• Title/Summary/Keyword: 반복적 설계 과정

Search Result 397, Processing Time 0.029 seconds

Design and Implementation of Clipcast Service via Terrestrial DMB (지상파 DMB를 이용한 클립캐스트 서비스 설계 및 구현)

  • Cho, Suk-Hyun;Seo, Jong-Soo
    • Journal of Broadcast Engineering
    • /
    • v.16 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Design and Implementation of Clipcast Service via Terrestrial DMB This paper outlines the system design and the implementation process of clipcast service that can send clips of video, mp3, text, images, etc. to terrestrial DMB terminals. To provide clipcast service in terrestrial DMB, a separate data channel needs to be allocated and this requires changes in the existing bandwidth allocation. Clipcast contents can be sent after midnight at around 3 to 4 AM, when terrestrial DMB viewship is low. If the video service bit rate is lowered to 352 Kbps and the TPEG service band is fully used, then 320 Kbps bit rate can be allocated to clipcast. To enable clipcast service, the terminals' DMB program must be executed, and this can be done through SMS and EPG. Clipcast service applies MOT protocol to transmit multimedia objects, and transmits twice in carousel format for stable transmission of files. Therefore, 72Mbyte data can be transmitted in one hour, which corresponds to about 20 minutes of full motion video service at 500Kbps data rate. When running the clip transmitted through terrestrial DMB data channel, information regarding the length of each clip is received through communication with the CMS(Content Management Server), then error-free files are displayed. The clips can be provided to the users as preview contents of the complete VOD contents. In order to use the complete content, the user needs to access the URL allocated for that specific content and download the content by completing a billing process. This paper suggests the design and implementation of terrestrial DMB system to provide clipcast service, which enables file download services as provided in MediaFLO, DVB-H, and the other mobile broadcasting systems. Unlike the other mobile broadcasting systems, the proposed system applies more reliable SMS method to activate the DMB terminals for highly stable clipcast service. This allows hybrid, i.e, both SMS and EPG activations of terminals for clipcast services.

Deriving Key Risk Sub-Clauses which the Engineer of FIDIC Red Book Shall Agree or Determine according to Sub-Clause 3.7 -based on FIDIC Conditions of Contract for Construction, Second Edition 2017- (FIDIC Red Book의 Engineer가 합의 또는 결정해야할 핵심 리스크 세부조항 도출 -FIDIC Red Book 2017년 개정판 기준으로-)

  • Jei, Jae Yong;Hong, Seong Yeoll;Seo, Sung Chul;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.239-247
    • /
    • 2023
  • The FIDIC Red Book is an international standard contract condition in which the Employer designs and the Contractor performs the construction. The Engineer of FIDIC Red Book shall agree or determine any matter or Claim in accordance with Sub-Clause 3.7 neutrally, not as an agent of the Employer. This study aimed to derive Key Risk Sub-Clauses out of 49 Sub-Clauses that the Engineer of FIDIC Red Book recently revised in 18 years shall agree or determine according to Sub-Clause 3.7 using the Delphi method. A panel of 35 experts with more than 10 years of experience and expertise in international construction contracts was formed, and through total three Delphi surveys, errors and biases were prevented in the judgment process to improve reliability. As for the research method, 49 Sub-Clauses that engineers shall agree on or determine according to Sub-Clause 3.7 of the FIDIC Red Book were investigated through the analysis of contract conditions. In order to evaluate the probability and impact of contractual risk for each 49 Sub-Clause, the Delphi survey conducted repeatedly a closed-type survey three times on a Likert 10-point scale. The results of the first Delphi survey were delivered during the second survey, and the results of the second survey were delivered to the third survey, which was re-evaluated in the direction of increasing the consensus of experts' opinions. The reliability of the Delphi 3rd survey results was verified with the COV value of the coefficient of variation. The PI Risk Matrix was applied to the average value of risk probability and impact of each of the 49 Sub-Clauses and finally, 9 Key Risk Sub-Clauses that fell within the extreme risk range were derived.

