• Title/Summary/Keyword: 도로 계획

Search Result 3,290, Processing Time 0.04 seconds

GIS Application for Planning Roadway Construction (도로 공사의 시공계획을 위한 GIS의 적용)

  • Kang Sang-Hyeok;Seo Jong-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.565-568
    • /
    • 2003
  • Roadway construction planning processes involve a large amount of information on design, construction methods, quantities, unit costs, and production rates. GIS (Geographic Information System) is a strong tool for integration and managing various types of information such as spatial and non-spatial data required for roadway construction planning. This paper proposes a GIS-based system for improving roadway construction planning with its 'Spatial Analysis' and 'Visualization' functions. The proposed system cail help construction planner make a proper decision in a unique way by integrating design information and construction information within the system and creating design element modules for space scheduling purposes in real-time with its 'Interactive Planning' function.

  • PDF

Evaluation of Road Plan using Information Measure Technique and GIS (정보계측기법과 지리정보시스템을 이용한 도로계획의 평가)

  • Na, Joon-Yeop
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2007.10a
    • /
    • pp.239-246
    • /
    • 2007
  • 공공시설 중 도로계획의 경우 건설과정 및 건설 후의 소음 및 오염 등의 환경 사회적 비용 및 주행성 안전성 등 요소의 평가 등을 수량화가 어려운 대표적 비용으로 들 수 있는데 본 연구에서는 이러한 수량화가 어려운 비용 효과들을 포함하여 고려한 도로노선계획결과를 정보계측기법과 지리정보시스템을 이용하여 '정보량'이라는 통일된 단위로 표현하고, 기존 시설물과의 관계로부터의 '정보편익' 개념으로 평가하였다. 정보계측기법은 인간은 언어를 통하여 모든 사물을 정보로 표현하므로 '정보'라는 통일 된 단위를 사용하여 모호한 가치를 평가해 보고자 하는 방법이며, 따라서 공공시설의 계획과정에서 최적해를 찾기 위한 비용, 편익 및 환경 사회적 요소 등의 정량화되기 어려운 가치를 평가하는데도 사용될 수 있을 것이다. 정보계측기법과 지리정보시스템을 이용하여 도로건설시 발생하는 비용과 직접효과를 고려하기 위하여 시설정보계측모형을 개발하였으며, 도로 주변 시설간의 편익을 고려하기 위하여 시설정보편익모형을 구성하였다. 개발된 모형을 실제 도로계획 사례에 적용한 결과 비용과 직접효과만을 고려한 시설정보계측모형에서는 기존의 도로설계와 유사한 결과가 도출되었으며, 시설정보편익모형에서는 기존의 도로계획 평가에서 고려할 수 없었던 요소들에 대한 고려가 가능하였다.

  • PDF

A Study of Index Selection and Application Plan for Environment Friendly Road Construction Plan (친환경적 도로건설계획을 위한 지표 선정 및 적용 방안 연구)

  • Joo, Yongjoon;Sagong, Hee;Choi, Joongyu;Hwang, Giwon
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.5
    • /
    • pp.354-364
    • /
    • 2017
  • Considerable amount of resources on roads, basic infrastructure, to promote economic development and distribution of goods is invested. Despite the necessity, its undesirable side effects are various environmental problems In order to efficiently evaluate these problems more than before, planning indictors for environment-friendly road constructions is proposed in this study. First, we make an investigation into real-life cases where the extracted planning indicators were applied. Second, it is suggested that an alternative assessment method efficaciously evaluate and/or adopt extracted planning indictors on road construction projects. Finally, criteria to determine environmental impacts with respect to planning indicators and apply them into real cases is proposed. This study has its significance in upgrading past pro-environmental indictors for road construction, suggesting reasonable applications of planning indicators, and setting criteria to determine environmental impacts based on planning indicators.

