• Title/Summary/Keyword: 발전용댐

Search Result 31, Processing Time 0.029 seconds

Evaluation of hydropower dam water supply capacity (II): estimation of water supply yield range of hydropower dams considering probabilistic inflow (발전용댐 이수능력 평가 연구(II): 확률론적 유입량을 고려한 발전용댐 용수공급능력 범위 산정)

  • Jeong, Gimoon;Kang, Doosun;Kim, Dong Hyun;Lee, Seung Oh;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.515-529
    • /
    • 2022
  • Identifying the available water resources amount is an essential process in establishing a sustainable water resources management plan. Dam facility is a major infrastructure storing and supplying water during the dry season, and the water supply yield of the dam varies depending on dam inflow conditions or operation rule. In South Korea, water supply yield of dam is calculated by reservoir simulation based on observed historical dam inflow data. However, the water supply capacity of a dam can be underestimated or overestimated depending on the existence of historical drought events during the simulation period. In this study, probabilistic inflow data was generated and used to estimate the appropriate range of the water supply yield of hydropower dams. That is, a method for estimating the probabilistic dam inflow that fluctuates according to climatic and socio-economic conditions and the range of water supply yield for hydropower dams was presented, and applied to hydropower dams located in the Han river in South Korea. It is expected that the understanding water supply yield of the hydropower dams will become more important to respond to climate change in the future, and this study will contribute to national water resources management planning by providing potential range of water supply yield of hydropower dams.

Proposal of Performance Evaluation Methodology for Hydropower Reservoirs with Resilience Index (회복탄력성을 고려한 발전용댐의 성능평가 방법론 제안)

  • Kim, Dong Hyun;Yoo, Hyung Ju;Shin, Hong-Joon;Lee, Seung Oh
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.1
    • /
    • pp.47-56
    • /
    • 2022
  • Recently, water resources and energy policies such as integrated water management and carbon neutrality are changing rapidly. There is an opinion that the value of hydropower reservoirs related to these policies should be re-evaluated. In the past, they have contributed to flood control in addition to electricity generation, such as operating at a limited water level during the flood season, but loss of power generation is inevitable with this operation. Therefore, this study introduced the concept of resilience to the hydropower generation system to minimize the power loss. A framework for evaluating the power generation performance of them was presented by defining the maximization of electricity sales as performance. Based on the current procedure of multiple operation plan, a scenario was established and simulation was performed using HEC-5. As a result of applying to the framework, it was confirmed that the power generation performance according to each scenario was evaluated as an important factor. And it was confirmed that the performance of flood control and water use could also be evaluated.

Development of Optimization Model for Long-term Operation Planning of the Hydropower Reservoirs in Han River Basin (한강수계 발전용댐 장기 운영계획 수립을 위한 최적화 모형 구축)

  • Lee, Eunkyung;Ji, Jungwon;Yi, Jaeeung
    • Journal of Wetlands Research
    • /
    • v.21 no.spc
    • /
    • pp.69-79
    • /
    • 2019
  • In Korea, more than 60% of the whole lands are mountainous area. Since many decades ago, hydroelectric power plants have been constructed and eco-friendly energy has been produced. Hydropower can cope with the rapidly changing energy supply and demand, and produce eco-friendly energy. However, when the reservoir is built, it is often inevitable to damage the environment due to construction of large structure. In this study, the optimal reservoir operation model was developed to maximize power generation by monthly operation for long-term operation planning. The dam operation model was developed using the linear programming which is widely used in the optimal resources allocation problems. And the reservoir operation model can establish monthly operation plan for 1 year. Linear programming requires both object function and constraints to be linear. However, since the power generation equation is nonlinear, it is linearized using the Taylor Expansion technique. The optimization results were compared with the 2009-2018 historical data of five hydropower reservoirs. As a result, the total optimal generation is about 10~37% higher than the historical generation.

