Journal of the Earthquake Engineering Society of Korea
/
v.3
no.3
/
pp.45-54
/
1999
It is known from the previous study on the behavior of sharter single pile during simulated seaquake induced by the vertical component of earthquake that the compressive capacity and the soil plugging resistance of single open-ended pipe pile were completely degraded. But, the capacity of single open-ended pipe pile with greater penetration and the capacity of piles group with shorter penetration were expected to be stable after seaquake motion. In this study, first single pile, 2-pile or 4-pile groups with several simulated penetrations were driven into the calibration chamber with saturated fine medium sand and the compressive load test for each installed pile or pile groups was performed. Then, about 95% compressive load of the ultimate capacity was applied on the pile head during the simulated seaquake motion. Finally, to confirm the reduction of pile capacity during the simulated seaquake motion, the compressive load test for each single pile or pile groups after seaquake motion was performed. During the simulated seaquake, compressive capacities of single open-ended pipe pile and piles group installed in shallow sea were not decreased. But, the stability of open-ended pile installed in deep sea was depended on the pile penetration depth. So, single open-ended pile with greater penetration of 27 m was stable, and 2-pile and 4-pile groups with penetration more than 13m were stable. But, 2-pile groups with penetration of 7m was failed, and the compressive capacity of 4-pile groups with penetration of 7m was degraded about 15%.
KSCE Journal of Civil and Environmental Engineering Research
/
v.14
no.4
/
pp.965-975
/
1994
Opening the tip of a PHC pile, under a constant driving energy, can result in an increment of penetration depth due to the decrement of driving resistance. Therefore, the bearing capacity of an open-ended PHC pile may become larger than that of a closed-ended PHC pile by virtue of the increased embedded length. However, two main problems can be caused by opening the end of PHC pile. First problem is the variation of bearing capacity by opening the pile tip, and the second one is whether the tip of an open-ended PHC pile will be failured by a high pressure developed by the soil plug. In this study, model pile tests in calibration chamber were performed to investigate the practicability of open-ended PHC pile in view of both the pile bearing capacity and the possible failure of the pile tip. According to the test results, the total bearing capacity of open-ended piles approaches the total bearing capacity of closed-ended piles with the increase of the penetration depth. The failure of pile tip could be occurred in the region of 0.8~1.1 times as the inside diameter from the pile tip.
In this study, the stability of group piles installed in deep sea to the seaquake was studied by performing the calibration chamber model tests for open-ended pipe piles, grouted piles under soil plug and close-ended piles installed in the simulated deep sea. For each case (a single pile, 2-pile and 4-pile groups), series of seaquake tests were performed. While, during the simulated seaquake, the compressive capacity of the single open-ended pile depended on pile penetration depth(=7m), were found to be stable. But, a single grouted pile with penetration depth of 13m kept "mobility" state, the one with penetration depth of 20m was stable and grouted pile groups with penetration depth of 7m were stable regardless of pile penetration depth. By grouting soil plug of open-ended piles and soil under the pile toe of open-ended pipe piles installed in the deep sea, failure of soil plugging was prevented. Thus, close-ended piles were more stable than open-ended pile against the seaquake motionake motion.
Proceedings of the Korean Geotechical Society Conference
/
2008.10a
/
pp.713-720
/
2008
본 연구는 낙동강 하구 대심도 연약지반에 항타관입된 PHC 말뚝에 대하여 SPT 지지력 공식으로 부터 계산된 선단지지력 값과 PDA 시험에서 얻어진 선단지지력 측정값을 비교하였다. 또한, SPT N값이 50이 넘는 경우에 대하여는 N값과 롯드 관입깊이의 선형관계를 가정하여 30cm 관입깊이에 해당하는 N값을 적용한 경우와 CPT $q_c$와의 상관성을 이용하여 $q_c$값으로부터 N값을 산정한 경우의 2가지 분석을 수행하였다. 그 결과, 본 연구에서 적용한 SPT 지지력 공식 모두 측정된 선단지지력 값과 차이가 났으며, SPT 지지력 공식은 대심도 연약지반에 항타 근입된 말뚝에 대하여 실제적인 설계를 수행할 때 신뢰하기 어려운 것으로 나타났다. 또한, N>50인 경우에 대하여 N값과 롯드 관입깊이의 선형관계를 적용하는 것은 지지력을 매우 과대평가하는 것으로 나타났다.
