모델)

  • Park, Heetaek;Park, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.22-34
    • /
    • 2016
  • The Project Delivery System (PDS) is used in mixed way without clear classification from tendering system and the standard itself that can be selected is set with project budget or estimated cost only. Essentially, the PDS should consider and reflect project characteristics and types, internal and external factors for the purpose of improving the lives of citizens and their welfare. However, the current status is not operated flexibly due to the given budget, period and uniform laws and regulations. In order to solve this problem, this study suggests a Decision Support Model to select the optimal PDS for public construction projects. The current problem of the PDS for public construction projects were identified and the application of a decision support model was proposed. Subsequently a decision-making model was suggested for each PDS using the identified factors and linear discriminant function of discriminant analysis. An additional questionnaire survey and actual practical case analysis were carried out to verify the effectiveness and applicability of the model to actual work. It can be used by adjusting the decision support model and detailed factors according to the specific characteristics of public organization, ability of person in charge and project type.

Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.

A Study on Method Activation of Construction Management through Investigation of Public Owners' Capability level (공공부문의 발주자 역량 수준 조사를 통한 건설사업관리 활성화 방안 연구)

  • Kim, Sun-Sik;Kim, Ju-Hyun;Lee, Yun-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.289-294
    • /
    • 2007
  • It has been 10 years Since December 1996 when CM method was institutionalized by Construction Industry Fundamental law. Even though construction market has been in stagnant of business activities till now, CM in Korea started to be activated by the introduction of CM method i.n public construction. In the end of 2005, the number of CM order's contract is 6.7 times , an amount of CM order's money is 9.2 times more than operation plan of CM system announced in 2001. Therefore, CM market has been dramatically growing. However, it is judged that the shortage of faith in CM project and necessity of CM method are not recognized and study on a owner who affects successful settlement of CM has not been performed. When considering those points, in introduction and practical use of CM, CM is suggested to the field which is necessary for a client through the task performance level research and analysis of a owner who act a important role to activate Construction Management. As result of studying pre-existing papers to i.nvestigate of owner's capability level, the task function of a client is classified into 10 types and a public opinion poll was performed based on the 10 types of function.

  • PDF

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.