A Study of Construction Duration Predicting Method for Mega Project (메가프로젝트 사업초기단계 사업기간 예측 방법에 관한 연구)

  • Woo, Yu-Mi;Lee, Seung-Hoon;Lee, Hei-Duck;Seo, Yuong-Chil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.597-600
    • /
    • 2008
  • Recently, Several Mega project are been performing as a multi-dimensional development project in Korea, but some problem has been revealed about deficiency of the history, experience, and skill. A multi-dimensional development project require the technology which can manage mega project to its specific at the level of program management. predicting schedule and schedule management are the most important for mega project, been performing over several years. This research shows the method of predicting and planning schedule in the early stage as a pre-study on developing a technology of schedule management. First of all, it presents the development of database considering the specific of mega project that can accumulate the history of schedule and search the schedule according to the type of single and multi building. Also it suggests the method of prediction schedule by creating scenarios according to owner requirements and cash flow, affecting schedule management in the early stage, and the shortening possibility of schedule duration using CCPM theory.

  • PDF

Analysis and Design of the Generic Mission Operations System (통합지향형 임무운용시스템 분석 및 설계)

  • Jung, Ok-Chul;Kim, Hae-Dong;Choi, Su-Jin;Chung, Dae-Won
    • Aerospace Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.127-132
    • /
    • 2009
  • This paper represents the analysis and design of the generic mission operations system for next generation satellite mission. In the past, mission operations systems were developed by their own mission requirements respectively. However, these systems have the similar architecture and common functions. Mission operations systems, in general, consist of mission independent module and mission specific module. In this paper, the generic framework for the mission scheduling and automation are introduced and analyzed. Using these generic frameworks, the risk and cost for operations system development can be reduced significantly. And, these frameworks might be used for the core technology in the development of mission operations system in the future.

  • PDF

Development of 2D hydrodynamic model for successive dam failure analysis (연속 댐 붕괴 해석을 위한 2차원 수리동역학 모형 개발)

  • Kim, Byunghyun;Han, Kun Yeun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.67-67
    • /
    • 2016
  • 최근 기후온난화로 인한 이상기후와 지진의 발생가능성으로 인해 직렬 혹은 병렬로 위치한 2개 이상의 댐(저수지)들의 연속 붕괴 가능성도 점점 커지고 있어 연속 댐 붕괴에 대한 비상대처계획도 수립에 대한 관심도 증대되고 있다. 국내에서는 댐(저수지) 붕괴로 인한 극한홍수해석이나 비상대처계획 수립시 국내에서는 DAMBRK, FLDWAV, HEC-RAS와 같은 1차원 수리동역학 모형이 주로 사용되어지고 있다. 하지만 1차원 모형은 흐름을 하나의 방향으로만 한정하여 해석하고, 각각의 적용 횡단면에서 동일 수위를 가지다는 가정으로 홍수범람해석을 수행하므로 정확성뿐만 아니라 실제 적용성에서도 한계를 가질 수밖에 없다. 댐(저수지) 붕괴로 인한 홍수범람해석에서 2차원 이상의 고차원 모형은 앞서 언급한 1차원 모형에 적용된 비현실적인 가정을 포함하지 않으므로 더욱 정교하고 신뢰성 있는 결과를 얻을 수 있다. 하지만, 홍수범람해석을 위한 상용 프로그램들은 단일 댐(저수지) 붕괴의 적용에는 큰 어려움이 없으나, 지형단면을 초기에 한번만 고려하는 문제로 인하여 연속 댐(저수지) 붕괴의 고려에는 한계를 가진다. 따라서 본 연구에서는 댐(저수지)의 연속 붕괴를 해석할 수 있는 2차원 수리동역학 모형을 개발하고자 한다. 각 댐(저수지)의 붕괴 전과 후의 지형 단면을 여러 번 반영할 수 있는 모형을 개발함으로써 시간차를 두고 붕괴되는 댐(저수지)의 연속 붕괴를 해석할 수 있도록 하였다. 개발모형은 2002년 태풍 루사로 인해 실제로 붕괴된 저수지에 적용되었으며, 이 저수지들은 붕괴시 시간차이를 두고 붕괴가 이루어져 개발모형의 적용 유역으로 선택하였다. 저수지의 연속붕괴 모델링을 위해 지형자료로는 저수지 단면, 댐 제체 및 여수로 붕괴 단면, 하천 단면 그리고 홍수터 지형 반영을 위한 수치지도, 경계조건으로는 저수지로의 유입유량과 하류단 조위조건이 고려되었다. 그리고 태풍 루사 당시의 기록적인 강우를 반영하기 위해 연구유역 인근에 관측된 강우를 모형에서 하천 및 홍수터에서 고려할 수 있도록 하였다.