Water supply contribution of multipurpose utilization of the Hwacheon Reservoir in the Han River basin (화천댐의 다목적 활용에 따른 한강수계 용수공급 기여도 산정 방안 수립)

  • Yoon, Jeongin;Lee, Eunkyung;Ji, Jungwon;Yi, Jaeeung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.191-191
    • /
    • 2022
  • 우리나라 강우는 대부분 여름에 편중되어 수자원 이용의 불확실성이 크기 때문에 댐과 같은 수공구조물을 활용하여 대응하고 있다. 기존 수도권의 용수공급은 한강수계 다목적댐들을 활용하여 충족시켰으나 기후변화에 따른 이상가뭄, 용수 수요 증가 등에 의해 미래 용수부족이 전망된다. 수도권의 안정적인 용수공급을 위해 환경부와 한국수력원자력(주)는 2020년 4월에 우리나라 최초로 기 건설된 발전용댐을 다목적화하는 『한강수계 발전용댐 다목적 활용 협약』을 체결하였다. 협약에 따라 화천댐은 시범운영기간 동안 기본계획 공급량 22.2 m3/sec (연간 7억 톤)를 상시 공급하고 있다. 따라서, 본 연구에서는 팔당댐에 기여하는 화천댐의 용수공급량을 산정하여 용수공급 효과를 검증하였다. 화천댐 용수공급 기여도를 정량적으로 제시하기 위해 HEC-ResSim을 활용하여 시범운영기간 운영 결과와 유사한 한강수계 댐 운영 모형을 구축하였다. 또한, 시범운영 기간 화천댐과 다목적댐들의 팔당댐 용수공급 기여도를 정량적으로 제시하는 방안을 구축하였다. 시범운영이 수행됨에 따라 발전용댐의 다목적 활용 효과를 정량적으로 평가하는 방안 구축으로발전용댐의 용수공급 효과를 검증할 수 있을 것으로 기대된다.

  • PDF

A Study on Drainage Capability of Large Capacity Outlet and Spillway of Dams in Korea (한국댐의 대용량 배수시설 및 Spillway 배수능력에 관한 조사연구)

  • 이원환
    • Water for future
    • /
    • v.11 no.2
    • /
    • pp.43-53
    • /
    • 1978
  • Synopsis: This study has systemized the results of construction and classification with 656 large dams in Korea which were defined in ICOLD provision. Especially, checking up the drainage capability of large capacity outlets and its of spillway, this paper suggests the planning of outflow discharge with large capacity outlets and spillway in future. The results of this study are following as; 1. The classification by purposes in Korea shows that irrigation dams are 94% in rate(607 dams), jydropower and multipurpose dams are 2% (14 dams), municipal and industrial water supply dams are 4% (26 dams). 2. In design of proposed outflow discharge, spillways of irrigation dams were selected outflow discharge on 100 years return period, those of municipal and industrial water supply dmas 200 years and those of hydropower and multipurpose dams 500 years or 1000 years. 3. Emergency spillway should be considered in the fields of disaster prevention engineering and the rank of return periods for the emergency proposed out flow discharge was suggested. 4. Some of problems are suggested for this subject in future.

  • PDF

Effect of the multipurpose utilization of the Hwacheon Reservoir on water supply and downstream in the metropolitan area (화천댐의 다목적 활용이 수도권 용수공급 및 하류에 미치는 영향)

  • Jeongin Yoon;Eunkyung Lee;Jungwon Ji;Jaeeung Yi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.430-430
    • /
    • 2023
  • 2020년 4월, 기후변화로 발생하는 가뭄과 수도권 용수 수요 증가에 대비하기 위해 기 운영중인 발전용댐을 수도권 용수공급의 수원으로 활용하는 『한강수계 발전용댐 다목적 활용 협약』이 체결되었다. 이에 따라, 화천댐은 발전뿐만 아니라 용수공급을 목적으로 22.2 m3/sec를 상시 공급하는 운영을 수행하고 있다. 본 연구에서는 화천댐의 용수공급 효과 분석을 위해 화천댐의 수도권 용수공급 기여도와 상시 용수공급에 따른 화천댐 하류의 유황 및 수질의 변화를 분석하였다. 화천댐의 수도권 용수공급 기여도 분석을 위해 한강수계 댐 운영 모형을 구축하였다. 모의 운영 결과를 활용하여 팔당댐 유입량 중 화천댐, 소양강댐, 충주댐의 방류량과 자연유량이 차지하는 정도를 산정하여 용수공급 기여도로 제시하였다. 또한, 화천댐의 상시 용수공급이 하류에 미치는 영향을 분석하였다. 시범운영 전후 화천댐의 무방류일을 비교하였으며 하류 변화를 분석하는 요소로 유황과 수질을 선정하고 시범운영 전후 화천댐 하류의 유황과 수질을 비교 및 분석하였다. 화천댐 용수공급의 양적 기여도 및 하류의 유황 안정성 분석과 하류 수질 개선 변화 등을 분석함에 따라 화천댐의 용수공급 효과를 다방면에서 검증할 수 있을 것으로 기대된다.

