• Title/Summary/Keyword: 모듈러 주택

Search Result 66, Processing Time 0.023 seconds

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

Improvement of Manufacturing Drawings for Manufacturing Quality Assurance of Modular Housing Unit (모듈러 주거시설의 단위유닛 제작품질 확보를 위한 공장제작도서 개선 연구)

  • Hwang, Hyun-Jun;Jung, Chan-woo
    • Journal of the Korean housing association
    • /
    • v.27 no.6
    • /
    • pp.137-144
    • /
    • 2016
  • In modular architecture, manufacturing drawing which includes whole information for modular unit production is essential since works for modular unit have to be performed in manufacturing factory not construction field. Although the manufacturing drawing is important as known it is insufficient to utilize the manufacturing drawing in modular architecture project and this makes modular unit low-quality with re-work and work time delay. To prevent low-quality modular unit caused by insufficient manufacturing drawing, in this research firstly manufacturing drawing's current situation and error cases in manufacturing phase of past modular housing project were analyzed, and correlation between reduction of errors occurance frequency and improving manufacturing drawing was verified. Secondly manufacturing drawing improvement factors were deducted in interior, furniture, mechanical work phase which errors' occurance rate is high and the way of deducting manufacturing drawing lists and contents were suggested with light-weight work as an example in case of new type of errors occurance. A series of research process can contribute to good-quality modular unit by errors reduction. As a result of research, about half of errors occurance can be reduced with suggested manufacturing drawing improvement factors. And the manufacturing drawing process can contribute to modular production which have uniform quality.

The Key Points of Architectural Planning for Floating Residential Architecture (플로팅 주거건축의 주요 건축계획 항목에 관한 연구 -플로팅 건축 관련 기준 및 주거건축 해외 사례를 중심으로-)

  • Song, Seog-Ki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.5281-5289
    • /
    • 2013
  • This study aims to identify the key points of architectural planning for floating residential architecture. For this purpose, this study analyses 6 kinds of standards about floating architecture and 14 cases of floating residential architecture. As a result, this study finds out 4 points of architectural planning for floating residential architecture; first, planning of access to upland and walkway, second, public facilities and community space planning, third, planning of various equipment, material and fixed extinguishing system for fire prevention, forth, modular system planning including manufacturing, transporting and installation of modular house.

Design and Planning Process Management for Reducing Rework in Modular Construction Using Dependency Structure Matrix (DSM) (DSM을 활용한 모듈러 건축 설계단계에서의 제작 및 시공 정보 반영 및 재시공 감소 방안)

  • Hyun, Hosang;Lee, Hyun-soo;Lee, Jeonghoon;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.2
    • /
    • pp.29-36
    • /
    • 2019
  • Modular construction has benefits such as short construction duration and high productivity owing to the production in factory and owing to simultaneous on-site work. However, rework occurs in modular construction and the rework affects the efficiency of modular construction. The almost of causes of rework are exist in design process. To reduce the cause of rework, the information flow of the design process should be managed and the plan to reduce rework should be included. However, the modular construction has complex process because of impeded unit production so it is hard to manage the information flow in design process. Moreover, when the plan to reduce rework is included, the design process will be more complicated. Therefore, the objective of this research is to suggest the design process including the rework reduction plan and to alleviate the complexity of design process by using Dependency Structure Matrix(DSM). By using DSM, the iteration and feedback in design process is reduced and it can be expected that rework in modular project can be reduced by using suggested design process.

A Study on Application of MC Design Standardization Standard and Current Status in Ga-Yang Modular Housing (가양 모듈러 실증단지의 MC설계표준화 기준 적용 및 실태조사 연구)

  • Lim, Seok-Ho;Chung, Joon-Soo;Seol, Wook-Je;Baek, Cheong-Hoon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.5
    • /
    • pp.85-94
    • /
    • 2019
  • The modular apartment has been completed for the first time in Korea through the national research and development (R&D) project in December 2017, and 30 households moved in. Although conditions such as technicality and constructability have to be satisfied to adopt and spread the modular apartments in the future, economic feasibility is the most important factor among the conditions. The economic feasibility of modular apartments can be compared with that of existing reinforced concrete (RC) structure apartments. It is highly important to reduce the construction cost through standardization above all. The standardization refers to establishment of national design standards and principles, and it is important for manufacturers and building companies to comply with those standards and principles. The modular construction (MC) skill in Korea is at an early adoption stage and the MC market is not widely expanded yet. Thus, the application of the MC design, which is the basis of the standardization, has not been widely accepted. However, related R&D projects are now performing mainly by the Ministry of Land, Infrastructure, and Transport to promote modular apartments in recent years and the design standardization standard (draft) is now prepared to be notified as a result of the steady research. Furthermore, pilot complexes for demonstration purpose are under construction, starting from public rental apartments. Thus, MC method-applied public rental houses will be spread in near future. This study aims to investigate the current design status in the Ga-Yang Housing as a pilot modular complex to produce and supply more economical and efficient modular houses, and analyze the problems by comparing the design standardization standards with pre-notified design standardization standards and summarize the modifications between them thereby presenting foundational data for establishment of the design standardization in the modular business industry.