  • PDF

A Development of System for water supply in the Agricultural Purpose of Bank-high Reservoir (농업용 둑높임저수지 운영시스템 개발)

  • Kim, Hae-Do;Lee, Kwang-Ya;Joo, Jin-Hun;Lim, Hyung-Chang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.188-188
    • /
    • 2012
  • 기존 농업용저수지는 농업용수 공급이라는 단일한 목적으로 비교적 간단하게 운영되어왔다. 그러나 둑높이기사업 후 기존 농업용수를 공급함과 동시에 하천유지용수를 연중 공급해야 하기 때문에 경험적 물관리로는 갈수기간 동안의 물관리 및 홍수기 동안의 저수율 조정 문제를 해결할 수 없다. 따라서 기왕의 경험적 용수공급에서 탈피하고 가이드라인에 의한 공급이 이루어져야 용수목적별 공급이 원활하게 이루어질 수 있으며, 이를 위해서는 물수지 분석 등 기술적으로 분석해야하는 과정을 종합하여 관리자가 쉽게 운영할 수 있도록 의사지원체계가 구축되어야 한다. 본 연구는 둑높임저수지 운영데이터를 구축하고 저수지 운영곡선을 프로그램화 하여 현장 계측데이터를 연계한 물관리 의사지원 시스템을 개발하였다. 본 시스템은 지리정보시스템을 기반으로 작성되었으며, 운영물수지 프로그램이 모듈로 구축되어 농업용수와 하천유지용수 등 용수목적별로 월별 공급량을 계획하여 운영자 및 유관기관에게 제공하는데 있다. 기존 설계용량산정 프로그램을 기반으로 운영에 필요한 운영 물수지분석 모델을 개발하였으며, 이를 기반으로 둑높임저수지의 일부 사업지구에 대한 운영곡선을 프로그램화 하였다. 시스템 개발은 분석에 필요한 정보를 DB화하고, 이를 활용한 운영물수지분석, 운영곡선 모의 등을 수행할 수 있도록 구축되었다. 물관리 센터-현장을 연계하여 운영할 수 있는 의사지원 모듈 즉, 센터에서 운영기준과 운영계획량을 수립(모의)하고, 이에 따라 조견표, 개도율로 현장을 운영할 수 있도록 단순화하였다. 추가적으로 스마트 단말기를 통해 홍수기 업무지원이 가능토록 기능을 구현하였다. 본 시스템은 가이드라인에 의한 농업용저수지 운영관리라는 관점에서 유일한 시스템으로 유역별 환경변화 인자와 현장운영 경험치를 적용한 첫 번째 사례이다. 또한 관행적 물관리에서 탈피하여 과학적 수자원 관리로 국가 물관리 정책수립에 필요한 의사결정지원에 활용될 예정이다.

  • PDF

A Study on the estimation of traffic congestion for Pyeongtaek·Dangjin port development (평택·당진항의 내항개발에 따른 교통혼잡도 평가에 관한 연구)

  • Gug Seung-Gi;Kim Se-Won;Kim Jung-Hoon
    • Journal of Navigation and Port Research
    • /
    • v.29 no.6 s.102
    • /
    • pp.481-485
    • /
    • 2005
  • The port entry system of the inner harbor in Pyeongtaek${\cdot}$Dangjin was planned as lock-gate in 'Master plan project on port planning in Asan industry base(1990)‘, but was changed to tidal harbor in 'Project maintaining Master plan for comprehensive development of Pyeongtaek${\cdot}$Dangjin port(2001)'. Accordingly, southern sea bank constructed under the lower part of Seohae-bridge will be removed so that inbound/outbound vessels for the inner harbor can navigate at all times. However, in the view of the safety on passing through the lower of Seohae-bridge, navigating conditions for the inner harbor will be restricted in the single-way of 50,000 DWT vessel and the two-way of vessel less than 30,000 DWT Therefore, this study carried out the estimation of traffic congestion arising from these vessels with above restrictions q[ter supposing annual inbound/outbound vessel's numbers for loading and unloading cargo surveyed on the inner harbor.