Development of Evaluation Model for Road Plan using Information Measurie Technique and GIS (정보계측기법과 지리정보시스템에 의한 도로계획의 평가모델 개발)

  • Na, Joon-Yeop
    • Spatial Information Research
    • /
    • v.16 no.1
    • /
    • pp.1-10
    • /
    • 2008
  • `Information measure model' and 'Information benefit model' for road plan are developed. In result of application to actual road project, 'Information measure model' showed same result with actual road plan, it can express qualitative element by 'Information' like safety, public discontent, etc. and 'Information benefit model' can evaluate present plan in the side of provider's and demader's 'benefit'.

  • PDF

A Study of the Autonomous Driving Path Planning for Concrete Pavement Cutting Operation (콘크리트 도로 표면절삭 작업을 위한 자율주행 진로계획 수립방안)

  • Moon, Sung-Woo;Seo, Jong-Won;Yang, Byong-Soo;Lee, Won-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.929-933
    • /
    • 2007
  • Concrete Pavement Cutting Operation have Labor-intensive features. And Cutting Operation quality and productivity is influenced by operator's experience. Moreover Workers have risk of safety concerns. Therefore we need Concrete Pavement Cutting Operation automation system and system support software development on the economics. First of all we have to develop driving Path Planning for Concrete Pavement Cutting automation system. If result of Path Planning connect with automation system, Weak points is a complement to the existing Path Planning and we can obtain effective automation system. Consequently this paper suggest method of Autonomous Driving Path Planning for Concrete Pavement Cutting Operation And the Path Planning system application.

  • PDF

Optimal Path Planning Algorithm for Visiting Multiple Mission Points in Dynamic Environments (동적 변화 환경에서 다중 임무점 방문을 위한 최적 경로 계획 알고리즘)

  • Lee, Hohyeong;Chang, Woohyuk;Jang, Hwanchol
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.47 no.5
    • /
    • pp.379-387
    • /
    • 2019
  • The complexity of path planning for visiting multiple mission points is even larger than that of single pair path planning. Deciding a path for visiting n mission points requires conducting $n^2+n$ times of single pair path planning. We propose Multiple Mission $D^*$ Lite($MMD^*L$) which is an optimal path planning algorithm for visiting multiple mission points in dynamic environments. $MMD^*L$ reduces the complexity by reusing the computational data of preceding single pair path planning. Simulation results show that the complexity reduction is significant while its path optimality is not compromised.

Empirical Comparisons between Partial-Order Planning and Graph Planning in Freight Transportation Domain (화물운송 영역에서의 부분순서 계획법과 그래프 계획법에 대한 실험적 비교)

  • 이상기;정용규;김인철
    • Proceedings of the Korea Database Society Conference
    • /
    • 1999.06a
    • /
    • pp.325-333
    • /
    • 1999
  • 본 논문에서는 응용범위가 넓고 비교적 복잡도가 높은 화물운송 계획문제들을 대상으로 몇 가지 실험을 통해 대표적인 인공지능 계획방식인 부분순서 계획법과 그래프 계획법의 성능을 비교 분석하였다. 또 동시에 이러한 실험을 통해 DVO 및 LPVO와 같은 대표적인 제어전략들을 중심으로 이들이 그래프 계획법의 성능에 미치는 효과를 비교 분석하여 보았다. 본 연구의 실험을 통해서는 부분순서 계획법에 비해 그래프 계획법이 메모리 사용량이나 CPU 계산시간 면에서 월등히 우수한 성능을 보여주었으며 비교적 복잡도가 큰 계획문제에서도 좋은 결과를 보여주었다. 하지만 도출된 해 계획의 질적인 면에서는 부분순서 계획법이 대부분 최적의 해를 찾아낸 것에 반해 그래프 계획법은 사용된 제어전략과 최적화 방법에 따라 해 계획의 질이 크게 달라질 수 있음을 보였다. 한편 그래프 계획법에서는 부속목표 선택 전략인 DVO는 그 효과를 뚜렷이 보이지 못한 반면 동작 선택 전략인 LPVO는 도출된 해 계획의 질적인 면이나 계산속도 면에서 모두 뛰어난 효과를 보여주었다.

