• Title/Summary/Keyword: 리스크 우선순위

Search Result 47, Processing Time 0.025 seconds

A Study on Implementing a Priority Tasks for Invigoration of Cloud in Financial sector (금융권 클라우드 도입 활성화를 위한 우선순위 과제 도출 연구)

  • Park, Wonhyo;Chang, Hangbae
    • Journal of Platform Technology
    • /
    • v.8 no.1
    • /
    • pp.10-15
    • /
    • 2020
  • Recently, various industrial sectors have introduced cloud service actively in their business because cloud computing technology enables storage·management and analysis·utilization of data easily in anytime, anywhere. Especially in financial sector, the business provocatively adopted the service and creates various innovative cases; furthermore, already in abroad, the sector has been accelerating digitization of analysis in cases of credit risk, financial fraud data, stock trading etc. On the contrary, in the domestic financial industry, not only the cloud service introduction and innovation cases are underperformed, but most of them are focused on the back-office service. Most Korean financial corporations are burdened with the adoption of cloud service due to various conservative regulatory requirements, such as regulations on data storage and management, regulations on privacy, and other tasks such as developing decision models and establishing responsibility standard for security incidents and service failures. In this study, it would be aimed to contribute to promote the introduction of the cloud in the domestic financial sector by drawing up preemptive challenges and inspecting priorities.

  • PDF

Profiling and Priority Selection of Foodborne Pathogens in Fresh Produce (국내 신선 농산물 생물학적 위해요소 우선순위 설정)

  • Lee, Chaeyoon;Sung, Dongeun;Oh, Sangsuk
    • Journal of Food Hygiene and Safety
    • /
    • v.27 no.4
    • /
    • pp.356-365
    • /
    • 2012
  • There have been growing concerns among people about food safety due to insufficient information on foodborne pathogens. In this study, we developed a risk priority of 15 foodborne pathogens. For the priority determination we collected risk profile criteria information from CODEX Alimentarius Commission and developed countries. The basis for criteria we selected from information of surveillance were frequency and severity of disease, frequency of consumption and probability of cross-contamination. We also considered foodborne pathogens which have been managed in developed countries though those pathogens are not currently managed appropriately in Korea. Priorities were divided into three groups following these consideration. The first priority group includes Norovirus, pathogenic E. coli, Salmonella spp, Clostridium botulinum and Listeria monocytogenes. The second priority group includes Vibrio parahaemolyticus, Stapylococcus aureus, Campylobacter jejuni and Bacillus cereus, and the third priority group includes Clostridium perfringens, Yersinia enterocolitica, Shigella spp, Cronobacter sakazakii and Hepatitis A virus. Our results could be applied to prevent foodborne illness from fresh produce.

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

Business impact analysis for disaster management of large underground limestone mine (석회석광산 지하대형공간의 재난관리를 위한 업무영향력 분석)

  • Lee, Seong-Min;Kim, Sun-Myung;Lee, Yeon-Hee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.613-623
    • /
    • 2013
  • As Limestone mines have been operated with various environmental, societal and managemental problems depending on their characteristics and developing methods, many great efforts have been applied to solve these problems. Installing the mining facilities underground is one of the successful efforts to keep the sustainable limestone mine development. This effort could reduce these problems. However, unfortunately it made an side effect of constructing a large underground space in mining site. Moreover, this space caused a necessity of various disaster managements for the safety of workers and facilities. This study introduces the priority list of a limestone mining process if there are disasters in underground mining site. This result is coming from the risk assessment and business impact analysis on survey data which were obtained from the miners of that particular limestone mine. According to the result, the highest risk is 'disregard of safety guidelines in crushing & classifier process'. The result also shows the highest priority business, above all things, is 'a pit linked work of in & out process'.

Development of Maintenance Scenario Method for Small and Medium-sized Bridges Using Risk Matrix (리스크매트릭스를 활용한 중소규모 교량의 유지관리 시나리오 기법 개발)

  • Park, Hyun-Chan;Shin, Byoung-Gil;Cho, Choong-Yuen;Kim, Young-Min;Chang, Buhm-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.6
    • /
    • pp.161-168
    • /
    • 2021
  • This paper is a maintenance system for bridge represented by Class 3 and other than by law bridges. Domestic bridge are divided into Class 1 & 2 bridges and Class 3 & other than by law bridges. The number of type 3 and other than by law bridges is very large. But, it is considered to be of relatively low importance compared to Class 1 & 2 Bridge Bridge. So, in this paper is propose a maintenance system and procedure for small & medium-sized bridges. However, because the number of small & medium-sized bridges is large, it is not possible to evaluate the performance of all bridges like Class 1 & 2 bridge. The reason is the lack of manpower and budget. Based on the Risk Matrix method, a maintenance procedure was created to select the bridge for which performance evaluation should be performed first. For this purpose, basic information of the bridge is used. And, the developed maintenance procedures were applied to the bridges in actual use.