Study on the Planning Method of the Sacheonwangsa Temple Architecture in Silla (신라사천왕사건축(新羅四天王寺建築)의 설계기술(設計技術) 고찰(考察))

  • Lee, Jeongmin;Mizoguchi, Akinori
    • Korean Journal of Heritage: History & Science
    • /
    • v.53 no.3
    • /
    • pp.80-109
    • /
    • 2020
  • The Sacheonwangsa Temple in Silla is an esoteric temple that was founded provisionally in 670, and was completed in 679. This study attempted to elucidate the planning method of the Sacheonwangsa Temple based on the results of research on excavations and investigations into its construction processes and construction measures thereof. The research results are as follows. (1) In the site construction, assuming the size of one Bang (坊) on the south of Nangsan Mountain, after dividing the north-south width into three equal parts, there is a possibility that two of these parts were set to the flat portion. (2) In the 'Jochang (祖創, 670)', it is estimated that an area of 300 cheoks by 300 cheoks was postulated on the flat surface, and, as an initial conception, the mandala's plane design of the outer square 2 hasta (3 cheoks) and inner square 1 hasta (1.5 cheoks) was originally devised for the setting of 'Mudra (神印)', and an area 100 times greater has been set as the basis in the scale and layout planning of the central block. (3) During 'Gaechang (攺刱, ~679)', it is judged that because of the narrowness of the distance between the Pagoda and Geumdang Hall, which occurs when the center of the Geumdang Hall coincides with the center of 'the first stage of the foundation (先築基壇)', the scale and layout planning were adjusted from the initial conception. (4) The arrangement of the building was determined by dividing the fixed size of the central block (280 cheoks by 320 cheoks). Specifically, the east-west direction is set on the quartile's line of the east-west width of the central block, and in contrast, the north-south direction is based on the structural characteristics of the central block. It is presumed that the position of the transept was determined through the division and adjustment of the column spacing of the east-west corridor, then the Geumdang Hall and Altar were based on this. (5) The scale of the Geumdang Hall and Pagoda is determined by the petition of the division by the unit fraction starting from the quartile's line of the central block's east-west width. This planning is understood to be based on the self-similarity, which is rooted in the mandala's plane design as the model.

A Study on the Design & Construction Method of Traditional Landscape Space through the 『Imwongyeongjeji』 「Seomyongji」 and the 'Standard Specification for Repairing Cultural Heritages' (『임원경제지』 「섬용지」와 문화재수리 표준시방서를 통해 본 전통조경공간 설계 시공방법)

  • Lee, Jung-Han
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.37 no.4
    • /
    • pp.1-10
    • /
    • 2019
  • The purpose of this study is to examine the design & construction methods of the traditional landscape space of the past and the repair and maintenance of cultural heritages to maintain it today. To this end, the method of narrative description, process extraction and construction related to traditional landscaping were compared to each other based on the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages'. The results are as follows; First, to analyze at the description methods of the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages' and related processes in the field of traditional landscaping. 『Imwongyeongjeji』 「Seomyongji」 was an encyclopedia of the overall construction method of the living space, describing the location, effect, and advantages and disadvantages of each component and presenting quantitative figures to institutionalize the construction of traditional landscaping spaces. 'Standard Specification for Repairing Cultural Heritages' presented the entire process of repairing cultural heritages, and it is becoming a kind of guide for reference at the site. Among them, foundation construction, roof construction, landscape construction, and fence construction were drawn as items that could be applied to traditional landscaping areas. Second, the traditional landscape space construction method was divided into the processes of foundation construction, roof construction, landscaping construction, and fence construction. Foundation construction is a way of repeating the process of land-tramping. During the construction of the roof, the tile-roofed building was built on top of the rafters and roofed with tiles. And thatched roof was made to a number of rice straws bundles to cover the roof one after the other. Instead of tiles, the stone roof was made of thin and wide stones, and the wooden boards were used for the single roof and the bark roof were constructed with many layers of dried corrugations. Landscape construction mainly consists of the Paving technique through tramping rubble and the construction of terraced flower by planting stone, plants, and shrubs on the top. According to the building materials, the wall construction was derived from the earth-stacked earthen wall, stone walls using stone and clay, marble walls made of tile patterns, and the construction of a board wall using a wood board as a wall. Third, comparing the construction methods of the 『Imwongyeongjeji』 「Seomyongji」 and 'Standard Specification for Repairing Cultural Heritages', 『Imwongyeongjeji』 「Seomyongji」 focuses on standardizing the construction methods to create a new traditional space. There is a difference in the setting of the scope of the 『Imwongyeongjeji』 「Seomyongji」 and the construction because 'Standard Specification for Repairing Cultural Heritages' provides the overall construction procedure considering the diversity of the cultural heritages. In addition, the traditional landscape space used to be a residential space in the past, but today, the maintenance process of the already established facilities as designated cultural heritages has been carried out, and construction methods have been added to create viewing conditions. In terms of the succession of traditional knowledge, some similar methods were found in the repair of cultural assets today, and some cases were also confirmed in the reconstruction of traditional technologies such as application of some materials or mix, separation of added facilities and introduction of efficient construction methods.

