• Title/Summary/Keyword: 말뚝 공사

Search Result 139, Processing Time 0.028 seconds

A Neural Network Model for Selecting a Piling Method of Building Construction (건축공사 말뚝공법 선정을 위한 신경망 모델 개발)

  • Cheon Bong-Ho;Koo Choong-Wan;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.317-322
    • /
    • 2004
  • As a construction project in urban area tends to be high-rise and huge, the importance of the project's underground work, in terms of the cost and the schedule, is gradually increasing. It's extremely significant to choose a proper filing method, at the stage of underground work. However, in piling work many change orders have been occurred since a piling method is experientially selected based on uncertain information and many earth factors to consider. It has effects on the cost and the schedule of the project. In this study, we have suggested a decision model for piling method that can be used to determine and verify the suitable piling method in design and pre-construction phase of a project. Based on historical data, a neural network model has already proven to be efficient. The tests of the model for selecting a suitable piling method have progressed exactly with the data of 150 piling works which were done room 2000 to 2004 in Korea. The optimization or the developed neural network model has progressed with the data for teaming. The validity of the neural network model has been verified.

  • PDF

The Characteristics of Axial Bearing Capacity for the High Strength H-pile (고강도 H말뚝의 연직 지지력 특성)

  • 신방웅;여병철
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.2
    • /
    • pp.135-143
    • /
    • 2000
  • 고강도 H말뚝은 다른 말뚝에 비해 관입성이 우수하며, 경제적으로 시공이 가능하여 도로공사 및 건축공사의 기초말뚝으로 광범위하게 전세계적으로 사용되어지고 있다. 따라서 본 논문에서는 고강도 H말뚝, 강관말뚝 및 PHC 말뚝에 정재하시험과 동재하시험을 실시하여 허용지지력을 비교 분석하였으며, 각각의 말뚝에 대한 동재하시험을 통해 시간경과효과를 평가하였다. 정재하시험과 동재하시험을 비교 분석한 결과 하중-침하곡선이 유사한 것으로 조사되었다. 또한 고강도 H말뚝, 강관 말뚝, PHC 말뚝이 지반내에 향타되었을 때의 허용지지력은 시간이 경과함에 따라 증가하는 것으로 평가되었다. 재하시험 결과 시간경과효과로 인해 지반의 허용지지력이 상승됨을 알 수 있어 앞으로 기초말뚝 설계시 참고자료로 활용할 수 있을 것으로 사료된다.

  • PDF

Suggestion of Optimum PHC Pile for 15~40 Story Shear Wall Type Apartment Building (벽식공동주택의 층수변화에 따른 최적 PHC말뚝 제안)

  • Lee, Bum-Sik;Park, Jong-Bae;Park, Yong-Boo;Kim, Sang-Yeon;Ha, Young-Bae;Choi, Geong-Ryun
    • Land and Housing Review
    • /
    • v.3 no.2
    • /
    • pp.177-185
    • /
    • 2012
  • LH applies a uniformly standardized PHC Pile to 15~25 stories of Shear-wall type Apartment Building. Recently it is predicted that LH will construct over 30~40 story Apartment Building to keep varied project condition and faces urgent needs to save construction cost for improving its competitiveness. Therefore, structural analysis and design on the upper part and foundation of apartment building were carried out in this study by subdividing story of apartment building, e.g. 15, 20, 25, 30, 35, 40 stories. Reflecting the result of basement analysis and design, the economic evaluations are performed and the optimum diameters of PHC piles are suggested. The result of this paper is considered to be applied usefully for foundation design of LH apartment housing, and the suggested PHC Piles can be used effectively by increasing efficiency and saving the construction cost of foundation.

Design of Large-Diameter Drilled Shaft Bearing on Gravel Layer (대구경 현장타설말뚝의 자갈 지지층 적용 설계사례)

