• Title/Summary/Keyword: 댐운영

Search Result 750, Processing Time 0.03 seconds

Optimization of Multi-reservoir Operation with a Hedging Rule: Case Study of the Han River Basin (Hedging Rule을 이용한 댐 연계 운영 최적화: 한강수계 사례연구)

  • Ryu, Gwan-Hyeong;Chung, Gun-Hui;Lee, Jung-Ho;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.8
    • /
    • pp.643-657
    • /
    • 2009
  • The major reason to construct large dams is to store surplus water during rainy seasons and utilize it for water supply in dry seasons. Reservoir storage has to meet a pre-defined target to satisfy water demands and cope with a dry season when the availability of water resources are limited temporally as well as spatially. In this study, a Hedging rule that reduces total reservoir outflow as drought starts is applied to alleviate severe water shortages. Five stages for reducing outflow based on the current reservoir storage are proposed as the Hedging rule. The objective function is to minimize the total discrepancies between the target and actual reservoir storage, water supply and demand, and required minimum river discharge and actual river flow. Mixed Integer Linear Programming (MILP) is used to develop a multi-reservoir operation system with the Hedging rule. The developed system is applied for the Han River basin that includes four multi-purpose dams and one water supplying reservoir. One of the fours dams is primarily for power generation. Ten-day-based runoff from subbasins and water demand in 2003 and water supply plan to water users from the reservoirs are used from "Long Term Comprehensive Plan for Water Resources in Korea" and "Practical Handbook of Dam Operation in Korea", respectively. The model was optimized by GAMS/CPLEX which is LP/MIP solver using a branch-and-cut algorithm. As results, 99.99% of municipal demand, 99.91% of agricultural demand and 100.00% of minimum river discharge were satisfied and, at the same time, dam storage compared to the storage efficiency increased 10.04% which is a real operation data in 2003.

Analysis of Water balance at Kwoesan Dam(2019) (2019년 괴산댐 유역 물수지 분석)

  • Hwang-Bo, Jong Gu;Kim, Ji Hun;Kim, Ki Young;Shin, In Jong;Myung, Moon Soo;Kim, Min Gyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.263-263
    • /
    • 2020
  • 댐 유역 수문자료는 댐의 효율적인 운영, 중장기 댐 운영 계획, 수자원 관리, 댐 저수량 예보 등에 사용된다. 댐의 주요 수문자료로는 일반적으로 유입량인 강수량과 유량으로 구성되어있으며 유출량인 방류량, 증발량, 토양수분량으로 구분한다. 현재 강수량, 유량, 방류량은 지속적으로 계측하고 있으나 증발산량과 토양의 저류량 등은 실제적으로 측정의 어려움을 가지고 있다. 본 연구에서는 실측자료를 물수지 방정식에 대입해 발생한 잔차를 통해 산출한 증발산량과 비교적 정확성이 높다고 알려져 있는 GLDAS NOAH 지형 모형자료에서 산정된 증발산량간의 비교를 수행하였다. 또한 이렇게 각각 산정한 증발산량으로 월별로 물수지 분석을 정량화하여 분석하였다. 유량자료는 후영교 수위관측소의 자료, 강수량은 괴산군(청천면사무소) 강수량관측소 외 15개소 자료, 댐 방류량자료 등의 실측자료를 사용하였으며, 증발량은 GLDAS NOAH 지표면 model을 이용하여 산정하였다. 저수지 토양수분량은 자료가 없어 고려하지 않았다. 2019년 괴산댐 유역의 총 유입량은 218.54 백만㎥이며, 증발량을 고려한 총 유출량은 200.50 백만㎥으로 나타나 댐의 저류량은 18.05 백만㎥으로 나타났다. 그러나 실제 저수지의 수위-저수용량 곡선식을 이용하여 계산된 총 저류량은 0.06 백만㎥으로 상당한 차이를 보이고 있다. 이 원인으로 1. 증발량 추정자료 사용, 2. 토양저류량 미 고려, 3. 자료가 없는 취수량 미 고려 4. 유량, 방류량, 강수량 자료 오차 등이 있는 것으로 판단된다. 한편, GLDAS NOAH 지표면 model을 이용한 연 저수지증발량과 물 수지 방적식을 이용한 연 저수지증발량은 각각 0.79 백만㎥, 18.84 백만㎥으로 나타나, 역시 차이를 보인다. 이는 물 수지 방정식을 이용한 연 저수지증발량은 토양수분증발량 미 고려에 따른 것과 GLDAS NOAH 지표면 model자료는 직접적인 실측 자료가 아닌 추정 자료로 다소 오차가 있을 것으로 생각된다. 댐 유역 물의 이동을 추적하고 이를 정량적으로 나타내는 것은 결과적으로 효율적인 댐 운영을 가능하게 한다. 그러나 최근 실시되는 유량측정과는 달리 물 수지 분석의 주요 인자인 증발량과 토양수분량 등은 측정이 전무하여 여러 가지 방법으로 추정하는 현실이다. 추후 이러한 수문자료를 실측하여 제공한다면 댐 관리 및 중장기 댐 운영 계획 수립 등 효율적인 댐 운영에 대단히 유용할 것으로 기대된다.

