• Title/Summary/Keyword: 말뚝절단

Search Result 8, Processing Time 0.028 seconds

A study on the effect of the pile tip deformations on the pile behaviour to shield TBM tunnelling (Shield TBM 터널시공으로 유발된 말뚝선단의 변형이 말뚝거동에 미치는 영향에 대한 연구)

  • Young-Jin Jeon;Byung-Soo Park;Young-Nam Choi;Cheol-Ju Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.169-189
    • /
    • 2024
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of pre-existing single piles and pile groups to adjacent Shield TBM tunnelling by considering various reinforcement conditions. The numerical modelling has analysed the effect of the pile cutting, ground reinforcement and pile cap reinforcement. The analyses concentrate on the ground settlements, the pile head settlements, the axial pile forces and the shear stress transfer mechanism at the pile-soil interface. In all cases of the pile tips supported by weathered rock, the distributions of shear stresses presented a similar trend. Also, when the pile tips were cut, tensile forces or compressive forces were induced on the piles depending on the relative positions of the piles. Furthermore, when the pile tips are supported by weathered rock, approximately 70% of the load is supported by surface friction, and only the remaining 30% is supported by the pile tip. Furthermore the final settlement of the piles without reinforcement showed approximately 70% more settlement than the piles for which ground reinforcement is considered. It has been found that the ground settlements and the pile settlements are heavily affected by the pile cutting and reinforcement conditions. The behaviour of the single pile and group piles, depending on the pile cutting, conditions of ground and pile cap reinforcement, has been extensively examined and analysed by considering the key features in great details.

Cutting of Concrete Block Using Detonating Cords (도폭선을 이용한 콘크리트 블록 절단 연구)

  • Kim, Jung-Gyu;Kim, Jong-Gwan
    • Explosives and Blasting
    • /
    • v.37 no.4
    • /
    • pp.17-25
    • /
    • 2019
  • The method to remove the head of the cast-in-place pile using the detonating cord and horizontal separation plate was proposed in this paper. Plain concrete block was fabricated. Through the blasting test of the concrete block, the charge weight and the burden required for cutting the pile head were identified. The degree of damage of concrete blocks after cutting the head was checked using AUTODYN 2D. As a result of the experiment, it was found that the concrete block was cut using the 10 g/m detonating cord and horizontal separation plate, and the directional cutting of the block using the horizontal separation plate and the block damage caused by the detonating cord were reduced.

Development of All-in-one Attachment Based Steel Pipe Pile Cutting Robot Prototype (강관말뚝 두부정리 및 절단 부위 핸들링 로봇의 프로토타입 개발)

  • Yeom, Dong Jun;Han, Jae Hyun;Jung, Eui Hyun;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.115-123
    • /
    • 2018
  • The primary objective of this study is to develop an all-in-one based steel pipe pile cutting robot prototype that improves the conventional steel pipe pile head cutting work in safety, quality, and productivity. For this, the following research works are conducted sequentially; 1)literature review and expert survey, 2)selection of core technology using AHP analysis, 3)deduction of detail design, 4)verification of structural stability, 5)development of full-scale prototype. As a result leveling laser and laser detector(94.46), plasma cutter(96.72), rotary grapple(98.45) are selected as a core technologies. As an outcome, it is analyzed that gripper, cylinder pivot bracket and gripper base are structurally stable. Their maximum stresses are shown as 43.0%, 19.4%, 5.3% compared to their yield strength respectively. The development of full-scale prototype in this study will be utilized for the development of the all-in-one attachment based steel pipe pile cutting robot commercialization model.

Bolted Bonding Method of Steel Pipe Pile and Cap (볼트식 강관말뚝 머리보강 방법)

  • 박영호;김성환;장용채
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-71
    • /
    • 1998
  • Present bonding methods which connect steel pipe and spread footing in pile foundation have been generally used. These methods however showed lots of difficulties in the quality control. A new bonding method, which is called 'Bolted Bonding Method(BBM)' , is developed. This method uses factory-made parts so that it may increase the degree of quality, and workability, and is being adopted in the Held concerned. The method is verified by the structural analysis and laboratory test and then a new design formula is proposed. In addition, a comparison test of the present methods and BBM are conducted to observe the applicability and economy of the latter. As results, it is observed that BBM shows 5 to 10 times faster in Held work and 9% to 50% cheaper in construction cost than the existing methods.

