• Title/Summary/Keyword: 도로사업 모형

Search Result 97, Processing Time 0.03 seconds

Development of a Vehicle Operating Speed Model and its Application for Designing Consistent Horizontal Alignment (차량 주행속도를 반영한 도로 평면선형설계 기법 연구)

  • Choi, Jai-Sung;Kim, Sang-Youp;Lee, Jeom-Ho;Hwang, Kyung-Sung
    • International Journal of Highway Engineering
    • /
    • v.10 no.2
    • /
    • pp.57-67
    • /
    • 2008
  • At present engineers use the highway design speed concept to develop the horizontal alignment. This concept has a strength of attaining consistent horizontal alignments because of its use of a single speed value. Yet it shows a critical weakness that when opened the operating speed for the vehicles on the road can be a lot different than the design speed. To resolve this, many countries already develop the horizontal alignment by adopting procedures that weigh vehicle operating speeds, and this research joins them by developing an operating speed based horizontal alignment design. We have collected vehicle speed samples over the nation, selected some speed influential design elements by doing a statistical analysis, provided a set of models for two-lane roads and four lane roads, and showed a stepwise feedback procedure by doing a case study. It is underscored that in the case study the proposed procedure has scaled down the speed inconsistency problem, and we are of opinion that our procedure would coin both investment efficiency and speed consistency in future highway projects.

  • PDF

Development of Model for Optimal Concession Period in PPPs Considering Traffic Risk (교통량 위험을 고려한 도로 민간투자사업 적정 관리운영기간 산정 모형 개발)

  • KU, Sukmo;LEE, Seungjae
    • Journal of Korean Society of Transportation
    • /
    • v.34 no.5
    • /
    • pp.421-436
    • /
    • 2016
  • Public-Private-Partnerships tend to be committed high project development cost and recover the cost through future revenue during the operation period. In general, long-term concession can bring on more revenue to private investors, but short-term concession less revenue due to the short recovering opportunities. The concession period is usually determined by government in advance or by the private sectors's proposal although it is a very crucial factor for the PPPs. Accurate traffic forecasting should be most important in planing and evaluating the operation period in that the forecasted traffic determines the project revenue with user fees in PPPs. In this regards, governments and the private investors are required to consider the traffic forecast risk when determining concession period. This study proposed a model for the optimal concession period in the PPPs transportation projects. Monte Carlo simulation was performed to find out the optimal concession period while traffic forecast uncertainty is considered as a project risk under the expected return of the private sector. The simulation results showed that the optimal concession periods are 17 years and 21 years at 5.5% and 7% discount level, respectively. This study result can be applied for the private investors and/or any other concerned decision makers for PPPs projects to set up a more resonable concession period.

A Study on the Benefit of Driving Amenity Based on Highway Density (도로 밀도에 따른 운전쾌적성 편익에 관한 연구)

  • Cho, Hanseon
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.5
    • /
    • pp.48-59
    • /
    • 2013
  • Normally the benefits concerned in the feasibility study for highway constructions are travel time saving, vehicle operation cost, etc. which can be calculated using the simulation tool(EMME3). However, there must be extra benefits of driving amenity improvement that drivers can perceive through decreasing driving fatigue and improving driving comfortability. In this study, the definition of driving amenity was established and a method of estimation for the benefit of driving amenity improvement was developed. Highway type (urban/rural highway) and highway density was considered to estimate the driving amenity. And Double-bounded Dichotomous Choice among Contingent Valuation Method(CVM) was applied to survey the willingness-to-pay of drivers when highway density decreases. Finally the value of driving amenity was estimated using the results of survey and logit medel. As the existing highway density is high, willingness-to-pay increases in both urban and rural highways. Even though the changing rates of highway density are same, willingness-to-pay is different based on the existing highway density.

Freeway Crash Frequency Model Development Based on the Road Section Segmentation by Using Vehicle Speeds (차량 속도를 이용한 도로 구간분할에 따른 고속도로 사고빈도 모형 개발 연구)

  • Hwang, Gyeong-Seong;Choe, Jae-Seong;Kim, Sang-Yeop;Heo, Tae-Yeong;Jo, Won-Beom;Kim, Yong-Seok
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.2
    • /
    • pp.151-159
    • /
    • 2010
  • This paper presents a research result that was performed to develop a more accurate freeway crash prediction model than existing models. While the existing crash models only focus on developing crash relationships associated with highway geometric conditions found on a short section of a crash site, this research applies a different approach considering the upstream highway geometric conditions as well. Theoretically, crashes occur while motorists are in motion, and particularly at freeways vehicle speed at one specific point is very sensitive to upstream geometric conditions. Therefore, this is a reasonable approach. To form the analysis data base, this research gathers the geometric conditions of the West Seaside Freeway 269.3 km and six years crash data ranging 2003-2008 for these freeway sections. As a result, it is found that crashes fit well into Negative Binomial Distribution, and, based on the developed model, total number of crashes is inversely proportional to highway curve length and radius. Contrarily, crash occurrences are proportional to tangent length. This result is different from existing crash study results, and it seems to be resulted from this research assumption that a crash is influenced greatly by upstream geometric conditions. Also, this research provides the expected effects on crash occurrences of the length of downgrade sections, speed camera placements, and the on- and off- ramp presences. It is expected that this research result is useful for doing more reasonable highway designs and safety audit analysis, and applying the same research approach to national roads and other major roads in urban areas is recommended.