A Study on the estimation of traffic congestion for Pyeongtaek (Asan) port development (평택(아산)항 개발에 따른 교통혼잡도 평가에 관한 연구)

  • Kuk, Seung-Gi;Kim, Se-Won;Kim, Jeong-Hoon
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.29 no.1
    • /
    • pp.191-195
    • /
    • 2005
  • The port entry system of the inner harbor in Pyeongtaek (Asan) was planned as lock-gate in 'Master plan project on port planning in Asan industry base(1990)', but was changed to tidal harbor in 'Project maintaining Master Plan for comprehensive development of Pyeongtaek (Asan) port(2001)'. Accordingly, southern sea bank constructed under the lower part of Seohae-bridge will be removed so that inbound/outbound vessels for the inner harbor can navigate at all times. However, in the view of the safety on passing through the lower of Seohae-bridge, navigating conditions for the inner harbor will be restricted in the single-way of 50,000 DWT vessel and the two-day of vessel less than 30,000 DWT. Therefore, this study carried out the estimation of traffic congestion arising from these vessels with above restrictions after supposing annual inbound/outboubd vessel's numbers for loading and unloading cargo surveyed on the inner harbor.

  • PDF

A Single Allocation Hub Network Design Model for Intermodal Freight Transportation (단일할당 복합운송 허브 네트워크 설계 모형 개발)

  • Kim, Dong-Gyu;Gang, Seong-Cheol;Park, Chang-Ho;Go, Seung-Yeong
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.1
    • /
    • pp.129-141
    • /
    • 2009
  • Intermodal freight transportation is defined as the movement of freight from origins to destinations by two or more transportation modes. When implemented in hub networks, it could enhance the efficiency of the networks because consolidated flows are transported by more suitable modes and technologies. In spite of this advantage, the intermodal hub network design problem has received limited attention in the literature partly because of the complex nature of the problem. This paper aims to develop an optimization model for designing intermodal hub networks with sin91e allocation strategy. The model takes into account various cost components of intermodal hub networks including transportation, stationary inventory, and service delay costs. Moreover, using transport frequency variables, it is capable of endogenously determining the transportation economies of scale achieved by consolidation of flows. As such, the model is able to realistically represent the characteristics of intermodal hub networks in practice. Since the model Is a complicated nonlinear integer programming problem, we perform model simplification based on the analytical study of the model, which could facilitate the development of solution algorithms in the future. We expect that this study contributes to the design of intermodal hub networks as well as to the assessment of existing logistics systems.

Optimization of GEO-KOMPSAT-2 Apogee Engine Burn Plan (정지궤도복합위성 원지점엔진 분사계획 최적화 연구)

  • Park, Bongkyu;Choi, Jaedong
    • Journal of Aerospace System Engineering
    • /
    • v.10 no.4
    • /
    • pp.90-97
    • /
    • 2016
  • GEO-KOMPSAT-2A and GEO-KOMPSAT-2B are under development by KARI to replace the COMS mission, and will be launched in 2018 and 2019, respectively. GEO-KOMPSAT-2 will be launched and injected into the GTO (Geostationary Transfer Orbit) by the Ariane V launcher. Once injected into the GTO, the satellites are transferred to the drift orbit by applying a series of apogee engine burns. The burn epoch time, duration, and intervals are selected such that the satellite is placed closest to the target drift longitude, or at the drift start longitude. For GEO-KOMPSAT-2, four or five LAE (Liquid Apogee Engine) burns will be applied for drift orbit injection. This paper establishes the GEO-KOMPSAT-2 LAE burn plan, considering predefined constraints and adjustments, taking into account the perturbing forces. Two approaches have been analyzed: the first is a single shot approach, whereas the other is an iteration based optimal solution. Optimal solution has been obtained using the Focusleop, a geostationary satellite LEOP tool.

Projecting Water Balance for the Han River Basin Considering Climate Change Uncertainty (기후변화의 불확실성을 고려한 한강유역의 물수급 전망)