Seo, Seunghwan;Kim, Juhyong;Choi, Changho;Chung, Moonkyung
Journal of the Korean Geotechnical Society
/
v.38
no.11
/
pp.97-106
/
2022
The domestic auger-drilled pile method generally manages the driving penetration (set) value with the final stage of construction. The penetration value has been estimated by manual measurement for a long time. The automation technology is yet to be applied due to workability and high-cost limitations, despite safety issues and lack of reliability in measured results. In this study, a non-contact pile penetration measurement device was developed. Further, the field performance was verified by comparing the measurements with a conventional automation device. In addition, the on-site field quality control method was analyzed using the penetration measuring device. The field experiments confirmed that more reliable bearing capacity estimation could calculate the dynamic damping coefficient and the modified Hiley formula with the developed device. Furthermore, it can be used for pile construction management from the bearing capacity viewpoint, even for piles not subjected to dynamic load tests.
Performance improvement of helical piles in static load tests using hexagon joints that do not require welding or bolting was investigated. Two sites were selected for pile field tests to evaluate their bearing capacity. Static and pull-out load tests were undertaken to assess the method for estimating bearing capacity. The field tests indicated that the bearing capacity of the gravity grout pile was ≥600 kN in the static load test, consistent with the AC 358 Code. The non-grout pile had a bearing capacity of ≤600 kN, suggesting that gravity grouting is required. Field pile load-test results were used to establish the bearing capacity equation, based on a small number of helical pile.
Journal of the Korea Academia-Industrial cooperation Society
/
v.8
no.4
/
pp.848-852
/
2007
Many numerical analysis tools for predicting penetration speed of sheet pile are thought to be unreliable because they overestimate penetration speed for shallow depth of penetration. In order to overcome the defects of numerical analysis, lateral vibration model of sheet pile was suggested and energy consumption due to lateral vibration of sheet pile was estimated. Also, load reduction factor which explains reduction of vibratory driving force due to lateral vibration was introduced.
The standard penetration test (SPT) has been widely used because of its usability, economy, and many correlations with soil properties among other factors. In SPT, hammer energy is an important factor to evaluate and calibrate N values. To measure hammer energy, an instrumented SPT rod was developed considering that stress waves transferring on rods during SPT driving are the same as stress waves transferring on piles due to pile driving. Using this idea, an instrumented SPT rod with a pile driving analyzer was applied as a pile capacity prediction tool in this study. In order to evaluate this method, SPT and dynamic cone tests with the instrumented SPT rod were conducted and also 2 pile load tests were performed on pre-bored steel pipe piles at the same test site. End bearings were predicted by CAPWAP analysis on force and velocity waves from dynamic cone penetration tests and SPT. Comparing these predicted end bearings with static pile load tests, a new prediction method of the end bearing capacity using the instrumented SPT rod was proposed.
Proceedings of the Korean Geotechical Society Conference
/
1995.10a
/
pp.17.2-25
/
1995
한계상태설계법이 지반공학에 도입되었다. 하중과 지지계력수법 그리고 우로코드로 되어있는 본 설계법에서 신뢰성이론을 토대로 한 전자는 북미지역에서, 반통계론적인 후자는 최근에 통합된 유럽연합에서 오래동안 연구 후 채택하였다. 본 논문은 이러한 설계법을 방법론적으로 검토접근하며 다른 선진국의 연구활동을 알아봤으며, 하중과 지지력계수설계법에서 관입말뚝에 대한 지지력계수를 결정하는 합리적인 방법론을 제시하는데 있다.
In this study, the impact of pile tip geometry, including shape, size, and angle, on the drivability and stress concentration during pile driving was investigated using 3D printing technology and finite element numerical analysis. A series of field loading tests were conducted on a test pile with various pile tip conditions, including width, angle, and shape. The changes in settlement were quantified as a ratio to the settlement of a conventional pile tip case and large deformation finite element analysis was used to investigate the maximum stress on a pile tip and the location of possible damage during pile driving. The results showed that by modifying the shape, size, and angle of the pile tip, the drivability of the pile could be improved and the maximum stress concentration around the pile tip could be significantly reduced, thereby ensuring the structural integrity of the pile during pile driving.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.