  • Lee, Jae-Hoon;Joo, Soo-Il;Ryu, Tae-Ha;Choi, Jae-Ho
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.115-132
    • /
    • 2006
  • 본 글은 부산-김해간 경량전찰 건설공사의 기초설계시 현장타설말뚝 기초의 지지층을 모래자갈층으로 적용한 사례이다. 낙동강 유역은 퇴적층이 발달하여 풍화암 이상의 기반암층이 지표하 60~80m 이후에서 출현하며, 40m 이상의 심도에서 매우 조밀한 상태의 모래자갈층이 10-20m 두께로 분포하고 있어, 모래자갈층을 관통하여 기반암에 말뚝기초를 지지할 경우 기초공사에 상당한 기간이 소요될 뿐만 아니라, 시공성과 경제적인 측면에서 매우 불리하다. 이에 대한 개선방안으로 대구경 현장타설말뚝을 N치 50 이상의 조밀한 상태의 모래자갈층에 지지하였으며, 인근현장의 적용사례, 기초 구조물 안전성 검토 및 현장재하시험 등의 비교분석을 통하여 모래자갈 지지층의 적정성을 확인하였다. 따라서, 풍화암 이상의 지지지반 출현심도가 60m 이상으로 매우 깊고, 지지지반 상부에 모래자갈층이 두껍게 분포하는 경우에는 모래자갈층을 말뚝기초의 지지층으로 활용하는 방안이 시공성 및 경제성 측면에서 합리적이라 판단된다.

  • PDF

A Study for Improved Design Criteria of Composite Pile Joint Location based on Case Analysis (사례 분석을 통한 복합말뚝 이음위치의 설계 기준식 개선 연구)

  • Hwang, Uiseong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.3
    • /
    • pp.21-30
    • /
    • 2019
  • Composite pile, which is composed of the steel pipe pile in which the large horizontal force acts and the PHC pile in which the small horizontal force acts by a special connecting devices, is being commercialized as a base material for civil engineering structures. The core of such a composite pile can be said to be a design criterion for estimating the joint position and stability of the connection device between steel pipe pile and PHC pile. In Korea, there is no precise specification for the location of composite pile joints. In the LH Design Department (Korea Land & Housing Corporation, 2009), "Application of composite pile design and review of design book marking" was made with reference to Road Design Practice Volume 3 (Korea Expressway Corporation, 2001). this is used as a basis of the design of the composite pile. It can not be regarded as a section change of the composite pile, so it has a limitation in application. Therefore, In this study, we propose a design criterion for the location of the section of the composite pile (joint of steel pipe pile and PHC pile) and evaluate the stability and economical efficiency of it by using experimental method and analytical method. Analysis of composite pile design data installed in 79 domestic bridges abutment showed that the stresses, bending moments, and displacements acting on the pile body and connection of the pile were analyzed. Through the redesign process, it was confirmed that the stresses generated in the connecting device occur within the allowable stress values of the connecting device and the PHC pile. In conclusion, the design proposal of composite pile joint location through empirical case study in this study is an improved design method considering both stability and economical efficiency in designing composite pile.

Detecting Steel Pile Using Bore-hole 3-components Fluxgate Magnetometer (강관말뚝 탐지를 위한 시추공 3성분 자기탐사)

  • Lee, Heui-Soon;Rim, Hyoung-Rea;Jung, Ho-Joon;Jung, Hyen-Key;Yang, Jun-Mo
    • Journal of the Korean earth science society
    • /
    • v.31 no.7
    • /
    • pp.673-680
    • /
    • 2010
  • A steel pile often utilized to bear heavy loads of the upper sub-structure, e. g., bridge constructions and tall buildings. As the steel piles are driven in the underground, it is not easy to detect the depth of the existing pile foundation when there is no detailed foundation information available. However, accurate informations of the depths of piles becomes critical required when reinforcing the existing structures or constructing new ones at the adjacent stage to assure the safety of existing structures. In this study, we tested the applicability of the three components borehole fluxgate magnetometer for detecting the depths and locations of steel piles which are commonly used in civil engineering. Results showed that the information of location as well as the depth of steel piles could be obtained by using data from the three components borehole fluxgate magnetometer.

Comparison of Construction Costs for Bridge Foundation with Optimization of Steel and PHC Embedded Piles (강관 및 PHC 매입말뚝의 최적화에 따른 교량기초의 공사비 비교)