Evaluation of Odors and Odorous Compounds from Liquid Animal Manure Treated with Different Methods and Their Application to Soils (액상 가축분뇨의 처리 및 토양환원에 따른 악취 및 악취물질의 평가)

  • 고한종;최홍림;김기연;이용기;김치년
    • Journal of Animal Science and Technology
    • /
    • v.48 no.3
    • /
    • pp.453-466
    • /
    • 2006
  • To comply with stricter regulations provoked by increasing odor nuisance, it is imperative to practice effective odor control for sustainable livestock production. This study was conducted to assess odor and odorous compounds emitted from liquid animal manure with different treatment methods such as Fresh Manure(without treatment, FM), Anaerobic Digestion(AD) and Thermophilic Aerobic Digestion(TAD) and their application to soil. Air samples were collected at the headspace of liquid manure, upland and paddy soil, and analyzed for odor intensity and offensiveness using an olfactometry; odor concentration index using odor analyser; nitrogen-containing compound such as ammonia(NH3) using fluorescence method; and sulfur containing compounds such as hydrogen sulfide(H2S), methyl mercaptan(MeSH), dimethyl sulfide(DMS) and dimethyl disulfide(DMDS) using gas chromatography-pulsed flame photometric detector, respectively. Odor intensity, offensiveness and concentration index from TAD liquid manure was statistically lower than those from FM and AD(p<0.01). Mean concentrations of H2S, MeSH, DMS, DMDS and NH3 were 65.93ppb, 18.55ppb, 5.26ppb, 0.33ppb and 10.57ppm for liquid manure with AD; and 5.15ppb, 0.97ppb, 0.80ppb, 0.56ppb and 1.34ppm for liquid manure with TAD, respectively. More than 60% of malodorous compounds related to nitrogen and sulfur were removed by heterotrophic microorganisms during TAD treatment. When liquid manure was applied onto upland and paddy soil, NH3 removal efficiencies ranged from 51 to 94% and 22 to 91% for AD and TAD liquid manure, respectively. The above results show that liquid manure with TAD is superior to AD and FM with respect to the odor reduction and odor problem caused by land applied liquid manure is directly related to the degree of odor generated by the manure treatment method.