  • PDF

Structural Capacity of High Strength Steel Pipe Pile After Pile Driving (고강도 강관말뚝의 항타후 구조성능 분석)

  • La, SeungMin;Yoo, Hankyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6C
    • /
    • pp.251-258
    • /
    • 2011
  • Steel pipe piles have been used as various deep foundation materials for a long time. Recent increase in steel material cost has made engineers reluctant in using it even with its good quality and ease of construction. Therefore when constructing with steel pipe pile, the decision to reuse the excessive pile length that is cut off from the designed pile head elevation after pile driving can be cost saving. This has caused many constructors to reuse the pile leftovers with new piles, but the absence of quantitative structural capacity behaviors of steel pipe pile after pile driving or appropriate countermeasures and standards in reusing steel pipe pile has resulted in wrong applications, pile structural integrity problems, inappropriate limitation of reusable pile length, etc. The structural performance analysis between a new pile and a pile that has undergone working state and ultimate state stress level during pile driving was performed in this research by means of comparing the results between the dynamic pile load test, tensile load test, charpy energy test and fatigue test for high strength steel of $440N/mm^2$ yield strength. Test results show that under working load conditions the yield strength variation is less than 2% and for ultimate load conditions the variation is less than 5% for maximum total blow count of 3000. The results have been statistically analyzed to check the sensitivity of each factors involved. From the test results, reusability of steel pipe pile lies not in the main pipe yield strength deviation but in the reduction of absorb energy, strength changes and quality control at the welded section, shape deformation and local buckling during pile driving.

Conceptual Design and Technical Feasibility Analysis of an All-in-one Attachment Based Steel Pipe Pile Cutting Robot (굴삭기 기반 강관말뚝 두부정리 및 절단 부위 핸들링 로봇의 개념디자인 및 기술적 타당성 분석)

  • Yeom, Dong Jun;Han, Jae Hyun;Jung, Eui Hyun;Kim, Young Suk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.11
    • /
    • pp.45-54
    • /
    • 2018
  • The primary objective of this study is to develop a conceptual design of all-in-one attachment based steel pipe pile cutting robot that improves the conventional work in safety, quality, convenience and productivity. For this, the following research works are conducted sequentially; 1)literature review, 2)field investigation, 3)selection of element technology for conceptual design, 4)deduction of conceptual design and its work process, 5)technical feasibility analysis of the conceptual design and its work process. As a result, leveling laser and laser detector, plasma cutter, rotary grapple are selected as core technologies. Futhermore, a conceptual design and work process of an all-in-one attachment based steel pipe pile cutting robot are developed based on the core technologies. According to the technical feasibility analysis result, at least 76.8% of the respondents are selected positive answer about each device of the all-in-one attachment based steel pipe cutting robot. It is expected that the application range and impact on the construction industry will be enormous due to the increasing trend of the steel pipe pile market.

GNSS-Based PHC Pile Cutting Position Sensing Methodology (GNSS 기반 PHC 파일 절단위치 센싱 방법론에 관한 연구)

  • Cho, Se-Hyun;Yoou, Geon-Hee;Kim, Jun-Sang;Lee, Jun Ho;Hur, Je;Kim, Young Suk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.387-388
    • /
    • 2023
  • PHC pile head cutting is an essential work in pile foundation construction. However, since the work has labor-intensive characteristics, there are problems such as productivity and safety. So in previous study PHC pile one-cutting head cutting automation equipment was developed to solve this problem. However, it has been investigated as a limitation that checking the cutting position of the PHC pile can be challenging in place where a rotary laser leveler cannot irradiate cutting position, as the sensing unit of the developed automated equipment utilizes an optical method. Therefore, the objective of this study is to delvelop a GNSS-based methodology for sensing the cutting position of PHC piles to overcome the limitations of the optical method and to examine its feasibility for field application. If the proposed methodology is applied to the construction site, it is expected that the convenience and productivity of the PHC pile cutting position sensing work will be improved.

  • PDF

Shear Tests Under Constant Normal Stiffness for Granite-concrete Interface (화강암 절단면과 콘크리트 부착면에 대한 일정강성도 전단시험)

  • 조천환;이명환;유한규
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.1
    • /
    • pp.5-12
    • /
    • 2004
  • The purpose of this paper is to make an understanding of fundamental mechanism of shear behaviour between rock and concrete interfaces in the pile socketed into granite. The interface of pile socketed in rock can be modeled in laboratory tests by resolving the axi-symmetric pile situation into the two dimensional situation under CNS(constant normal stiffness) direct shear condition. In this paper, the granite core samples were used to simulate the interface condition of piles socketed in granite in our country. The samples were prepared in the laboratory to simulate field condition, roughness(angle and height), stress boundary condition, and then tested by CNS direct shear tests. This paper describes shearing behaviour of socket piles into domestic granite through the analysis of CNS test results. It was found out that the peak shear strength increases with the angle of asperity and CNS value, and also the dilation increases with the angle of asperity but decreases with the CNS value.