• Title/Summary/Keyword: 댐주변지역

Search Result 3, Processing Time 0.024 seconds

The Influence Analysis of Support Working Expenses for Yongdam Dam Area Considering the Resolution of Digital Topographic Map (수치지형도 해상도를 고려한 용담댐 주변지역 지원사업비 영향 분석)

  • Lee, Geun Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5D
    • /
    • pp.523-531
    • /
    • 2010
  • A dam is effective in stable supply of water required in daily life and reduced damage from floods, but there are problems as a lot of land or houses are submerged. Therefore many projects have been conducted in order to improve and support daily life environment surrounding a dam. This study has focused on analyzing how to calculate support working expenses for Dam area by using GIS spatial overlay in addition to effects of scale of a topographic map and reached the following conclusion. First, as a result of areal error in submerged area by scale based on a 1/3,000 digital topographic map, it has been found that a 1/5,000 digital topographic map is 9.5 times more accurate than a 1/25,000 digital topographic map in the total of areal error. Second, as a result of areal error in area surrounding a dam, it has been found that a 1/5,000 digital topographic map is 7.4 times more accurate than a 1/25,000 digital topographic map in the total of areal error. Third, as a result of error of support expense for submerged area, it has been found that a 1/5,000 digital topographic is 15.9 times, 14.7 times and 15.9 times more effective than a 1/25,000 digital topographic map in terms of the total error of support expense, standard error and the total support expense error on the entire project costs in submerged area. In addition, as a result of analysis on error of support expense for area surrounding a dam, it has been found that a 1/5,000 digital topographic map was 10.7 times, 9.6 times and 10.6 times more effective, respectively, in the total error of support expense, standard error and the total error of support expense for the entire project costs in area surrounding a dam compared to a 1/25,000 digital topographic map. Lastly, as a result of error of the entire project costs for area surrounding a dam, it has been found that a 1/5,000 digital topographic map was 1.4 times, 1.3 times and 1.4 times more effective, respectively, in the total error of support expense, standard error and the total error of the entire project costs compared to a 1/25,000 digital topographic map, but it was not much different from the result of calculating areal error in submerged area or area surrounding a dam because population item didn't consider areal concept.

The Error Analysis of Scale Effect for Dam Submerged Area and the Surrounded Regions (댐 수몰 및 주변지역의 축척 규모에 따른 오차분석)

  • Lee, Geun-Sang;Choi, Yun-Woong;Hwang, Eui-Ho;Chae, Young-Gang
    • Spatial Information Research
    • /
    • v.18 no.4
    • /
    • pp.43-53
    • /
    • 2010
  • A dam is effective in stable supply of water required in daily life and reduction of damage from floods. hut a lot of land or houses arc submerged due to the construction of a darn heavily affecting environment in surrounding areas. In order to improve and support daily life environment. surrounding a dam, many projects have been conducted. and the study has focused on analyzing bow to calculate error characteristics of scale effect for submerged area by using GIS spatial overlay. First, as a result of areal error in submerged area by scale based on a 1/3,000 digital topographic map, it was found that the 1/5,000 digital topographic map is 9.5 times, 9.0 times and 10.5 times more accurate than the 1/25,000 digital topographic map, respectively, in the total of areal error, standard error and areal error for submerged area. Second, as a result of analysis on areal error in areas surrounding a dam, it has been found that Jinan-eup in Jinan-gun registered the largest difference in area within 2km and 2~5km catchment area by recording 13.8 times and 20.6 times, respectively, in the 1/5,000 digital topographic map compared to the 1/25,000 digital topographic map. In addition, in areas out of catchment area within 2km, the area of occupation was very small, so there were no characteristics in error. The out of catchment area, Nami-myeon in Geumsan-gun recorded the largest errors of 31.8 times. Finally, it was found that the ratio of the total areal error in area surrounding a dam, standard error and the total areal error in the entire area using 1,5000 digital topographic map is 7.4 times, 11.8 times and 7.4 times more accurate than the 1/25,000 digital topographic map.

The Study on the Satisfaction Factors of the Support Projects for the Adjacent Residents to Multipurpose Dams (다목적 댐주변지역지원사업 고객만족에 미치는 영향 요인 연구)

  • Kim, Shang Moon;Lee, Byungchul
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.4
    • /
    • pp.335-343
    • /
    • 2013
  • Multi-purpose dams are regarded to contribute to the Korean society not only positive affects but also negative ones. Especially, negative considerations are usually prevailed around multi-purpose dam sites and their vicinities even though the Government adopted "act on dam construction and assistance, etc. to neighborhood area" in 1989 and has supported many various projects since 1990. Nevertheless, many arguments and controversies about effects of multi-purpose dams and support projects to vicinities" have happened so frequently and sometimes brought a suit against government. These situations imply that support projects are not so sufficient to fulfil peoples' expectations. Therefore, this research figured out the key factors that affected residents' satisfaction about multi-purpose dams and support projects. The results of the research are as follows: 1) 'social necessity of dams', 'rationality of the process in supporting project' and 'appropriateness of supporting project', were statistically significant to 'customer satisfaction'; 2) among these factors, 'rationality of the process in supporting project' was the most related to 'customer satisfaction': 3) 'appropriateness of supporting project', 'social necessity of dams' were also revealed as second third factors that relate to the satisfaction.