• Title/Summary/Keyword: 대안 선정

Search Result 755, Processing Time 0.033 seconds

Decision Making for Train Maintenance Facility using Simulation and Entropy measurement (시뮬레이션과 엔트로피 척도를 이용한 철도 차량기지 대안 선정)

  • Kim, Kyung-Rok;Chun, Hyun-Jae;Lee, Hong-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.8
    • /
    • pp.2809-2817
    • /
    • 2010
  • The scholarly concern of train industry has been improved, since country focuses on this field. Especially, train maintenance facility has been studied for construction, because the facility is important to inspect the train that transports passenger and cargo. Various operation plans and criteria are considered to build train maintenance facility. In this paper, the decision making of train maintenance facility for construction is studied and analyzed with simulation, because mathematical theory is restricted to consider various operation plans and criteria. Through simulation, we analyze warm-up after selecting dependent factors, and extract data. The data is used to select a alternative in this problem, Multiple Attribute Decision Making(MADM). Previous study is difficult, complex and subjective for decision making. However, entropy measurement we used help decision maker for decision making, easily, simply, and objectively. This method can have decision maker choose the best alternative in case the train maintenance facility construction is fast revitalized.

Determination of Appropriate Flood Reduction Alternatives for Climate Change Adaptation in Gyeongan Watershed (기후변화 적응을 위한 경안천 유역의 적정 홍수저감 대안 선정)

  • Han, Dae-Gun;Choi, Chang-Hyun;Jang, Hong-Suk;Choi, Young-Joo;Kim, Duck-Hwan;Kim, Hung-Soo
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2015.11a
    • /
    • pp.287-289
    • /
    • 2015
  • 최근 기후변화로 인하여 태풍 및 집중호우로 인한 극한 강우사상의 발생빈도가 증가하고 있으며, 급격한 도시화로 인한 유역 내 불 투수 면적이 늘어나고 있다. 이로 인해 재산피해가 증가하고 있어 기후 변화를 고려한 미래 하천범람 등 홍수피해를 경감시키기 위한 홍수저감 대안 선정이 필요하다. 따라서 본 연구에서는 기후변화를 고려하여 목표기간별로(기준년도 : 1971~2010년, 목표기간 I : 2011~2040년, 목표기간 II : 2041~2070년, 목표기간 III : 2071~2100년) HEC-HMS모형을 이용하여 기후변화에 따른 홍수량을 산정하였다. 또한, 배수펌프(A~E)와 저류지(A~E)를 홍수저감 대안으로 설정하여 HEC-RAS모형을 통해 대안별 홍수위를 산정하였다. 지형자료 및 홍수위를 이용하여 홍수범람도를 도시하였으며, 다차원 홍수피해액산정법(Multi dimension - Flood Damage Analysis, MD-FDA)을 이용하여 홍수피해 저감을 위한 대안별 경제성분석을 실시하였다. 홍수저감효과를 분석한 결과 배수펌프를 설치했을 경우 홍수위는 최소0.06m, 최대0.44m 감소하였고, 저류지는 최소0.01m, 최대1.86m 감소하였으며, 침수면적은 최소 0.3%, 최대 32.64% 감소되는 것을 확인할 수 있었다. 또한, 경제성분석을 실시하여 대안별 편익 비용비를 비교한 결과 목표기간I에서는 저류지 E, 목표기간II, 목표기간III에서는 배수펌프D가 기후변화를 적응을 위해 타당한 홍수저감 대안으로 판단되었다.

  • PDF

Study on the Frame of Selection for the Removal of Obsolete Small Dams (기능을 상실한 보 철거를 위한 보 선정 체계 연구)