A Study on Development of BIM Library for Unit Modular Housing - Focused on Small-sized Urban-life-housing - (유닛모듈러 주택의 BIM 라이브러리 개발 연구 - 소규모 도시형 생활주택을 중심으로 -)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.23 no.6
    • /
    • pp.11-20
    • /
    • 2012
  • This Study developed library of parts, applied with 3-dimension character which has width, length and height and a reference plane, for the system development of BIM design on housing unit modular. The current BIM software has not the concept of a reference plane or work tolerance in modular, so the development of parts library applied to unit modular has not moved forward. So, we developed, in this study, parts library applied to windows, built-in-furniture, kitchen systems and knock down bathrooms, with a reference plane and work tolerance based on single roon prototype on urban-life-housings. BIM library can utilize changed size and work tolerance of parts, and fabricating reference plane will be created automatically when an engineer puts work tolerance in the BIM library with supplement of some category related to work reference. Through this BIM library development, we consider the part module can be used for housing complex planning, and architectural designers will be able to utilize the BIM library for housing complex design.

Modular Building for Urban Disaster Housing: Case Study of Urban Post-Disaster Housing Prototype in New York

  • Ford, George;Ahn, Yong Han;Choi, Don Mook
    • Fire Science and Engineering
    • /
    • v.28 no.6
    • /
    • pp.82-89
    • /
    • 2014
  • Disasters that destroy homes and infrastructure and cause significant financial damage are becoming more common as population centers grow. In addition, several natural disasters have resulted in a major loss of life and created countless refugees due to damage to housing. After major catastrophic disasters, it is very important that the government agencies respond to post-disaster housing issues and provide resources such as temporary housing before the full rehabilitation and reconstruction of destroyed and damaged housing. To provide affordable temporary housing for residents who may lose their homes as the result of a catastrophic disaster including storms, government agencies must develop a post-disaster housing prototype. In general, government agencies should explore several different forms of factory-built single-story, single family housing, such as modular homes, panelized homes, and precut homes. In urban cities including New York and Seoul, it is very important to provide housing which supports the demand for higher-density living spaces than single-family homes or trailers typically available due to the high population density and the desire to resettle as many residents as possible in their former neighborhoods. This study identified the urban post-disaster housing prototypes that may provide higher density housing with high quality living spaces, high air quality, and energy efficiency as well as rapid deployment. A case study of "Urban Post-Disaster Housing Prototype Program in New York" was conducted through a detailed interview process with a designer, engineer, contractor, the Office of Emergency Management (OEM) in New York, the U.S. Army Corps of Engineers (USACE), and temporary occupants. An appropriate disaster housing program that can provide living spaces for victims of disasters that keeps residents in their community and allows them to live and work in their neighborhoods was developed.

Multi-objective Optimization Model for Tower Crane Layout Planning in Modular Construction (모듈러 건축의 타워크레인 배치계획 수립을 위한 다중 최적화 모델 개발)

  • Yoon, Sungboo;Park, Moonseo;Jung, Minhyuk;Hyun, Hosang;Ahn, Suho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.36-46
    • /
    • 2021
  • With an increasing trend toward high-rise modular construction, the simultaneous use of tower cranes at a modular construction site has recently been observed. Tower crane layout planning (TCLP) has a significant effect on cost, duration, safety and productivity of a project. In a modular construction project, particularly, poor decision about the layout of tower cranes is likely to have negative effects like additional employment of cranes and redesign, which will lead to additional costs and possible delays. It is, therefore, crucial to conduct thorough inspection of field conditions, lifting materials, tower crane capacity to make decisions on the layout of tower cranes. However, several challenges exist in planning for a multi-crane construction site in terms of safety and collaboration, which makes planning with experience and intuition complicated. This paper suggests a multi-objective optimization model for selection of the number of tower cranes, their models and locations, which minimizes cost and conflict. The proposed model contributes to the body of knowledge by showing the feasibility of using multi-objective optimization for TCLP decision-making process with consideration of trade-offs between cost and conflict.

Load analysis for transporting unit module (유닛모듈 운반시 작용하중 분석)

  • Kim, Kyoon-tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.200-201
    • /
    • 2015
  • The unit modular method is one in which unit modules are prefabricated at a factory and then constructed at a construction site. That is why an important process, transporting unit module, is added in this method. The purpose of this study is to analyse the load for transporting unit module. The results of the analysis of the driving experimental runs revealed that a maximum load of 15 kN was applied on adapter block type A and a maximum load of 25 kN on adapter block type B. These loads were recorded at the points in the road test when the low-bed trailer was driving through unstable sections of the test such as stopping, restarting, passing over a speed bump or taking a left turn at speed.

  • PDF

Study of Improved Transporting Methods on Unit Module (유닛모듈 운송 방법의 개선방향 연구)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Park, Nam-Cheon;Jung, In-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.243-244
    • /
    • 2012
  • Recently, research has been actively conducted for getting interested in unit module housing. However, the domestic unit modular housing research in the early stages yet, so the major process for research is lacking. Explore all these reasons fit with domestic unit housing development this paper, focusing on the process of shipping cargo by truck, transport unit module was studied. The purpose of this paper is to present new ideas and derive the direction of the development of the equipment safely and effectively fixed to the unit module of the transport unit module that will be helpful in the development of the equipment required for the transport process of the next unit module.

  • PDF