  • PDF

Study on Simulation of Long-term sediment Transfer for applying to reservoir operation - In Gulpur HPP, Pakistan (저수지 운영을 위한 장기간 퇴사분석 - 파키스탄 Gulpur를 대상으로)

  • Won, Changyeon;Park, Jongpyo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.234-234
    • /
    • 2018
  • 댐 건설을 하게 되면 저수지 형성으로 인한 통수단면 증가가 발생하고 이에 따른 하천의 유속 및 난류 영향이 감소하게 된다. 이러한 영향으로 댐 상류 구간에서 발생한 유사량은 저수지에 퇴적하게 되고 유효저수량은 감소하게 된다. 저수지의 유효저수량 감소는 댐의 주요 기능인 용수공급, 수력발전 등의 기능 저하에 지대한 영향을 주게 된다. 특히 해외 수력발전 사업의 경우 하천 경사가 크고, 퇴사가 많이 발생하는 지역에 댐이 위치하고 있다. 이와 같은 문제 해결을 위한 중 장기적 퇴사거동 및 예측에 대한 연구가 필요한 상황이다. 본 연구에서는 파키스탄 Gulpur 지역에 설치 예정인 수력발전용 댐에 대한 장기간 퇴사모의를 위해 1차원 유사해석 모형인 HEC-RAS sediment module을 이용하였다. 퇴사모의에 적용한 모형의 입력 자료로는 총 52개년(1960-2011년)간 유사량 관측값과 20년간 유량측정 결과를 이용하였다. 유사해석 모의 시나리오는 유사 재질 비율변화에 따른 장기간 Deposited 모의와 댐의 Gate를 통한 유사 배제를 운영하는 Flushing 모의를 수행하였다. 유사해석 모의 결과 Deposited 시나리오의 경우는 저수지에서 퇴적된 유사는 대부분 Sand가 차지하게 된다. Sand의 포착률은 저수지가 가득 차기 이전에는 거의 100 % 포착이 되며, 저수지가 가득 차는 시기인 운영 20년 후에는 Sand를 포함한 전체 유사의 59%가 포착하게 되어 저수지가 한계에 도달한 것을 확인하였다. 또한, Flushing 시나리오의 경우는 Flushing 운영 기간의 변화에 따른 퇴사 포착 영향이 큰 것으로 분석되었으며, Gulpur 댐의 경우는 운영기간을 5일로 설정하는 것이 안정한 하상상태를 유지하는 것으로 검토되었다.

  • PDF

Verification for applied water management technology of Global Seasonal forecasting system version 5 (확률장기예보GloSea5의 물관리 활용을 위한 검증)

  • Moon, Soojin;Hwang, Jin;Suh, Aesook;Eum, Hyungil
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.236-236
    • /
    • 2016
  • 현재 댐운영 계획 수립 시 매월 유지해야 하는 저수량의 범위를 나타낸 기준수위가 사용되고 있으며 매년 홍수기 말에 현재의 수문 상황과 장래의 전망을 통한 시기별 연간, 월간 댐운영 계획을 수립하고 있다. 물관리의 이수측면에서 댐수위 운영계획 수립과 홍수기 운영목표 수위를 결정하는데 활용하기 위해서는 계절단위, 연단위의 기상정보가 필요하다. 본 연구에서는 기상청에서 운영하고 제공하는 전지구 계절예측시스템 GloSea5(Global Seasonal forecasting system version 5)자료를 활용하여 금강유역에 적용하고자 하였다. GloSea5는 전지구계절예측시스템으로 대기(UM), 지면(JULES), 해양(NEMO), 해빙(CICE)모델이 서로 결합되어 하나의 시스템으로 구성되어 있으며 공간 수평해상도는 N216($0.83^{\circ}{\times}0.56^{\circ}$)으로 중위도에서 약60km이다. Hindcast자료는 유럽중기예보센터(ECMWF)에서 생산된 ERA-Interim 재분석장을 대기 모델의 초기장으로 사용하며 기간은 1996~2009년의 총 14년이다. 예보자료의 검증은 예보의 질을 결정하는 과정으로 Brier Skill Score (BSS), Reliability Diagrams, Relative Operating, Characteristics (ROC)등을 통해 정확성과 오차에 의한 예보의 성능을 검증하였다. 또한 Glosea5의 통계적 상세화를 수행하여 다양한 변수가 갖는 계통적인 지역 오차를 보정함으로써 자료의 신뢰도를 향상시키고자 하였으며 이는 이후 수문모델과의 연계 시 보다 정확하고 효율적인 댐운영에 활용할 수 있는 기후예측정보를 제공할 수 있을 것으로 판단된다.

