A case study of large - long tunnel using the charging mechanization system of the bulk emulsion explosives (Bulk Emulsion 기계화 장전시스템을 이용한 대단면 장대터널 시공사례연구)

  • Yoon, Ji-Sun;Jang, Young-Min;Lee, Sang-Hun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.107-115
    • /
    • 2009
  • Lately, the length of tunnel, the number of large-long tunnel over three lanes are steeply increased because of the request for high speed and straight road. Therefore, the maximization of excavation efficiency is needed in tunnel construction. Bulk Emulsion explosives charging system is the spearhead equipment using the radio remote control $&$ mechanization system compare with a traditional method Cartridge type. This study introduced the bulk emulsion explosives which is new method in tunnel blasting and verified the efficiency of bulk emulsion explosives for long-large tunnel. And we tried to compare Cartridge type efficiency with bulk emulsion explosives efficiency by the field test.

The Construction of large and Long Tunnel Using Bulk Explosives (벌크폭약을 이용한 대단면 장대터널 시공 사례)

  • 노상림;문상호;조영천;이상필;유지영
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.65-70
    • /
    • 2004
  • Lately, the length of tunnel, the number of long-large tunnel over 3 lanes are steeply increased because of the request for high-speed and straight road. Therefore, the maximization of excavation efficiency is needed in tunnel construction. The sapaesan tunnel (4 lanes with the length of 4km) construction was delayed with environmental conflict far 2 years. For making-up delayed construction period, various new methods were adopted to improve excavation length, look-out and blasting efficiency. This study introduced bulk explosive which is new method in tunnel blasting and verified the efficiency of bulk explosive far long-large tunnel.

Application of Holden Swellex Bolt for the Design of Long, and Large Profile Traffic Tunnels (대단면 장대터널에서의 Swellex Bolt의 설계적용)

  • 지왕률;이호성;정해성
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2001.10a
    • /
    • pp.25-36
    • /
    • 2001
  • 록볼트의 작용효과는 지반이 굴착되어 안정화되는 초기 1달간이 가장 중요하고 품질관리 문제는 지반조건에 따라 부식에 대한 문제가 있으나, 기존의 전면접착형 록볼트의 경우도 작업여건상 그 확실성은 떨어지는 것이 현실이다. 또한 작업이 시간소모가 크고, 볼트의 지지효과도 충진재가 고결되어야 발효되는 약점을 갖고 있어, 일본, 말레이시아, 유럽 등에서 전면 마찰형 즉시 지보기능이 가능한 Swellex Bolt를 영구지보재로 사용하고 있는 경향이 있다. 기존의 전면 접착형 SN Bolt(이형철근)로써 Grouting 몰탈볼트와 Cem Bolt로 설계된 장대·대단면 도로터널 지보재를 현대식 Swellex Bolt로 대체 설계변경이 가능한 것인지에 대하여 볼트의 지지력 시험(Pullout Test), 볼트재질의 내구성 연구 및 설계변경에 따른 수치해석 등을 실시하여, 볼트로써 지지력을 확인하고, 재질의 안전성을 조사한 후 시공 사이클 타임을 줄이며, 견고하고 시공성이 우수한 Swellex Bolt로의 설계변경을 제안하게 되었다.

  • PDF

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.

Theoretical and Numerical Study on the Support Pressure for Tunnel Face Stability in Shield TBM Construction (쉴드터널 시공 시 막장안정을 위한 지보압의 이론적.수치해석적 고찰)

  • Kim, Kwang-Jin;Koh, Sung-Yil;Choo, Seuk-Yeun;Kim, Jong-Soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.3
    • /
    • pp.197-204
    • /
    • 2006
  • A large sectional tunnelling method using Shield TBM is expected to be popular as domestic demand of long tunnel gets growing. Although a shield tunnelling method has been recognized as prominent method in consideration of stability and applicability in shallow and poor ground, the cases of accident and constructional trouble have been often happened due to unexpected poor ground condition, or selection and use of improper shield machine. Especially, troubling cases at tunnel face are frequently occurred, so supporting pressure control of tunnel face would be the main issue for securing safer and more efficient tunnel excavation using Shield TBM. In this point, we carried out the numerical feed-back analysis to compare the ground deformation pattern with theoretical result at tunnel face.

Case Studies and Future Prospect of Using Bulk Emulsion (에멀젼계 벌크폭약을 이용한 시공사례와 향후 전망)

  • Kim, Hee-Do;Choi, Sung-Hyun
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.64-76
    • /
    • 2008
  • Bulk Emulsion blasts using mechanized charging system, which is generally used in foreign countries, have recently introduced and gradually increased in Korea. The Bulk Emulsion are safe and able to increase the charging density for improvement of fragmentation and advancement especially in tunneling, and minimizing environmental problem. Because of less toxic gas generation, the explosives are called, namely ech-friendly products. There are two kinds of Bulk Emulsion; one is for open cut and the other is for tunneling. According to features of blast sites and its purpose, the compositions are different, but the principle is the same. In this study, trial blasts using Bulk Emulsion for tunneling had executed at 10 sites in Korea. The major result of the major job-sites is the following. First of all, compared with cartridge explosive, Bulk Emulsion was able to increase its charging density up to $35{\sim}60%$, to decrease the blast holes to approximately $10{\sim}30%$ down, and the advancement was improved up to $8{\sim}20%$ and also 30% up in its fragmentation. Toxic gas production after cartridge blasting showed 34.44ppm of its CO. Bulk Emulsion, however, showed 20.13ppm, which was 58.45% production of the cartridge explosive, and NOx was below 2ppm. The mechanized charging system of Bulk Emulsion should be applied to large sized tunnel blasting, long advanced tunnel which can secure the advancement of over $4{\sim}5m$, and the sites required finishing rapidly.