• Title/Summary/Keyword: 도로계획

Search Result 846, Processing Time 0.032 seconds

Consideration about the Fire Lane Plan and the Conformability - A Case Study on Daegu Metropolitan City Buk-gu - (소방차전용출동경로의 계획기법 및 적합성 검토에 관한 연구 - 대구광역시 북구를 대상으로 -)

  • Jeong, Gun-Sik;Kim, Han -Su
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.5
    • /
    • pp.83-90
    • /
    • 2010
  • The purpose of this study is to establish the standard of fire lane design to improve the performance of disaster prevention in local area. To accomplish it, we have focused on three research methods as below: first, we have expected disaster occurrence based on emergency tendency in local area; second, we have verified fire lane routes design through fire lane modeling and network analysis; third, we have quantitatively examined a possibility of danger of fire lanes through current road network modeling and analysis. The result of this study could be helpful to effective fire lane designs and quantitative analyses.

Characteristics of Roadside Non-point Pollution and Applicability of Reduction Facilities in Paldang Water Source Protection Zone (팔당 상수원 보호구역내 도로비점오염의 특성 및 저감시설의 적용성 연구)

  • Cho, Hye Jin;Song, Meeyoung
    • Ecology and Resilient Infrastructure
    • /
    • v.7 no.4
    • /
    • pp.294-299
    • /
    • 2020
  • Based on the combined results of field surveys and analyses of the road structure and traffic flow, we propose a new plan for reducing roadside non-point pollution in the Paldang Water Source Protection Zone. The results show that the soil surrounding the roads in Paldang is highly permeable, which mitigates the need for filtration facilities. Roads flanked by steep slopes are found to facilitate the reduction of non-point roadside pollution through vegetation and soils along road slopes without the need for pollution reduction facilities. These results highlight the need for a flexible roadside non-point pollution reduction plan for roadside non-point pollution, which can be tailored to compliment relevant regulations and design standards after analyzing the characteristics of the target road.

Application of Mote Carlo Simulation to Efficiently Estimatc Highway Investment Cost (Monte Carlo 시뮬레이션을 사용한 도로 투자비 추정 합리화 방안)

  • 서선덕
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.03a
    • /
    • pp.61-64
    • /
    • 1998
  • 도로의 건설을 위해서는 통상 타당성조사, 기본계획, 기본설계 및 시공의 여러 가지 단계를 밟는다. 이들 각 단계를 거치면서 일반적으로 투자비 추정액은 실제 공사비와 더욱 근접하게 되게 되나, 타당성조사 등 계획단계에서의 추정액은 실제 공사비와 상당한 차이를 보이는 것이 일반적이다. 이러한 차이는 계획물량의 추정이나, 단가의 추정 등에서도 발생할 수도 있고, 구체적인 지질조사 등이 없는 상태에서 가정한 지질조건이나 공사조건 등에 대한 불확실성으로 인해 발생한다. 현재의 일반적인 관행은 이러한 투자비 추정단계에 작용하는 불확실성을 명시적으로 고려하여 투자비 추정치의 확률적인 분포를 산정하지 않고, 하나의 확정적인 추정치만 제시하고 있어 제시된 추정치의 신뢰도를 확인하기가 곤란하다. 본 연구에서는 현재의 관행과는 달리 투자비추정에서 관여하는 불확실성을 확률분포를 사용하여 명시적으로 고려하여 추정된 투자비에 대한 확률분포를 명시적으로 파악하려는 노력을 하였다. 추정된 투자비에 대한 확률분포는 Mont Carlo 시뮬레이션 방법을 이용하여 분석하였으며, 연구의 결과와 현재 각 계획단계에서 일반적으로 용인되는 추정오차와의 관계도 분석하였다. 결과에 근거하여 도로사업에 대한 투자비 추정을 효율적으로 할 수 있는 방법을 제시하였으며, 추가적인 연구방향도 제시하였다.

  • PDF