  • PDF

Development of reservoir operation rule curve using DP for max hydro-power generation of power station in the Nam Ngum River in Lao PDR. (라오스 남능강 발전소의 최대전력생산을 위해 동적계획법을 활용하여 저수지 운영규정곡선 개발)

  • Lee, Hyun Jae;Jang, Woong Chul;Lee, Il Ju;Lee, Jin Hee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.106-106
    • /
    • 2021
  • 라오스 남능강 유역에는 현재 11개의 수력 발전 댐이 운영되고 있으며 최근에 설치된 댐을 제외하고는 오래전에 개발된 운영규정 곡선에 근거하여 운영하고 있다. 즉 댐의 증설에 따른 하천 유량의 변동과 발전소의 설비용량증설 등의 발전환경이 충분히 반영되지 못한 상태로 운영하고 있으며, 이로 인해 통합수자원 관리의 최적화 차원의 일환으로 최대 전력생산을 위한 새로운 저수지 운영규정 곡선 개발이 필요하게 되었다. 저수지 운영규정 곡선(reservoir operation rule curve)은 일반적으로 주어진 저수지의 규모와 저수지로의 유입량 그리고 발전소의 설비용량 등의 발전환경을 종합적으로 고려하여 연간 발전량을 최대로 생산할 수 있도록 최적화 기법 등을 활용하여 개발한다. 본 고에서는 이를 위해 범용적인 동적 계획법(Dynamic Programming:DP)프로그램인 CSUDP를 활용하여 최초의 최적 저수지 운영규정 곡선을 제시하고 이에 의한 발전량을 모의하기 위해 HEC-ResSim package를 활용하였으며, 최종적으로는 기존의 운영규정 곡선, 운영실적, 그리고 현장 운영자의 의견 등을 종합적으로 고려하여 댐 운영 시나리오(단독, 연결, 댐별 상업 발전 시기 등)별로 운영규정 곡선을 개발하고 라오스 정부(EdL)에 제시하였다.

  • PDF

Extraction of Primary Factors Influencing Dam Operation Using Factor Analysis (요인분석 통계기법을 이용한 댐 운영에 대한 영향 요인 추출)

  • Kang, Min-Goo;Jung, Chan-Yong;Lee, Gwang-Man
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.10
    • /
    • pp.769-781
    • /
    • 2007
  • Factor analysis has been usually employed in reducing quantity of data and summarizing information on a system or phenomenon. In this analysis methodology, variables are grouped into several factors by consideration of statistic characteristics, and the results are used for dropping variables which have lower weight than others. In this study, factor analysis was applied for extracting primary factors influencing multi-dam system operation in the Han River basin, where there are two multi-purpose dams such as Soyanggang Dam and Chungju Dam, and water has been supplied by integrating two dams in water use season. In order to fulfill factor analysis, first the variables related to two dams operation were gathered and divided into five groups (Soyanggang Dam: inflow, hydropower product, storage management, storage, and operation results of the past; Chungju Dam: inflow, hydropower product, water demand, storage, and operation results of the past). And then, considering statistic properties, in the gathered variables, some variables were chosen and grouped into five factors; hydrological condition, dam operation of the past, dam operation at normal season, water demand, and downstream dam operation. In order to check the appropriateness and applicability of factors, a multiple regression equation was newly constructed using factors as description variables, and those factors were compared with terms of objective function used in operation water resources optimally in a river basin. Reviewing the results through two check processes, it was revealed that the suggested approach provided satisfactory results. And, it was expected for extracted primary factors to be useful for making dam operation schedule considering the future situation and previous results.