Priority Analysis of Supply Chain Risk Management for Business Using AHP (공급사슬 리스크 관리에 관한 우선순위 분석)

  • Ji-Yeong Ko
    • Korea Trade Review
    • /
    • v.47 no.3
    • /
    • pp.17-35
    • /
    • 2022
  • The Pandemic crisis caused by COVID-19 has raised awareness of the importance of supply chain risk management, such as the control of movement between countries and the simultaneous manufacturing paralysis in the world. Effective risk management within the supply chain of the company is a core competency in the global environment. Therefore, this study quantitatively analyzed the perspective of domestic large corporations and small and medium enterprises (SMEs) by using the hierarchical analysis method (AHP) to identify the factors that should be considered as the priority when establishing supply chain risk management plans for large and small business employees. In order to conduct the study, a survey was conducted on large corporations and small and medium enterprises in Gyeongnam and Busan, and AHP analysis was conducted using Microsoft 365 excel program. In addition, Mann-Whitney U test (independent sample-nonparametric test) was conducted using SPSS/18 version of statistical package program for comparative analysis between groups. As a result, the priority was highly evaluated in the order of financial ability, competitiveness, disaster in the overall priority evaluation. There were statistically significant differences in internal risk and strategic decision making of supply chain between groups. This suggests that fandemics such as COVID-19 can not be predicted, but strategic responses are needed to utilize opportunities expressed in the crisis through supply chain risk management and to increase the competitive advantage of domestic companies even in the crisis.

Analysing Decision Making Factors of IT Investment Projects (IT 프로젝트의 기본속성과 사전타당성 분석결과가 투자의사결정에 미치는 영향요인)

  • Koo, Bon-Jae;Lee, Kuk-Hie
    • Information Systems Review
    • /
    • v.9 no.1
    • /
    • pp.161-189
    • /
    • 2007
  • The purposes of this dissertation are to identify various factors affecting the outcomes of feasibility analysis and investment decision makings of new IT project plans and empirically analysis the relationships among them. 9 variables which have been drawn from prior studies and industry practices are the amount of the necessary resource such as development budget and time, the expect financial benefits, the degree of alignments between IT projects and the business strategy, the estimated risk, and the investment priority as the dependent variable. Data from 125 IT projects of K bank, the leading commercial bank in Korea, have been collected and Regression Analysis and ANOVA have been performed. As results, 5 out of 8 hypothesis have been accepted partially or totally.

A Study on the Selecting Factors of Manufacturing and Logistic Hub in Far Eastern Area (극동지역 제조 및 물류거점 선정요인 중요도 분석에 관한 연구)

  • Kim, Hak-so;Han, Ji-young
    • Journal of Korea Port Economic Association
    • /
    • v.32 no.4
    • /
    • pp.29-39
    • /
    • 2016
  • As geopolitical, archaeological and strategic interests on cooperation with countries in the Far Eastern Area is gradually increased, countries are competing to attract or install a logistics or manufacturing hub in their countries. In this study, we investigated the relative importance of factors on the main three and nine detailed criteria from the domestic and overseas experts on Far Eastern Area. Using AHP(Analytic Hierarchy Process) analysis, priority importance of factors was derived. As a result, we find that the most important factor was economic factor. In detail, industrial complex creation was the highest factor and the institutional guarantees for the investment on policy and transportation network was second highest factor. Based on analysis result, specific competitiveness level in the 10 region of Far East was follows. Hunchun, Vladivostok, Yanji, Tumen, Rajin, Hassan, Ussuriysk, Cheongjin, Mihaylov Skiing, Nije Jeuchinski were showed in order. Hunchun showed the highest competitive level in location, topography, compliance to the around cities, transportation network, industrial complex, excellence in logistics facilities, long-term investment plans, institutional guarantees for investment, customs efficiency and political stability. However, in other factors such as population and number of households, public facilities, potential demand and resource utilization, Vladivostok showed the highest level.

Design on Fixed Quantity Analytical Model for Information System Audit (정보시스템 감리의 정량화 분석 모델 설계)

  • Kim, Hee-Wan;Lee, Hae-Man;Kim, Dong-Soo
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.2
    • /
    • pp.88-100
    • /
    • 2011
  • This thesis suggests fixed quantity model and detailed performance procedures of an information system audit. In addition, an identification of the check-items with high operating risk and factors that might lead to serious effects on the business are made. Then, this thesis proposes the information system audit model that can grant priorities. By using this model, the orderer can evaluate objectively with digitized mark. The model can improve the effectiveness, reliability, and objectivity of the audit by minimizing the discrepancies of different opinions about audit evaluation results between auditee and the orderer. The proposed model is adapted to an application system and audit projects of the database construction. As a result, the model has received an equal mark from the result of the general reviews, thus the propriety of the proposed model was verified.

Design of Crossbar Switch On-chip Bus for Performance Improvement of SoC (SoC의 성능 향상을 위한 크로스바 스위치 온칩 버스 설계)

  • Heo, Jung-Burn;Ryoo, Kwang-Ki
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.3
    • /
    • pp.684-690
    • /
    • 2010
  • Most of the existing SoCs have shared bus architecture which always has a bottleneck state. The more IPs are in an SOC, the less performance it is of the SOC, Therefore, its performance is effected by the entire communication rather than CPU speed. In this paper, we propose cross-bar switch bus architecture for the reduction of the bottleneck state and the improvement of the performance. The cross-bar switch bus supports up to 8 masters and 16 slaves and parallel communication with architecture of multiple channel bus. Each slave has an arbiter which stores priority information about masters. So, it prevents only one master occupying one slave and supports efficient communication. We compared WISHBONE on-chip shared bus architecture with crossbar switch bus architecture of the SOC platform, which consists of an OpenRISC processor, a VGA/LCD controller, an AC97 controller, a debug interface, a memory interface, and the performance improved by 26.58% than the previous shared bus.