  • Rhee, Dong-Sop;Woo, Hyo-Seop;Ahn, Hong-Kyu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1154-1158
    • /
    • 2007
  • 현재 국내 하천에는 수많은 보가 존재하고 있으며, 하천에 설치된 보는 보 주변 지역에 많은 혜택을 제공한다. 보의 규모가 클 경우 소수력 발전을 위한 용도로 사용되거나, 선박 통행을 위한 수심 확보 목적으로 활용된다. 상수원으로서 농업용수와 생활용수를 공급하며, 홍수 시 상부 저수지를 홍수 조절을 위한 목적으로 활용되며, 지역 주민들에게 여가 활용의 기회를 제공한다. 이렇듯 하천에 설치되어 있는 보는 유용한 역할을 수행하지만 사용하고자 하는 용도가 없어지고, 노후화되어 보의 기능이 점차 약화되는 보들이 하천에 계속 남아있게 된다면, 필요 없이 하천을 막아 흐름을 정체시켜 결국 환경이나 생태적인 측면에서 커다란 손실을 가져오게 된다. 최근 농경지 도시화, 경작 방식의 변화, 취수시설물 통폐합, 시설 노후화 등으로 매년 수십 개 이상의 보가 폐기되고 있으나, 폐기된 보는 대부분 철거되지 않고 하천에 남아 여전히 문제를 발생시키고 있으며, 외국의 경우에는 이미 기능 및 용도를 상실한 보 철거는 하천 생태통로 복원 등의 목적을 위해 하천환경복원의 한 방법으로 널리 활용하고 있다. 특히 보의 기능 상실 여부는 단순한 시설물 노후 여부로 따지는 것이 아니라 본래의 기능을 상실하였을 경우에는 시설물이 노후화되지 않았더라도 적극적으로 철거하고 있다. 본 연구는 보 철거를 통한 하천생태통로 복원 기술 개발을 위한 연구의 일환으로 기능을 상실한 보 철거를 위한 보 철거 선정 체계에 대한 시안을 제시하고자 한다. 철거 대상 보 선정을 위해서는 보 관리주체 및 보 주변지역에 거주하는 주민의 역할이 중요하며, 이에 따라 보 철거 선정 체계는 보 철거를 위해서 보 주변 지역 거주민을 설득하며, 하천의 환경 개선을 위한 합리적인 대안 제시를 목적으로 하고 있다. 선정 체계를 바탕으로 주민 협의 및 대안 제시를 통해 결정된 대상 보는 선정 체계 안에서 보 철거 영향 판단 절차에 따라서 보 철거로 인한 수문, 수리, 지형, 수질, 생태 영향을 판단하게 되며, 이와 더불어 사회 경제적인 영향을 평가하게 된다. 평가결과에 따라서 보를 완전히 철거하거나 다른 대안을 고려하여 보를 부분적으로 철거하거나 개량하게 된다.

  • PDF

Alternative Evaluation Technique for the High-rise Building Structural System (초고층 건물 구조시스템의 대안평가기법)

  • Kim, Yeong-Min;Lee, Dong-Woo;Lee, Han-Joo;Lee, Sang-Joo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.243-246
    • /
    • 2010
  • 본 연구에서는 초고층 건물의 구조시스템에 대한 다양한 대안으로부터 각 대안의 성능을 합리적으로 평가하는 방법을 연구하였다. 이를 위해 우선, 대안평가를 위한 평가항목과 각 평가항목별 평가기준을 도출하고, 도출된 기준에 따라 평가결과를 산정하는 방법을 제안하였다. 그리고 평가항목간의 관계와 평가항목의 중요도를 산정하고, 퍼지적분을 이용하여 평가결과를 종합화하는 방안을 제안하였다. 평가항목은 크게 세가지로 이에는 구조성능, 경제성, 공기가 있다. 대안에 대한 평가는 예비평가, 본평가, 실시평가의 세 단계로 이루어지며, 각각 보수적인 관점에서와 낙관적인 관점에서의 평가를 실시하고 주어진 평가결과를 바탕으로 최종적으로는 엔지니어가 대안을 선정하는 방향으로 평가를 진행한다.

  • PDF

Development of Multi-Criteria Decision Making Model for the Determination of Investment Priority in Water Resources Projects (수자원사업 투자우선순위결정을 위한 다기준의사결정모형 개발)

  • Yeo, Kyu-Dong;Choi, Seung-An;Kim, Gil-Ho;Lee, Sang-Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.109-113
    • /
    • 2011
  • 수자원사업은 합리적이고 신뢰성 있는 의사결정이 필요한데 그동안 주로 경제성분석에 의존하여 왔다. 본 연구는 경제성분석위주의 기존 방법을 탈피하여 사업 필요성과 투자 타당성을 다양한 각도로 평가할 수 있는 합리적이고 객관적인 수자원사업 대안선정과 투자우선순위결정 방법을 도출하고자 하였다. 이를 위해, 대안 간에 동일한 기준으로 종합평가점수를 산정하여 우선순위를 결정할 수 있도록 다기준의사결정모형을 개발하였다. 적용결과는 취약성 기준에 큰 영향을 받으며, 정책적 기준, 경제성 기준의 순으로 분석되었다. 이는 전문가 설문에 의한 평가기준별 가중치의 영향으로, 수자원사업은 단순히 경제성 분석만으로 평가를 해서는 안 됨을 의미한다. 본 연구는 대규모의 예산이 투입되는 수자원사업에 대한 효율성과 취약지역에 대한 형평성을 제고하는데 기여할 수 있을 것으로 판단된다.