Development and Validation of the 'Food Safety and Health' Workbook for High School (고등학교 「식품안전과 건강」 워크북 개발 및 타당도 검증)

  • Park, Mi Jeong;Jung, Lan-Hee;Yu, Nan Sook;Choi, Seong-Youn
    • Journal of Korean Home Economics Education Association
    • /
    • v.34 no.1
    • /
    • pp.59-80
    • /
    • 2022
  • The purpose of this study was to develop a workbook that can support the class and evaluation of the subject, 「Food safety and health」 and to verify its validity. The development direction of the workbook was set by analyzing the 「Food safety and health」 curriculum, dietary education materials, and previous studies related to the workbook, and the overall structure was designed by deriving the activity ideas for each area. Based on this, the draft was developed, and the draft went through several rounds of cross-review by the authors and the examination and revision by the Ministry of Food and Drug Safety, before the final edited version was developed. The workbook was finalized with corrections and enhancements based on the advice of 9 experts and 44 home economics teachers. The workbook consists of 4 areas: the 'food selection' area, with 10 learning topics and 36 lessons, the 'food poisoning and food management' area, with 10 learning topics and 36 lessons, the 'cooking' area, with 11 learning topics and 43 lessons, and the 'healthy eating' area, with 11 learning topics and 55 lessons, resulting in a total of 42 learning topics, 170 lessons. The workbook was designed to evenly cultivate practical problem-solving competency, self-reliance capacity, creative thinking capacity, and community capacity. In-depth inquiry-learning is conducted on the content, and the context is structured so that self-diagnosis can be made through evaluation. According to the validity test of the workbook, it was evaluated to be very appropriate for encouraging student-participatory classes and evaluations, and to create a class atmosphere that promotes inquiry by strengthening experiments and practices. In the current situation where the high school credit system is implemented and individual students' learning options are emphasized, the results of this study is expected to help expand the scope of home economics-based elective courses and contribute to realizing student-led classrooms with a focus on inquiry.

Effects of Creep Feed and Milk Replacer and Nursery Phase-feeding Programs on Pre- and Post-weaning Growth of Pigs (돼지에서 입붙이 사료와 대용유 급여 및 이유자돈 사양프로그램이 이유 전과 이유 후의 성장에 미치는 영향)

  • Ha, Duck-Min;Jang, Kyoung-Soon;Won, Hye-Sook;Ha, Seung-Ho;Park, Man-Jong;Kim, Sung-Woo;Lee, C.-Young
    • Journal of Animal Science and Technology
    • /
    • v.53 no.4
    • /
    • pp.333-339
    • /
    • 2011
  • The present study was performed to investigate the effects of pre- and post-weaning feeding programs on growth of pigs. A total of 24 litters (avg. 10.6 piglets/litter) born from multiparous (Yorkshire ${\times}$ Landrace) dams ${\times}$ Duroc sires were provided with neither creep feed (CF) nor milk replacer ("CON"), 200 gm CF/litter/d from the 15th day of lactation ("MIN"), or CF and milk replacer ad libitum for 7 h during the daytime from the 7th day ("MAX") through weaning at d 21 of age. Sixty-eight weanling pigs selected randomly from each of CON and MIN were provided with phases 1, 2 and 3 nursery diets for 7, 14, and 13 days, respectively, in two pens; an equal number of piglets from MAX received the same diets for 6, 10, and 18 days, respectively. Subsequently, all pigs were fed grower 1 and 2 diets sequentially up to d 95 and 135, respectively. The entire pre- and post-weaning feeding trial was repeated three times under a split-plot design of experiment. Initial and final weights and ADG of the suckling pigs did not differ between MAX/MIN and CON. However, final wt of MAX adjusted for initial wt, which was 0.17-kg less in MAX than in CON, was greater than that of CON by 0.31kg, whereas the difference between MIN and CON in final wt barely changed after the adjustment. Growth of the animals during the nursery and growing phases was not affected by the feeding program, whereas d 55 and 135 BW, as well as d 6 BW, were highly correlated with weaning weight (r=0.81, 0.57, and 0.76; P<0.001, <0.05, and <0.001, respectively). In conclusion, results suggest that provision of creep feed and milk replacer from early lactation may be effective for increasing weight gain of light piglets, but that limited provision of creep feed during late lactation or extension of the duration of phases 1 and 2 vs. 3 nursery diets for several days is unlikely to influence the growth of pigs during the corresponding and subsequent periods.