  • Seo, Seung-Beom;Kim, Young-Oh;Lee, Jae-Kyung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.30-30
    • /
    • 2011
  • 현재 우리나라는 수자원의 안정적인 확보와 효율적인 관리를 위하여 20년 단위의 수자원장기 종합계획을 수립하고 있으며, 향후 발생가능한 물의 과부족을 평가하는 물수급 분석을 통해 최적의 수자원관리 계획을 수립하고 있다. 하지만, 현재의 수자원장기종합계획에서는 미래 물수급 전망을 단일 값으로 제시하는 확정론적 기법을 적용하고 있으며, 과거 유출패턴이 미래에도 똑같이 재현된다는 가정 하에 물수급 분석을 수행한다. 이는 기후변화의 불확실성에 따른 물공급 시나리오의 다양성을 고려하지 않는 것을 뜻하며, 현재 다양한 GCM(Global Circulation Model)을 통해 제시되고 있는 미래 수자원 변동 전망을 물수급 분석에 반영하지 않고 있음을 말해 주는 것이다. 따라서, 본 연구에서는 기후변화에 따른 미래 자연유출량의 불확실성을 반영할 수 있는 물수급 전망 기법을 제안코자 한다. 먼저 국내유역에 적합한 GCM 시나리오들을 선정하였으며, 스케일상세화(downscaling) 기법을 통해 한강유역 중권역별 강우량, 증발산량 등의 일 단위 미래 수문기상 자료를 구축하였다. 다음으로, 앞서 구축한 기상자료를 개념적 강우-유출 모형인 TANK 모형에 입력하여 중권역별 미래 유출량을 산정하여 각 시나리오별 미래 유출량 변화를 전망하였다. 물수급 분석 모형으로는 한국건설기술연구원에서 미국 SEI-B와 제휴하여 개발한 통합수자원평가계획모형인 K-WEAP을 사용하였으며, 물수급 분석 결과를 바탕으로 중권역별 물공급 지수를 산정하여 제시하였다. 현재 대부분의 기후변화 연구에서는 GCM 시나리오를 직접 적용한 결과를 바탕으로 미래 수자원 전망 결과를 제시하고 있는데, 여기에는 GCM 자체의 불확실성은 물론 과거 관측 자료를 입력자료로 하는 기존 연구 방법론으로 부터의 급진적인 변화에 따른 연구 연속성의 문제 또한 존재한다. 따라서 본 연구에서는 GCM 유출량 시나리오의 직접 적용 대신 과거 유출 시나리오별 가중값을 산정하여 반영함으로서 GCM 모의 결과의 불확실성을 저감하는 방안을 제안하였다.

  • PDF

Development of Selection Criteria of Small Scale Reservoirs for Emergency Action Plan(EAP) Establishment (소규모 저수지 비상대처계획(EAP) 수립 선정지표 개발)

  • Park, Ki-Chan;Choi, Kyung-Sook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.394-394
    • /
    • 2019
  • 본 연구에서는 최근 기상이변의 영향 및 지진 발생과 저수지 노후화 등으로 지속적으로 발생되고 있는 소규모 저수지 붕괴에 의한 재해 위험성을 경감하고자 댐 저수지 EAP 수립 기준 이하 소규모 저수지를 대상으로 EAP 수립 대상여부를 판단할 선정지표를 개발하였다. 기존의 EAP 수립지침 검토, 과거 붕괴사례 분석, 관련분야 선행 연구 등을 분석하여 저수용량, 제체높이, 경과연수, 호우인자 및 지진인자를 포함하는 5개 선정지표를 정량화 하여 제시하므로 실무적용을 용이하게 하고자 하였다. 또한 개발된 선정지표는 EAP 수립 기준 이하 소규모 저수지에 적용하기에 앞서 각 선정 지표별 저수지 붕괴와의 연관성을 파악하기 위해 과거 저수지 붕괴사례에 단일지표 및 지표간 중첩도를 파악해 보았다. 그 결과, 지진인자, 호우인자, 지진 및 호우인자, 경과연수 지표순 순으로 저수지 붕괴와 높은 연관성을 나타내어, 소규모 저수지 붕괴에 연관되는 주요 지표를 지진인자, 호우인자, 경과연수로 선정하였다. 본 연구에서 선정된 지표간의 중첩정도를 파악하기 위해 과거 저수지 붕괴사례에 적용해 본 결과 호우인자+지진인자가 가장 높은 중첩도를 나타났다. 다음으로 본 연구를 통해 도출된 EAP 수립 대상 선정지표 중 주요 지표인 지진인자, 호우인자, 경과연수를 대상으로 2개의 지표가 중첩될 경우와 3개의 지표가 중첩될 경우를 EAP 수립 대상 관찰그룹과 검토그룹의 각각 분류한 후 이를 재해위험 저수지(MOIS, 2016)에 적용하여 보았다. 그 결과, EAP 수립 대상 관찰그룹에 속하는 경우가 38.5%를 차지하였고, 검토그룹에 속하는 경우가 11.9%를 차지하였다. EAP 수립 대상 관찰그룹에 해당하는 저수지에 대해서는 전문 시설관리자에 의한 주기적 점검 및 계측기 설치를 통한 모니터링 실시 등으로 세심한 시설물 관리가 필요할 것으로 판단되며, EAP 수립 대상 검토그룹에 해당하는 저수지에 대해서는 제체 하류부 구간의 주민 거주 현황, 경작지, 축사 등 재산 현황 및 EAP 수립에 소요되는 예산 등을 종합적으로 고려하여 저수지 관리기관에서 최종적으로 EAP 수립 여부를 결정하여 잠재적인 피해 발생을 사전에 저감시켜야 하겠다. 본 연구의 결과는 기존의 EAP 수립 기준의 보완책으로 활용 가능할 것으로 사료된다.

  • PDF