  • PDF

Change of maintenance flow discharge in Seomjin river basin (섬진강유역 하천유지유량 변화)

  • Jung, Jae Sung;Jo, Min Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.502-505
    • /
    • 2016
  • 섬진강 유역에서 하천유지유량에 영향을 미치는 주요댐은 다목적댐 2개소, 발전용댐 1개소, 생공용수전용댐 1개소, 농업용댐 2개소로 총 6개소가 있고, 섬진강남해수계의 수어댐은 섬진강 하구 일부구간을 제외하면 하천유지유량 변화에는 영향을 미치지 않는다. 섬진강 유역에서 2005년까지 고시된 하천유지유량은 1979년 섬진강 송정지점 염해방지 필요수량 5.5cms만 있었고, 1990년 공고에서는 섬진강 2개 지점에 대한 평균 및 기준 갈수량을 제시하고 별도의 하천유지유량을 고시하지는 않았다. 익산지방국토관리청(1999)에서 하천유지유량이 하천법 제20조의 법적근거를 가지고 영산강 섬진강 수계 전반에 걸쳐 총 23개 지점에서 산정하였다. 동일한 하천유지유량이 2006년에 고시되어 2016년 현재까지 법적 효력을 가지고 있다. 국토해양부(2011)에서 하천수질과 생태계를 고려한 하천유지유량을 다시 산정하였는데, 이는 1979년과 2006년 고시유량보다 더 큰 값이다.

  • PDF

Study on the investigation of river disturbance in Korea (하천교란의 실태조사 연구)

  • Jang, Chang-Lae;Kim, Joon-Tae;Lee, Kwang-Man
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.946-950
    • /
    • 2007
  • 본 연구에서는 우리나라 하천의 교란에 영향을 미치는 인위적인 교란의 원인이 되는 하천정비현황, 수리구조물의 설치, 댐의 건설현황, 골재채취 현황 등에 대하여 실태조사를 하여 분석하였다. 국가하천은 하천연장 $3,260.75km^2$, 개수율 94.81%이며, 지방1급 하천은 하천연장 $1,178.87km^2$, 개수율 95.76%이다. 또한 지방2급 하천은 하천연장 $25,795.85km^2$, 개수율 57.31%로 나타내었다. 국내 보의 현황은 전국적으로 14,364개소가 하천에 설치되어 있으며, 2.1km마다 1개의 보가 설치되어 있다. 시도별로 강원도가 가장 많은 3,463개소로 1.1km마다 보가 설치되어 있으며 다음으로 충북(1.2km/보), 전남(1.9km/보) 순으로 나타났다. 국내의 댐은 약 18,000개소로서 대댐 기준인 댐 높이 15m 이상, 저수량 300만 $m^3$ 이상의 댐은 1,215개소이며, 다목적댐 15개소, 발전댐 21개소, 홍수조절용댐이 1개소가 축조되어 있으며, 댐의 개소수로는 농업용댐이 가장 많이 건설되었다. 유역별로는 낙동강 수계가 가장 많이 건설되었으며, 한강, 금강 수계 순이다. 또한 다목적댐은 낙동강유역에 많이 건설되어 있으며 발전용댐은 한강유역에 가장 많이 건설되었다. 수계별 다목적댐과 발전용댐이 유역에 차지하는 비율로는 한강수계가 83%로 가장 많이 차지하고 있으며, 섬진강, 금강, 낙동강 순이었다. 행정구역별 골재채취 허가량은 경북, 경남, 대구, 부산 순으로 많으며, 특히 낙동강 유역에서 지속적으로 많은 양의 골재채취가 이루어져 왔다. 그 다음으로 금강 수계, 특히 충남에서 많은 골재채취가 이루어졌다. 연도별 골재채취 허가량은 1997년 이후로 지속적으로 감소되고 있다.게 될 것이다. 본 연구에서는 현재 진행중인 승기천 오염하천 정화사업이 종료되는 시점을 기준으로 남동유수지에 대해 승기천과 연계한 유수지의 환경개선 방법을 제안하였다. 준설을 통해 유수지의 근본적인 오염원을 제거하고 남동유수지 유입부에 인공습지와 수처리설비를 설치하여 유수지의 수질을 개선하고 개선된 수질이 3급수로 유지하도록 하였으며, 설치된 인공습지에는 철새도래지를 조성하여 유수지 유입수인 철새가 날아드는 하천인 승기천의 테마와 연계하도록 하였다. 인공습지 주변으로 식생호안을 설치하고 유수지 주변에는 산책로를 설치하여 지역주민들의 친환경 수변공간으로 활용하도록 하였다. 1유수지와 연결된 2유수지는 BTL사업을 통해 주변공단으로부터의 오폐수를 원천적으로 차단하도록 하였으며 2유수지를 매립하여 지하는 강우시 유출수 저류가 가능한 화물차주차장으로 활용하고 지상은 녹지공간으로 조성하여 공단근로자 및 지역주민을 위한 휴식공간으로 활용될 수 있도록 제안하였다. 본 연구는 남동유수지 환경 개선 사업 실행을 위한 정책 연구로 연구결과를 인천시가 적극 수용하기로 결정함에 따라 인천시의 환경 현안 문제인 남동유수지의 수질개선을 통해 시민의 휴식 및 여가선용 공간으로 활용하기 위한 사업의 기초자료로 활용되며 이미 설계검토가 시작되었다. 본 연구결과는 유수지 및 저수지의 환경개선 사업의 선두적인 성공사례로 국내 타 지역의 유사한 사업에 있어 벤치마킹을 할 수 있는 훌륭한 사례가 될 것이다.요 생산이 증가하자 군신의 변별(辨別)과 사치를 이유로 강력하게 규제하여 백자의 확대와 발전에 걸림돌이 되었다. 둘째, 동기(銅器)의 대체품으로 자기를 만들어 충당해야할 강제성 당위성 상실로 인한 자기수요 감소를 초래하였을 것으로 사료된다. 셋째, 경기도 광주에서 백자관요가 운영되었으므로 지방인 상주지역에도 더 이상 백자를 조달받을 필요가 없이,