An application of Smoothed Particle Hydrodynamics on intake system analysis in a dam (입자법을 이용한 댐 취수 운영의 3차원 해석 적용)

  • Kim, Sunghoon;Cho, Kwangjoon;Park, Chungik;Moon, Sukju;Kim, Jongchan
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.92-92
    • /
    • 2019
  • 최근 기존의 격자방식의 해석 방법을 벗어나 해석 영역에 대한 분할을 별도로 고려치 않는 수치기법의 실무적 적용사례가 증가 하고 있으며, 이러한 방식중 SPH(Smoothed Particle Hydrodynamics) 방식이 근자에 수자원 분야에서도 도입되어 관수로 및 개수로 해석 또는 복합해석 등에 활용된 바 있다. 최초 도입된 무격자방식의 모형들은 주로 복잡한 형상을 지니는 유체기계 등에 활용성이 높았던 바, 큰 규모의 해석 도메인을 가지는 수자원 분야에서의 SPH의 실무적용 평가와 효율성의 확보를 위해서, 본 연구는 국내 댐을 시범 대상으로 하여 SPH 수치해석 툴을 적용하고자 하였다. 분석 대상댐은 국내 P댐으로서 관리수위의 변동은 크지 않으나, 댐 직상류의 만곡이 심하고 다수의 대규모 취수구를 가진 곳으로 상시 발전방류 및 수시 댐 수문방류에 의해 유체의 흐름이 2,3차원의 복잡성을 띄고있기 때문에, 3차원 전산유체역학 Tool의 적용이 적절한 것으로 판단하였다. 해석을 위해 하류경계조건을 댐축과 문비로 설정하였고 상류 1km까지를 해석의 도메인으로 설정하였다. 소요시간을 줄이기 위해 여러 번의 모의를 거쳐 입자의 평균 입경은 0.6m로 제안하고 시격은 1초 미만(평균 0.5초)로 설정하였다. 수문 및 발전방류는 해당댐의 1~2년 빈도 수준에 해당하는 $5,000m^3/s$ 이하의 유량을 기준으로 하여 모의를 수행하였다. 모의의 안정성을 확보한 이후에는 해당 댐지역의 하류영향을 고려한 문비제어를 반영한 다양한 방식의 수문운영 및 취수지점의 순간 수위 영향을 검토하였다. 그 결과로 본 모의에서는 특정한 수문의 운영 조건에서는 댐수위 계측지점과 인근 취수지점 간에도 0.2m 수준의 순간 수위차가 발생할 수 있음을 보였으며, 이는 경우에 따라 취수시설의 일시적 장애요소로 발생할 수 있음을 의미한다. 따라서, 현재의 취수구조물과 문비운영 특성에 따라 발생가능한 취수장애를 줄일 수 있는 운영조건의 탐색을 위해서 수치모의를 추가로 하였으며, 이 때 댐축 상류의 유속분포에 대한 추가 검토도 수행하였다. 다만, 댐에서 방류시 하류조건에 대한 검토는 추후 보강되어야 할 것으로 판단된다.

  • PDF

Optimal Reservoir Operation Using Goal Programming for Flood Season (홍수기 Goal Programming을 이용한 저수지 최적운영)

  • Kim, Hye-Jin;Ahn, Jae-Hwang;Choi, Chang-Won;Yi, Jae-Eung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.67-71
    • /
    • 2010
  • 홍수기 다목적댐 운영의 목적은 홍수조절용량을 최대한 이용하여 하류 주요 지점의 첨두홍수량을 저감시키거나, 계획홍수량을 초과하지 않도록 방류량과 방류시점을 조절함으로써 홍수 피해규모를 최소화하는 것이다. 본 연구에서는 홍수기 다목적댐 운영에서 다목적 최적화의 한 형태인 goal programming의 적용성을 검토하였다. 실제 강우사상을 이용하여 단일저수지 운영과 저수지 연계운영을 실시하였다. 단일 저수지 운영을 적용하기 위한 시험유역으로는 충주댐 유역을 선정하였고 저수지 연계운영을 적용하기 위한 시험유역으로는 안동댐과 임하댐 유역을 선정하였다. goal programming의 결과 분석을 위해 저수지 모의운영 모형인 HEC-5 모형의 결과와 비교, 분석하였다. goal programming을 이용할 경우 HEC-5 운영결과보다 안정적인 운영결과를 얻을 수 있었다. goal programming을 이용한 최적화 운영의 경우 전구간의 유입량을 알고 있다는 점에서 실제 저수지 운영과는 차이가 있다. 그러나 적절한 제약조건을 적용하고 홍수예경보를 이용하여 예보된 유입량을 활용하면 최적의 방류시점과 방류량을 산정하여 홍수기 다목적댐을 효율적으로 운영할 수 있으며 주요 지점의 홍수량도 저감할 수 있을 것으로 판단된다.