A Path-based Traffic Flow Simulation Model for Large Scale Network (기종점 기반 대규모 가로망 교통류 시뮬레이션 모형)

  • 조중래;홍영석;손영태
    • Journal of Korean Society of Transportation
    • /
    • v.19 no.3
    • /
    • pp.115-131
    • /
    • 2001
  • The Purpose of this study is to develop a simulation model for large-scale network with interrupted flow as well as uninterrupted flow. The Cell Transmission(CT) theory is used to simulate traffic flow. Flow transition rules have been newly developed to simulate traffic flows at merging and diverging sections, and signalized intersections. In the model, it is assumed that dynamic OD table is exogenously given. Simulation results for toy network shows that the model can explain queue dynamics not only in signalized intersections of urban arterials, but also in merging and diverging sections of freeway. In case study, the model successfully simulated traffic flows of 145,000 vehicles on CBD network of city of Seoul with 74 traffic zones, 133 signalized intersections among 395 nodes and 1110 links.

  • PDF

A Study on Differences of Economic Benefits by Volume Calibration in Road Construction Projects (도로시설 규모산정에 있어서 교통량 정산과정에 따른 경제적 편익 차이에 관한 연구)

  • Kim, Sang-Gu;Kim, Geun-Deok
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.5
    • /
    • pp.7-16
    • /
    • 2009
  • This paper proposes a plan which can raise the accuracy of economic benefit estimation in road construction projects. The point of existing economic appraisals may be that the speeds forecasted by models are different from the field speeds because only volumes are calibrated in the road network. The result of such a calibration has an influence on estimating wrong economic benefits in terms of vehicle operating cost savings, travel time savings, and air pollution savings. Then this study performs a calibration when volumes are at the same amount but the calibration between the field speeds and model speeds is different from each other with two different volume-delay functions; the differences of benefits are confirmed according to two different speed calibrations. Three improvement schemes, including the development of a new volume-delay function, are proposed in this study in order to solve the problem of current benefit calculations. The outcome of this study will help practitioners perform more accurate benefit calculations and reasonable economic appraisals.

Estimation of Perceived Curve Radius Considering Visual Distortion at Curve Sections (곡선부 시각왜곡현상을 고려한 인지곡선반경 산정에 관한 연구)

  • Shin, Jae-Man;Park, Je-Jin;Son, Sang-Ho;Ha, Tae-Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.395-402
    • /
    • 2010
  • The seriousness of a traffic accident appears relatively higher on the curve sections compared with the straight sections due to a change in speed caused by a change in the driver's sight. In particular, the visual distortion phenomenon, one of the dangerous factors taking place on the curve sections, appears different according to the road's geometric design. Although it is a genuinely principal design factor which should be necessarily considered in designing a road, the previous researches on establishing the design standards for it have been insufficiently conducted. As a result, the establishment of the road design standards for the curve sections considering the sight distortion phenomenon is desperately required. This research examined the previous researches on the driver's behaviors, the driver's sight characteristics and the perceived curve radius on the curve sections, and developed the theoretical model of perceived curve radius to which a mathematical technique is applied in consideration of the visual distortion phenomenon on the two-lane curve sections in a local area. In addition, after the theoretical visual distortion was calculated on the basis of the theoretical model of perceived curve radius, the range of error on the theoretical recognition radius model formula was verified through comparing it with the previous researches' experiential visual distortion level and analyzing both of them. As a result, it was observed that as the curve radius practically increases in the theoretical recognition curve radius, the range of error tends to go down, which reflects well the characteristics of the curve sections on the road. Based on this research, it is expected that this research will be helpful to eliminate the safety defects when designing the curve sections and contribute to develop the road design standards considering human factors in the future.

