KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.5D
/
pp.839-848
/
2006
Korea has become the 5th country to own and operate the high speed railroad in 2004. However, there were many difficulties until Koreans enjoy the first bullet train service with the average hourly speed of 300km. The high speed railroad requires elevated quality standards differently from the traditional railways. In addition to the technical difficulties, the construction project itself was an unpleasant case with huge delays and cost overruns mainly due to the lack of experiences, deficiency of owner$^{\circ}{\O}$s role, and increase of public resistances triggered by environmental concerns. This paper analyzes the reasons for delays on this mega-project. With respect to the characteristics of the whole project level, it is very complicated/linear project, whose total length is around 412 km with the composition of various sections in the route of the railway which have basically different conditions. For that reason, the analysis is performed in both macro and micro level. First, macroscopic analysis is performed to find critical subdivisions in the railway route that induces the significant delay in the opening due date. Then, microscopic analysis is followed to quantify the causes and effects of delays focused on these critical subdivisions in more detailed way. Finally, this paper provides lessons learned from this project to avoid the decisive delays in performing the similar large-scaled projects.
Kim, Jong Bum;Woo, Sang Hee;Jang, Hong-Ryang;Chou, Jin-Won;Hwang, Moon Se;Park, Hyung-Koo;Yoon, Hwa Hyeon;Jung, Joon-Sig;Bae, Gwi-Nam
Journal of the Korean Society for Railway
/
v.20
no.1
/
pp.11-19
/
2017
Since operation of railway trains is a major source of particle pollution in tunnel air, a particle removal device can be an effective measure to remove wear particles. To obtain design conditions of the particle removal device that will be installed underneath the railway trains, the wind speed and particle concentration underneath the trains were investigated using a three-dimensional ultrasonic anemometer and a DustTrak aerosol monitor, respectively. The measurements were made for the trains running on Seoul Metropolitan Subway Line 5 on February 10, 2015. The data were analyzed according to the track geometry (straight, curved) and train speed pattern (acceleration, cruising, and deceleration) between stations. Train speed was also analyzed. The average wind speed and $PM_{10}$ concentration underneath the trains were ~30% of the train speed and ${\sim}200{\mu}g/m^3$ for both straight and curved sections. Average $PM_{10}$ concentration for deceleration sections was higher than that for acceleration sections.
Journal of Korean Tunnelling and Underground Space Association
/
v.21
no.6
/
pp.795-810
/
2019
In this paper, The study was conducted on the method to roughly determine the area and length of the multi-utility tunnel before the planning and design phase of the multi-utility tunnel construction. For this purpose, four feasibility indexes were used: traffic density, population density, disaster prevention index (number of workers), and urbanization rate, which reflect the regional characteristics. The installation criteria were set in consideration of the average value and minimum value of the feasibility indexes for the tunnel type among areas that can be installed in the multi-utility tunnel of Seoul. The analysis area included 200 areas based on 14 zones. The results of the analysis based on the minimum value of feasibility indexes indicated that the tunnel type of multi-utility tunnel is suitable for 39 areas with high traffic volume and population. On the other hand, the 'gun' area, etc., has a wider population than the 'si' and 'gu', suggesting that it is not suitable to install multi-utility tunnel. In addition, it can be seen that the larger the index value centered on the minimum value of each index, the smaller the tunnel type of multi-utility tunnel installation area.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.8
/
pp.407-416
/
2020
North Korea's demand for infrastructure construction and maintenance is growing rapidly. On the other hand, the number of skilled workers is insufficient. Therefore, through a survey of North Korean defectors, this study analyzed the status of construction technology and the difficulties of construction workers. In addition, an attempt was made to derive an appropriate education and training program process and operation plan. As a result of the survey, the reason for the low technical level of construction workers was the lack of skills, lack of motivation to work, and the lack of training and management systems. The appropriate education and training period was 56% of the total response within one year and 36% within six months. Based on the results of this survey, the period of education and training for the rapid training of construction technical personnel in North Korea was adopted as one year. Moreover, compared to the NCS standard in South Korea, appropriate training hours were suggested, excluding training courses, such as planning and design, construction management that require specialized knowledge. Finally, the curriculum corresponding to the education and training courses and the standards for facility names and required areas for facility operation were suggested.
The purpose of the study is to develop a educational data in order for students to perform geologic field survey effectively by themselves. A area around the Duta Mountain is selected. which is located at the southeastern part of Eumsung sedimentary basin because various rock types and geologic structures are well shown in this area and also it is convenient to reach there. Thirteen stops for observation are chosen m a route f3r exercising field geologic investigation. Data for field research are given and described in detail from each stop for observation. To do this, students make their own route map using general or digital geographic map and aerial photo is added to know relationship between large-scale structure and different rock types regionally. Moreover, it is designed to minimize conflict factors that may be experienced from the real field survey by showing outcrop photographs and polarizing photomicrographs of rut samples related to each stop and geologic structures. The attitude of students is investigated with the data of field geologic survey for students of an Earth Science class in the College of Education in Chungbuk National University. The results indicate that the educational data for geologic field survey brought positive changes that greatly help students perform field survey in definitive side, especially formation of absolute concepts on earth science.