  • PDF

Empirical Comparisons between Partial-Order Planning and Graph Planning in Freight Transportation Domain (화물운송 영역에서의 부분순서 계획법과 그래프 계획법에 대한 실험적 비교)

  • 이상기;정용규;김인철
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 1999.03a
    • /
    • pp.325-333
    • /
    • 1999
  • 본 논문에서는 응용범위가 넓고 비교적 복잡도가 높은 화물운성 계획문제들을 대상으로 몇 가지 실험을 통해 대표적인 인공지능 계획방식인 부분순서 계획법과 그래프 계획법의 성능을 비교 분석하였다. 또 동시에 이러한 실험을 통해 DVO 및 LPVO와 같은 대표적인 제어전략들을 중심으로 이들이 그래프 계획법의 성능에 미치는 효과를 비교 분석하여 보았다. 본 연구의 실험을 통해서는 부분순서 계획법에 비해 그래프 계획법이 메모리 사용량이나 CPU 계산시간 면에서 월등히 우수한 성능을 보여주었으며 비교적 복잡도가 큰 계획문제에서도 좋은 결과를 보여주었다. 하지만 도출된 해 계획의 질적인 면에서는 부분순서 계획법이 대부분 최적의 해를 찾아낸 것에 반해 그래프 계획법은 사용된 제어전략과 최적화 방법에 따라 해 계획의 질이 크게 달라질 수 있음을 보였다. 한편 그래프 계획법에서는 부속목표 선택 전략인 DVO는 그 효과를 뚜렷이 보이지 못한 반면 동작 선택 전략인 LPVO는 도출된 해 계획의 질적인 면이나 계산속도 면에서 모두 뛰어난 효과를 보여주었다.

  • PDF

Development of Multiple Regression Models for the Prediction of Flood Control Capacity with Land Use Plan in the Development of Complex Area (단지개발에서 토지이용계획을 고려한 홍수조절용량 예측 다중회귀모형 개발)

  • Park, Yong-Soo;Lee, Chung-Hee;Park, Young-Jin
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.740-745
    • /
    • 2006
  • 최근 중 소규모의 도시개발, 택지개발, 유통단지, 산업단지, 주택단지 조성 등의 단지개발이 급속히 증가하고 있으며, 이에 따라 재해영향평가 및 사전재해영향성 검토도 증가하고 있는 실정이다. 단지개발은 보통 지구지정 또는 기본계획을 수립하여 개발계획 승인을 받고 실시설계를 통하여 실시계획을 승인을 받는 절차를 갖는다. 이에 효율적인 토지이용계획을 위하여 개발계획 승인전에 수십 회의 토지이용을 변경하고 또한 실시계획승인 전에도 토지이용계획은 수회의 변경을 통하여 이루어진다. 이에 재해영향평가 및 사전재해영향성검토를 초기단계에서 수행하는 실무자들은 토지이용계획의 빈번한 변경으로 인하여 저류지 규모 산정에 어려움을 가지고 있다. 단지개발의 토지이용계획 특성상 투수지역이 다소 있는 단지, 투수지역인 공원 녹지, 불투층인 도로 주차장으로 주로 구성된다는 공통점이 있다. 따라서 최근의 심의 완료된 재해영향평가보고서들을 인용, 각 단지개발의 토지이용계획도를 고려한 저류지 홍수조절용량을 산정하는 경험적이고 통계적인 다중회귀모형을 개발하였다. 금회 유도된 다중회귀모형식은 재해영향평가 및 사전재해영향성검토를 수행하는 실무자에게 행정계획단계뿐만 아니라 개발사업단계에서도 신속하게 저류지 규모를 개략 산정하고, 비전문가인 검토자가 신속히 홍수조절용량의 적정성을 검토하는데 매우 효과적으로 사용될 것으로 판단된다.

  • PDF