Study on Constraints Analysis Classification for PPC Improvement (작업계획달성률 향상을 위한 작업제반요건 분류에 관한 연구)

  • Han, Jung-Hun;Kim, Dea-Young;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.252-255
    • /
    • 2008
  • The purpose of construction project management is to achieve planned quality by adequate cost and schedule of the project, thus the effective time management is a critical factor to actualize the object. But the traditional time management by using milestone has several limitations which are not sufficiently considered mutual relation and variated from the task. On this wise, applying the concept and principles of lean construction to the project will be the best way not only reduce waste and variation, but also improve the productivity and ability to overcome limitation as mentioned above. Thus the study, Last Planner System, specially focuses on constraint analysis which is used in lookahead planning system. The results of this research will provide the constraints classification that is able to improve work reliable and percent plan complete when time planning by controlling constraints of project.

  • PDF

The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed) (작업성취율 측정을 위한 공정관리절차의 개선 방안)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.722-726
    • /
    • 2006
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

  • PDF

Framework of Owner-driven Lean Construction for Plant Construction (발주자 주도형 린 건설에 대한 기초 연구;플랜트 건설공사를 중심으로)

  • Ryu, Chung-Kyu;Han, Seung-Heon;Park, Jung-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.647-651
    • /
    • 2007
  • The Lean Construction is adopted from Lean Principle of Manufacturing Industry in the early of 1990, that has been providing theoretical background and good practical implementation for maximizing customers' satisfaction and improving productivity through minimizing the waste factors in the construction operations. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research is propose a framework for implementation of LPS conducted by owner in plant construction.

  • PDF

Deployment of Lean System for Effective Lean Construction Implementation (효과적인 린 건설 수행을 위한 린 시스템 운용 방안 제시)

  • Kim, Dae-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.152-159
    • /
    • 2005
  • Since Lean Construction has been introduced as a new management approach to improve productivity in the construction industry, much research is in progress to develop lean concepts and principles for better implementation and to get results of the successful adaptation of lean ideas from manufacturing for application in the construction industry. Currently, Lean Construction Institute developed Last Planner System to achieve better workflow and effective planning management. Domestic construction companies are also getting interested in the Lean Construction. However, there are no detailed guidelines how to implement lean system. Thus, this study will provide a guideline for deployment of last planner system, a prototype lean implementation control checklist, and all project participants roles based on the case studies in USA. This study should provide a framework to apply lean construction to domestic construction sites.

Owner-driven Lean Construction based on Participants' Needs Analysis (건설주체간의 니즈분석을 통한 발주자 참여형 린 건설 연구)

  • Lee, Kang-Woo;Ryu, Chung-Gyu;Park, Hee-Dae;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.222-226
    • /
    • 2008
  • The construction industry has remained stagnant for a long time. So many researchers have wanted to solve this problem not only focusing on enhancement of construction process, but also introducing the culture of cooperation. The Last Planner System(LPS), one of the elementary techniques of Lean Construction, aims for improving the work reliability and reducing variability by measuring and managing the daily or weekly performance for overcoming the weakness of recent complex schedule management tools such as Critical Path Method. This research propose a framework for implementation of LPS conducted by owner focused on construction stage and introduce optimal owner participation model in plant construction, based on needs analysis for construction participants. Furthermore, this research introduce a modified needs analysis, so called IPBA(Importance-Performance-Betterment Analysis), and an advanced LPS procedure which add the needs analysis during pre-LPS and(or) main LPS stages.

  • PDF

Innovation of Project Management - Lean Construction (공사관리체계의 새로운 접근 - 린 건설)

  • Kim Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.113-119
    • /
    • 2003
  • Since Lean Construction has been introduced as a new management approach to improve productivity in the construction industry, much research is in progress to develop lean concepts and principles for better implementation and to get results of the successful adaptation of lean ideas from manufacturing for application in the construction industry. Currently, several construction companies in the USA have applied the Last Planner System (LPS), a decentralized system developed by the Lean Construction Institute. Thus, there are demands to share information how other companies implement lean construction, to identify the benefits and barriers of lean implementation in the construction fields, and finally to improve their lean implementation. This study carried out case studies to assess current lean construction projects with the objective to find out how effectively and to what extent lean construction is being adapted by the construction industry. This study will only introduce the Last Planner which has four levels in the LPDS, findings based on interviews with project participants, and observations from the projects. This study will also provide empirically identified success factors associated with lean implementation on the construction site. Finally, the recommendations are offered to support the effort of adaptation of lean construction in the domestic construction industry. Even though lean construction still stood on the bridge crossing from current practice to lean practice, it is the researcher's conviction that lean construction would be successfully adapted to the construction industry in the near future and would be recognized as an effective management innovation.

  • PDF