• Title/Summary/Keyword: 발주 및 입.낙찰

Search Result 13, Processing Time 0.023 seconds

The Problem Analysis and Improvement Plans to the Bidding System of Construction Works (건설공사 입 ${\cdot}$ 낙찰제도의 문제점 및 개선방안;대한주택공사의 발주공사를 중심으로)

  • Jeong, Jin-Pal;Park, Moon-Sun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.704-709
    • /
    • 2007
  • The purpose of this study is to present both problems and improvement plans on the bidding system of the Korea National Housing Corporation, which orders apartment houses professionally. For data gathering, this study used data from electronic procurement system from 2001 to 2005. The research method of this study is to analyze the data categorized into four types: changes of ordering and contract price ration, the lowest-pricing bidding system, and permanent projects by grades. As a result of the analysis, the amount of ordering is biased in favor of particular level. Finally, this study present following improvement plans: 1) screening system and the lowest-pricing bidding system need to be supplemented, 2) the contract price ratio and the amount of ordering should be controlled, and 3) the improvement of PQ and the introduction of the list of Qualified companies by types need to be presented.

  • PDF

Improvement of Architecture-Engineering Service Procurement System for Public Construction Project (건설기술용역 발주 및 입·낙찰 방식의 문제점 및 개선방안)

  • Kim, Sung-Il;Chang, Chul-Ki;Park, Dae-Keun;Bae, Yu-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.61-70
    • /
    • 2014
  • Various procurement systems for Architecture-Engineering service for public construction project are currently established by construction-related law. However, comprehensive framework and criteria for the selection of Architecture-Engineering firm are in absence. Even though various selection methods for Architecture-Engineering service are currently established by law, cost-based selection method is mainly used in selecting Architecture-Engineering firm for the service. This paper examined current use of procurement system for Architecture-Engineering service and drew problems in practice. Through analysis of problems and bench-marking of those systems in advanced countries and international organizations, several strategies to improve performance of Architecture-Engineering service and to maximize the efficiency were suggested. The suggestions include framework and guideline to select a procurement method for the service which is being considered for the project and way of improving current procurement system. These suggestions will be a foundation for utilizing appropriate procurement system for the specific project and can make domestic Architecture-Engineering firm more competitive in the global market by breaking form the cost-based selection method in the selection of Architecture-Engineering firms.

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

법령과 고시 - 분리발주 허용 대상 구체화, 발주기관 재량권 대폭 인정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.281
    • /
    • pp.45-50
    • /
    • 2013
  • 기획재정부는 공사의 분할 분리발주 관련규정 등을 정비하고 최저가낙찰제 확대유예 등의 내용을 담은 국가계약법 시행령 개정안을 지난 11월 8일 입법예고 했다. 이 법안은 20일 동안 업계 의견을 수렴한 후 법령안 심사 및 차관 국무회의 등을 거쳐 공포될 예정이다. 이번 국가계약법 시행령 개정안은 그동안 대한설비건설협회가 전사적으로 추진해 온 분리발주 법제화와 최저가낙찰제 연기 방안을 담고 있어 건설업계의 관심이 집중되고 있다. 분할 분리발주 규정은 분리발주가 보다 활성화 될 수 있도록 대상을 구체화했으며, 사업의 계획단계부터 분리발주 가능 여부를 판단토록 개선됐다. 또한 300억 이상에서 100억 이상으로 확대될 예정이던 최저가낙찰제 확대 방안은 오는 2015년까지 2년간 유예되고 최저가낙찰제 대체 방안으로 종합심사제가 제안되는 등 정부의 입 낙찰제도 개선 방향의 가닥이 잡혔다.

  • PDF

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

A Study on International Engineering Market Focusing on Engineering/Consulting Delivery System (엔지니어링 해외진출 활성화를 위한 유망국가 분석 - 시장 현황 및 입낙찰 절차를 중심으로 -)

  • Kim, Sang-Bum;Kwak, Hyun-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.171-183
    • /
    • 2013
  • Domestric Construction & Engineering market has been long in recession due to the global economic crisis. Domestic construction industries consequently looks at overseas construction markets where relatively more construction projects are constantly required. In order to provide meaningful information for Korean engineering companies to keep the pace with the changes in the construction industry, various construction related date and statistics are analyzed. In addition, previous research from the related organizations and construction engineering companies are closely reviewed. Investigation of preliminary data and research have been conducted to draw remedies for their overseas expansion. Moreover, it is attempted to classify foreign markets as the Asia, Africa and etc. (Europe, North America/the Pacific and Latin America) to provide the list of first target countries and its regional market information focusing on their bidding system. This study had tried to show comparative analysis of different bidding procedures between Korea and the selected countries to suggest measures of improvements for the domestic bidding system. Finally, this study suggested policy recommendations to meet the requirement of bid qualification to advance the global market that was suggested with validated clustering bidding data.