  • PDF

A Study on Operation of Reservoir using Artificial Neural Networks (인공신경망을 통한 댐 운영 문제 연구)

  • Kim, Seok Hyeon;Hwang, SoonHo;Jun, SangMin;Kim, Kyeung;Kang, Moon Seong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.403-403
    • /
    • 2019
  • 수자원을 효율적으로 관리하고 사용하는 것은 확보한 수자원을 확보한 목표에 맞게 시,공간적으로 적절하게 분배 시키는 것이다. 따라서 저수지 운영의 최종 목표는 댐 건설 목적에 따라 확보된 물을 유입량, 저수량, 용수 수요등을 감안하여 댐 운영 목표에 맞게 최적으로 적절한 양의 물을 적절한 시기에 방류하는 것이다.(손덕환, 2004) 현재 댐군의 운영방법은 확정론적인 방법과 추계학적인 방법이 주로 이용되고 있으나 본 연구에서는 최근 연구가 많이 이루어지고 있는 인공신경망을 적용하여 운영방법으로써의 적용성을 검토하고자한다. 연구대상지로는 수력발전소가 포함된 한강의 충주 다목적댐을 선정하였다. 인공신경망은 입력층에서 출력층사이에 은닉층이 존재하는 다중신경망을 활용하였으며 출력층은 방류량으로 설정하여 발전방류와 수문방류를 구분하여 설정하였다. 방류량 결정을 위한 입력층 구성은 선행 연구들을 참고하여 예측 유입량, 현재 수위, 발전량, 용수 수요량 등을 설정하여 입력층으로 구성하였다. 학습기간의 방류량 자료를 학습하고 검정기간을 통해 실제 이루어진 방류량과 모의된 방류량의 차이를 비교, 분석하여 댐 운영방법으로써의 인공신경망의 적용성을 검토하고자하였다.

  • PDF

Research on the accuracy improvement of rainfall estimation using rain radar and ground gauge data for the hydroelectric dams (강우레이더와 지상관측자료를 활용한 수력댐 유역 강우추정 정확도 개선 연구)

  • Yoon, Seong Sim;Shin, Hongjoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.9-9
    • /
    • 2021
  • 기후변화의 영향으로 과거에 경험하지 못한 이상강우 발생 증가로 댐 및 수자원 관리에 어려움이 증대되고 있다. 특히, 강우의 시·공간적 변동성 심화로 기존 지상강우계만으로는 정확한 유역 단위의 강우량 추정이 어려우며 관측강우자료의 불확실성은 댐 운영의 부정확성을 야기할 수 있다. 최근 지상강우계의 대안으로 시·공간 해상도가 우수한 강우레이더의 활용 및 현업적용이 증대되고 있다. 본 연구에서는 안정적인 수력댐 운영 및 수재해 예방을 위해 고해상도 강우레이더와 지상관측 강우자료를 활용하여 수력댐 유역의 강우추정 정확도를 개선하고자 하였다. 이를 위해 환경부 합성레이더 강우자료와 지상강우관측자료를 이용하여 조건부 합성기법으로 격자강우자료의 정확도를 개선하였다. 대상 유역은 한국수력원자력(주)의 수력발전용댐(팔당, 의암, 춘천, 화천, 청평, 도암, 괴산, 섬진강, 보성강댐) 이다. 특히, 레이더 오차 분석을 통해 지형효과의 고려가 필요한 수력댐 유역을 선정하여 고도영향 조건부합성기법을 적용하도록 하였다. 이를 통해 수력댐 유역의 지형 및 기상 특성을 차별화한 보정이 가능하였다. 또한, 소유역별 레이더 유역평균강우의 오차를 실시간으로 저감하기 위해 화음탐색법과 칼만필터 기법을 적용하여 수력댐 수계 내 172개 소유역의 유역평균강우량을 실시간으로 최적화 할 수 있도록 하였다. 본 연구를 통해 개발된 수력댐 유역의 고해상도 강우 정보를 기반으로 GIS 웹 표출 시스템에 개발하여 수력댐 운영 업무활용 할 수 있도록 지원하고자 한다.

  • PDF