  • PDF

Estimating optimal flood of the hydroelectric dams on the Bukhangang River (북한강 수계 수력발전댐의 최적설계홍수량 추정)

  • Kim, Sang Ug;Choi, Kwang Bae;Seo, Dong Il;Cheon, Young Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.286-286
    • /
    • 2022
  • 홍수피해를 최소화하기 위한 수공구조물의 적정 규모 결정을 위해 사용되는 홍수빈도분석에는 통계적 분석절차에 따른 불확실성이 포함된다. 따라서 불확실성이 포함된 범주 내에서 가장 적절한 설계홍수량(design flood)를 결정하는 과정은 수공구조물의 최종단계에서 중요하게 다루어져야 하는 부분이나 이를 제시한 연구는 많지 않다. 비용-편익 분석기법을 홍수빈도분석 절차에 도입하여 구성되는 총 기대비용함수(total expected cost function)는 설계홍수량 중 최적 설계홍수량(optimal design flood)를 결정하기 위한 새로운 접근방식이다. 이 절차는 UNCODE(UNcertainty COmpliant DEsign)로 명명되어 사용된 바 있으나, 국내에서는 아직 적용 결과가 소개되지 않고 있다. 따라서 본 연구에서는 UNCODE의 수학적 구성 절차를 소개함과 함께 북한강수계에 위치한 수력발전댐(화천댐, 춘천댐, 의암댐, 청평댐)의 년최대유입량을 사용하여 최적 설계홍수량을 산정하고 이 결과를 기존 홍수빈도분석 결과와 비교하였다. 불확실성이 고려된 총 기대비용함수로부터 확률분포함수들(Gumbel 및 GEV)의 모수를 추출하는 과정에서 Metropolis-Hastings 알고리즘을 사용하여 불확실성의 범위를 추정하였으며, 비용-편익 분석기법에 사용되는 비용 및 피해함수는 수학적 구성의 편의성을 위하여 1차 선형함수로 가정되었다. 4개의 발전용댐, 2개의 확률분포 및 2개의 재현기간에 대하여 최적 설계홍수량의 중앙값이 기존 홍수빈도분석 절차에 의해 산정된 설계홍수량보다 일정 정도 큰 값으로 산정됨을 알 수 있었다. 향후에는 본 연구에서 적용된 절차를 간단한 수식형태로 함수화하여 발전용댐 운영의 실무업무나 하천기본계획의 수립 등에 있어 비용-편익분석 기법의 적용성을 높이기 위한 연구가 진행될 필요가 있을 것으로 판단된다.

  • PDF