Flow Analysis in Road Gutter Storage Using Fluent Model (Fluent 모형을 이용한 도로 측구 저류조에서의 흐름 분석)

  • Kim, Jung Soo;Lee, Min Sung;Han, Chyung Such;Yoo, In Gi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.234-234
    • /
    • 2022
  • 도로에서의 우수를 원활하게 처리하기 위해서 빗물받이 및 연결관 등의 노면 배수시설이 설치되고 있으며, 노면 배수는 측구부를 통해 흘러 빗물받이 유입부로 차집되고 연결관을 통해 하수관거로 배수된다. 그러나 최근 국내 기상패턴의 변화로 국지성 집중호우와 같이 시간당 강우량 증가로 도로부와 저지대에서 배수시설의 배수불량에 따른 도심지 내수침수 피해가 발생하고 있다. 이에 정부에서는 다양한 우수관거 개선사업, 빗물펌프장, 지하저류조와 같은 방재시설을 설치하고 있으나 우수유출저감시설은 대규모 예산이 소요되고 실제 침수지역에 피해 저감효과에 대한 효용성 문제에 대한 제기뿐만 아니라 과밀화된 도심지에서는 지하공간 활용에 한계가 있는 실정이므로 도심지의 다양한 공간을 활용한 도시 배수 및 저류시설에 대한 연구가 필요하다. 따라서 본 연구에서는 유휴 공간인 도로 측구부 공간을 활용하여 도로 노면수를 저류 및 지체할 수 있는 노면수 측구 저류시설의 개념을 제시하고 측구저류조의 활용성을 판단하기 위하여 빗물받이 유입구, 빗물받이, 측구 저류조 및 빗물받이와 측구저류조 연결부에서의 노면수 유입, 유출 및 저류 등의 다양한 흐름 변화를 확인하기 위하여 Fluent 모형의 적용성을 분석하였다. 수치모의 전체 형상은 50x50cm 크기의 빗물받이를 기준으로 양쪽에 2m 길이의 측구 저류조를 원형관으로 연결하여 1/5 축소모형으로 구성하고 격자는 빗물받이 유입부, 빗물받이 및 측구 저류조 내부의 복잡한 3차원 흐름을 모의하기 위해 사면체와 육면체로 조밀하게 생성하였다. 다상유동해석을 위해 VOF(Volume of Fluid)방법을 적용하였고, 수치해석 방법으로는 비정상류, 난류 모형으로는 SST k-ω모형을 적용하였다. 수치모의 조건으로는 설계빈도별(5~30년) 우수유출량을 산정하여 유입 유량별 기존 빗물받이 유입부에서의 유입흐름, 빗물받이 내부에서의 와 발생흐름, 측구 저류조 및 연결관에서의 흐름을 구현하여 분석하였다. 수치모의 결과 빗물받이 유입부에서 연결관을 통한 측구 저류조로 유입되는 유입흐름과 빗물받이 하단부의 배수관을 통해 유출되는 흐름을 정상적으로 구현하였으며, 빗물받이 유입부 및 측구 저류조 연결관에서의 유속변화도 확인할 수 있었다. 또한 빗물받이와 측구 저류조에서 다양한 흐름을 구현하기 위한 Flunet 모형의 적용성을 검토하였으며, 향후 수리실험을 통하여 실제 흐름과의 매개변수 최적화 및 다양한 도로 조건의 변화를 고려한 수치모의 분석을 통하여 지속적인 모형의 검증이 가능할 것으로 판단된다.

  • PDF

A Study on the Optimum Route Determination using Digital Terrain Model (수치지형모형을 이용한 최적노선선정에 관한 연구)

  • 정영동;박정남;박성규;김진기
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.11 no.2
    • /
    • pp.17-26
    • /
    • 1993
  • This study aims to develop an effective model of the optimum route determination by using digital terrain model. So in this study I select testing areas and analyse comparing the usual method with the digital terrain model method. And then I present one of the optimum route determination models by analysing an anticipated view and other roads according to the development plan. In usual method, the selected area was analysed by using panoramic terrestrial and aerial photograph. But in this study I represent the present terrain by using digital terrain materials which was acquired by a check form map of the selected area, and predict the route line according to the view points by using basic development plan. As a result of using the digital terrain model method in the optimum route determination with terrestrial photograph, it is possible to explain the terrain in detail when the present conditions terrain is analysed. As we can anticipated many sided road in large scale development plan with digital terrain materials which was used in analysing the present terrain, it is possible to lead to more effective route planning, landers planning and the optimum road determination than the usual method in the basic plan.

  • PDF

The Method of Results of Decision Reflections Between PI Project Valuation Groups Using AHP (AHP를 활용한 PI사업 평가그룹간 의사반영 방안)

  • Kim, Kwan-Joong;Jang, Myung-Soon
    • International Journal of Highway Engineering
    • /
    • v.8 no.4 s.30
    • /
    • pp.145-157
    • /
    • 2006
  • Generally, the method of the policy analysis has been used for making a policy decision of the development project of the road through the expert interview based on AHP. According to introducing PI, the study of the method of the integrating process for various opinion of the related groups is required. On this study I evaluate what is a difference between the results of integrated process and the AHP analysis on what is major considering factor in decision-making process. From the analysis, each evaluate factor is in level of significance by ANOVA. First, there is a significance level difference between Group A, C and Group B Second, there is also a significance level difference on the result of AHP analysis for each group in order to evaluate by integrated method. Finally, the method of AHP analysis which considers priority factor is expected as to be useful tool on decision-making of various group.

  • PDF