A Decision Support Model for Optimal Delivery of Public Construction Projects (공공건설사업의 최적 발주방식 선정을 위한 의사결정지원모델)

  • Park, Heetaek;Park, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.22-34
    • /
    • 2016
  • The Project Delivery System (PDS) is used in mixed way without clear classification from tendering system and the standard itself that can be selected is set with project budget or estimated cost only. Essentially, the PDS should consider and reflect project characteristics and types, internal and external factors for the purpose of improving the lives of citizens and their welfare. However, the current status is not operated flexibly due to the given budget, period and uniform laws and regulations. In order to solve this problem, this study suggests a Decision Support Model to select the optimal PDS for public construction projects. The current problem of the PDS for public construction projects were identified and the application of a decision support model was proposed. Subsequently a decision-making model was suggested for each PDS using the identified factors and linear discriminant function of discriminant analysis. An additional questionnaire survey and actual practical case analysis were carried out to verify the effectiveness and applicability of the model to actual work. It can be used by adjusting the decision support model and detailed factors according to the specific characteristics of public organization, ability of person in charge and project type.

The Corresponding Plan for Integrated Environment-the Lowest Cost Bid and The Current Cost Estimate System (최저가입찰제 및 실적공사비적산 환경에서의 대응방안)

  • Kim, Byeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.849-859
    • /
    • 2006
  • Earnings of domestic enterprises are expected a serious damage because the lowest cost bid system and the current cost estimate system. In 2005 average successful bid rate for the lowest cost bid project is below 60%, this is not reach at the operating budget of enterprise. Many problems such as illegal construction, low price subcontract, chain enterprise loss com in to practice because of low successful bid rate. In addition earnings of the enterprises expected to be the minimum, because of enlarge execution of the current cost estimate system. This study tries to lend assistance by giving alternative for the construction enterprise by presenting the bid system, investigate and compare foreign system with domestic and analyze correlation of the lowest cost bid and the current cost estimate system.

Effects of the Methods for Generating and Selecting Multiple Preliminary Prices on Budget Prices in Bidding Processes (복수예비가격 생성 및 추첨방법이 예정가격에 미치는 영향)

  • Kang, Minseok;Riew, Moon Charn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.89-97
    • /
    • 2015
  • In bidding processes conducted by government agencies, local governments or public agencies, budget prices are critical to both ordering bodies and bidders since budget prices are bases for selecting a successful bidder. Since a high budget price goes against ordering bodies and a low one goes against bidders, most ordering bodies adopt a system using multiple preliminary prices for determining a budget price to ensure fair and transparent manners. Discussed are how budget prices change depending on the methods of sampling 15 preliminary prices and the methods of sampling 4 out of 15 prices. Computer simulation is conducted to analyze budget prices for various methods to determine multiple preliminary prices. It is more likely for budget prices to be close to base prices when splitting a range of generating preliminary prices into 15 intervals and taking 4 preliminary prices from 15 intervals than when taking 4 preliminary prices from a whole range. In cases when splitting a range of generating preliminary prices, if we take 2 preliminary prices out of intervals above 100% and take 2 out of intervals below 100%, the expected budget prices are equal to a base price and the standard deviations are about half in comparison with those when taking 4 out of 15 intervals.

A Study on the Application Scheme of the Warranty delivery system in Domestic Private Finance Initiative (국내 민간투자사업의 성능발주제도 도입에 관한 연구)

  • Kim, Dae-Kil;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.527-530
    • /
    • 2007
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in France, United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. In addition to, domestic constructions have been meeting with international competition because of the open BOT market from FTA. Finally, this study proposed new warranty delivery system model in PFI on considering domestic status by benchmarking the delivery process and the characteristics of the warranty contract which is applied to PFI of global.

  • PDF