No, Seon-Sik;Kim, Su-Hyeon;So, Won-Ho;Kim, Yeong-Cheon
Journal of the Institute of Electronics Engineers of Korea TC
/
v.37
no.6
/
pp.1-11
/
2000
In this paper, we propose a novel control signaling protocol that efficiently controls connection setup and increases the utilization of network resources. The proposed protocol, Separated Control Signaling Protocol(SCSP), separates bearer control from call control lot WDM optical networks. The main function of call control is to check the availability of network resources such as wavelengths and receivers at destination node. Bearer control is to reserve and assign wavelengths. The signaling architecture of this protocol consists of call controller and hearer controller The call controller handles call setup and release, activates the beater controller, and manages the status of call and bearer. The bearer controller reserves wavelengths, sets up bearer, tears down bearer. and notifies the status of beater to call controller. The state transition diagrams of each controller are designed. Using control messages and related primitives, the information flows for call setup and bearer setup, hearer teardown and call release, and reaction for setup failures are described to evaluate the performance. The simulation results show that the separated control signaling protocol is superior to conventional one in terms of call blocking probability and resource utilization.
Journal of the Institute of Electronics Engineers of Korea TC
/
v.37
no.1
/
pp.12-22
/
2000
This paper presents the window-based permit distribution scheme for efficient medium access control to support multiclass traffic in APON(ATM over passive optical network). The proposed MAC protocol considers the characteristics of QoS(Quality of Service) for various traffic classes. A periodic RAU(request access unit) in upstream direction, includes dedicative request fields for each traffic category within the request slot. The transmission of upstream cell is permitted by the proposed window-based spacing scheme which distributes the requested traffic into several segments in the unit of one spacing window. The delay sensitive traffic source such as CBR or VBR with the stringent requirements on CDV and delay, is allocated prior to any other class. In order to reduce the CDV, so that the permit arrival rate close to the cell arrival rate, Running-Window algorithm is applied to permit distribution processing for these classes. The ABR traffic, which has not-strict CDV or delay criteria, is allocated flexibly to the residual bandwidth in FIFO manner. UBR traffic is allocated with the lowest priority for the remaining capacity. The performance of proposed protocol is evaluated in terms of transfer delay and 1-point CDV according to various offered load. The simulation results show that our protocol has the prominent improvement on CDV and delay performance with compared to the previous protocol.
Transactions of the KSME C: Technology and Education
/
v.3
no.3
/
pp.165-173
/
2015
This paper presents numerical results of static structural stability analysis in development of a vertical transfer device of a PRT(Personal Rapid Transit) vehicle. The vertical transfer of a fully occupied vehicle operating on a road network is the first attempt, which is expected to contribute to overcome the limitations of conventional 2-dimensional operation mode. In particular, the vertical transfer apparatus designed based on vertical circulating conveyors is capable of continuous transfer without time delay so that it enables to accommodate a high traffic density. This system has been frequently used in a logistics field; however, it is essential to assess a structural integrity because an external force by a vehicle weight is exerted on the conveyors in the form of a concentrated load unlike a conventional logistic transport. In this study, prior to the production process, the structural performance of the pilot design in an early stage is numerically evaluated using the commercial finite element method (FEM) solver (i.e., $Ansys^{(R)}$).
Excepting tunnel of dorimstream - ccachimountain station section, the subway line No.2th section was build using ASSM and NATM methods because of soil pressure and land condition. The way of dealing underground water was selected without sufficient preconsideration of geographical features, ground condition, influence of lowing underground water, and long-term cost of running maintenance so that the form of undrained tunnel was build having decreased construction characteristics and technically improper elements. The form of partial drainage is very difficult to manage structures of tunnel, because water leakage, water pressure causing cracks of lining concretes and scaling are constantly happened. so partial drainage suggest that setting reinforced Anchor Bolt to prevent buoyancy and should increase center drainage way up to height of railroad. Partial drainage suggest that holey pipe(${\phi}$350mm) manhole, drainage checking pipe manhole are should be regularly dredged, when changing roadbed(gravel${\rightarrow}$concrete) drainage checking pipe manhole should be build and setting a limitation of entering underground water's quantities. Beside drainage degree in changed section of structures causing instability of structures is continuous degree. so if efficient drainage way and the patterns of flaws, problems are considered in survey, it will be expected to have a advantage condition in maintenance part.
Journal of Korean Tunnelling and Underground Space Association
/
v.14
no.5
/
pp.503-516
/
2012
Rock mass rating (RMR) is the key factor when designing the appropriate support pattern of tunnel projects. Borehole drilling is usually performed along the tunnel route in order to determine the rock mass rating to be used for tunnel design. The rock mass rating at the non-boring region between boreholes is usually assessed through geophysical surveys such as electrical prospecting, seismic prospecting, etc. Many studies were carried out to find out the correlation between electrical resistivity and rock mass rating. However, most researches were aimed at obtaining the relationship between the two parameters utilizing experimental results obtained from laboratory tests or electrical prospectings. In this paper, efforts were made to analyze and obtain relationships between the electrical resistivity obtained from in-situ electrical resistivity logging data and the rock mass rating. Correlation studies using field data showed that the electrical resistivity is highly correlated with the rock mass rating with the determination coefficient more than 90%. The correlation analysis was also carried out between RMR classification parameters and the electrical resistivity. It was shown that the correlation between the condition of discontinuities and the electrical resistivity was very high with the determination coefficient more than 80%; that between the groundwater condition and the electrical resistivity was very low with the determination coefficient less than 57%.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.