  • Yun, Jung-Mann;Yea, Geu-Guwen;Kim, Hong-Yeon;Kim, Dong-Min;Kim, Soo-Lo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.71-78
    • /
    • 2016
  • In this study, execution costs of the foundation system are compared with PHC and steel pile in the same soil layers and load condition. Steel piles installed on the thin weathered rock are reduced as 12.5% in comparison with the number of PHC piles. Steel piles installed on the soft rock through weathered rock with 1.7m of thickness reduce the number of piles as 35.7% (STK 400) and 46.4% (STK 490), respectively, in comparison with PHC piles installed on the weathered rock. Also, they reduce the number of piles as 26.5% (STK 400) and 38.8% (STK 490), respectively, in comparison with steel piles (STK 400) installed on the weathered rock. When the thickness of footings is constant, steel piles installed on the soft rock may reduce the area of footings up to 12.2% (STK 400) and 45.4% (STK 490), respectively, in comparison with PHC piles installed on the weathered rock. Total cost of foundation system installed on the soft rock with steel piles (STK 400) increases as 12%, whereas in case of replaced with steel piles (STK 490), it reduces as 16% in comparison with PHC piles installed on the weathered rock. This is because the cost reduction due to the number of piles and footing area is more effective despite high cost of steel piles (STK 490). When the thickness of weathered rock is less than 5m, installing steel piles (STK 490) on the soft rock through it is more economic in comparison with installing PHC piles on the weathered rock.

A Suggestion of High Quality Concrete for PHC Pile (PHC 말뚝의 콘크리트 고품질화를 위한 제언)

  • 최승선
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.6
    • /
    • pp.41-48
    • /
    • 2002
  • 2001년도 년간 302만 4,000ton의 사용실적을 보이고 전체 콘크리트 말뚝 사용량의 99.5%를 점유하고 있는 PHC 말뚝은 국내에 도입된 1992년이래 약 10년 동안 양적, 질적으로 많은 발전을 거듭하여 왔으며 현재 우리나라의 건축 토목공사용 기초자재로서 없어서는 안될 중요한 위치를 확보하고 있는 것이 사실이다. 1970년대까지 주로 사용되었던 RC 말뚝은 1970년대 후반부터 PC 말뚝으로 대체되었고, 1990년도 초반 생산되기 시작한 PHC 말뚝이 우리나라 콘크리트 말뚝의 주류를 이루어 현재콘크리트 말뚝의 대명사로 자리 매김하며 발전을 거듭하고 있는 것이다. 또한 PHC 말뚝에 사용되는 콘크리트의 압축강도는 800kgf/$\textrm{cm}^2$ 이상이 확보되어야 함으로 콘크리트 공장제품 중에서 보기 드물게 고강도를 요구하고 있으며 고강도화를 위한 제조공정의 품질관리도 높은 수준이 요구되어 우리나라 콘크리트 공장제품의 고강도화와 품질향상에 기여한 정도가 이루 말할 수 없을 정도로 크다고 볼 수 있다.(중략)

A Study on the Improvement Method of Construction Management for PHC Pile in an Apartment House (공동주택 PHC 파일 공사관리 개선방안에 관한 연구)

  • Yoo Jae-Wook;Kim Tae-Hui;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.244-247
    • /
    • 2002
  • The pile foundations have been chosen more frequently as the comprehensive development of the country progressed, especially where the ground conditions are not suitable for the construction and the dimension and the length of the piles utilized becomes larger and longer. The purpose of this study suggests the improvement method of construction management for PHC pile in an apartment house. To do This, We analyzed about current process and provided improved Process with IDEF method. And, The objectives of this research is to propose the means to solve the current problems and management factors from the results of the investigation.

  • PDF

A Case Study of Extra Reinforcement by Road Extension work on Existing Cut Slope Reinforced with Counterweight Fill and Stabilizing Piles (압성토 및 억지말뚝으로 보강된 도로의 확장공사로 인한 추가 보강사례 연구)

  • Park, Jeong-Yong;Kim, Woo-Seong;Kim, Jae-Kyoung;Yang, Tae-Sun;Na, Kyung-Joon
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.2
    • /
    • pp.67-72
    • /
    • 2008
  • To confirm the stability of a cut slope in the road extension construction site, several investigations were carried out and countermeasures of slope was studied. This paper describes a study of design case of extra reinforcement on existing cut slope reinforced by preloading and piles in roads. To investigate the effect of stabilizing piles installed in a cut slope, an instrumentation system also designed, was. As a result that the stabilizing file and earth anchor are considered as the extra reinforcement, both stabilizing pile and earth anchor guarantee the stability of cut slope. However, stabilizing pile is selected in aspects of economy and continuity to the existing cut slop reinforcement including counterweight fill and stabilizing piles.

  • PDF