  • PDF

Planning of Alternative Forest Road Network Using GIS (GIS를 이용한 대안별 임도노망의 계획에 관한 연구)

  • Jeon, Kwon-Seok
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.11 no.1 s.24
    • /
    • pp.21-28
    • /
    • 2003
  • This study was aimed at suggest a proper planning method to select a optimal forest road network in mountains forest using GIS(Geographic Information System). To examine the field applicability, the method was applied to the National Forest at Mt. Kumsan in Namhae-gun, Gyungsangnam-do. The main results from altogether six alternative road route plans were derived from these criteria obtained the alternative route plan No.2 has two layout criteria, longitudinal gradient and earth work volume, and it showed similar pattern of existing forest road network which was designed mainly ground slope and longitudinal gradient. The alternative route plan No.6 has four criteria, longitudinal gradient, earth work volume, investment effect and landscape impact. It was different for the lowest forest road density among the alternatives and the pattern of the forest road layout was radial form, which was also quite different to other alternatives. For optimal forest road network planning, GIS provide the efficient and resonable solutions for decision making to provide the support for evaluation about various alternative road networks. If detailed inventory and relevant data are provided and also clear and objective indicators for evaluations are set up, it could be applied to preliminary analysis and detail planning stage to prevent undesirable effect such the land slide and soil erosion due to inadequate planning for forest road network.

  • PDF

AHP Based-Optimal Selection of Concrete Patching Repair Materials Considering Qualitative Evaluation Criteria (정성적 평가항목을 고려한 콘크리트 보수용 단면복구재료의 AHP 기반 최적선정 모델링)

  • Do, Jeong-Yun;Song, Hun;Soh, Yang-Seob
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.965-968
    • /
    • 2008
  • This study is interested in modeling the selection of optimal repair materials in view of the qualitative evaluation. In order to architecting the evaluation model of various repair alternatives, Analytical hierarchy process techniques was applied to this study. It is composed of aesthetics, easy-to-application, economical efficiency, and environment-friendly properties in upper level. Among the qualitative evaluation items, Environment-friendly properties and execution cost included in economical efficiency is highly weighted. It was concluded that the evaluation model by this study is very useful to choose the best alternative among various repair materials.

  • PDF

An Evaluation of Productivity Improvement for Container Terminal by Operation System (운영시스템에 의한 컨테이너터미널의 생산성 향상 평가)

  • 최용석;하태영
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.04a
    • /
    • pp.385-392
    • /
    • 2004
  • The objective of this study is to evaluate the effectiveness of new operation system for port container terminals. We assumed that the operation system of container terminal consists of monitorig & control system, operation system, planning system, and information technology, and we selected total 19 technology alternatives. Through the results of questionnaire and interview received from field expert, we established the evaluation model and analyze the productivity improvement by estimating the weight and the priority of productivity for operation system. From the developed model, we provide useful implications to introduce new technologies of operation system for domestic container terminals.

  • PDF

An Evaluation of Productivity Improvement for Container Terminal by Introducing Operation System (운영시스템의 도입에 따른 컨테이너터미널의 생산성 향상 평가)

  • Choi Yong-Seok;Ha Tae-Young
    • Journal of Navigation and Port Research
    • /
    • v.29 no.1 s.97
    • /
    • pp.97-104
    • /
    • 2005
  • The objective of this study is to evaluate the expected effectiveness of new operation system for port container terminals. We assumed that the operation system of container terminal consists of monitoring & control system, operation system, planning system, and information technology, and we selected total 19 technology alternatives. Through the results of questionnaire and interview received from field expert, we established the evaluation model and analyzed the productivity improvement by estimating the weight and the priority of productivity for operation system From the developed model, we provide useful implications to introduce new technologies of operation system for domestic container terminals.

Selection Method of Alternatives for Considering Correlation between Component Elements in Remodeling Design Process (리모델링 설계단계에서 부위구성요소의 상관관계를 고려한 대안선정 방법)

  • Park Chan-Gil;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.53-61
    • /
    • 2004
  • As remodeling project is progressed in the constraint which is utilization of existing resource, the subject of remodeling and extend of construction are affected by the correlation between building element. Therefore, this research analyze the correlation between component of building element in the design phase and proposed the diagram model for correlation between building element and proposed selection method of alternative plan for optimized combination of building element in remodeling project.