Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects - (리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 -)

  • Cho, Kyu-Man;Kim, Tae-Hoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.4
    • /
    • pp.385-394
    • /
    • 2018
  • There have been frequent reports of schedule delays due to various risks of remodeling projects, which are different from new construction. Therefore, this study was carried out to analyze the risk factors inherent in the remodeling project and the likelihood of schedule delay occurrence in the remodeling construction work. To analyze the relationship between the risk factors and the likelihood of schedule delays of remodeling projects, (1) a prototype of the office building remodeling work was developed through the analysis of existing case and literature, (2) a questionnaire survey was conducted on 29 construction managers who have been or are currently conducting remodeling projects, and (3) after evaluating the reliability of the collected questionnaire results, the relationship between the two elements, which denotes (i) likelihood of schedule delays per each work, (ii) importance of risk factors, and (iii) risk factors affecting schedule delay in remodeling work, was suggested. Using the results of this study, it is expected to develop a plan for preventing the schedule delay of the office building remodeling work through control the risk factors that may cause schedule delays.