• Title/Summary/Keyword: 노무관리

Search Result 218, Processing Time 0.024 seconds

Integrated Manpower Information Systems on Construction Site - Using RFID and QR-Code - (RFID와 QR-코드를 활용한 건설현장 통합노무정보관리 효율화 체계 구축)

  • Choi, Yun-Gil;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.106-116
    • /
    • 2011
  • It is very important to collect and manage labor information in the construction industry that is labor-intensive. Although research and cases that utilize RFID are increasing for more effective labor management, labor management is limited to the checking-in and -out information management at the entrance of a construction site due to high expense of an RFID reader. Labor and safety information is still managed based on the redundant process that is hand-written in a book and re-input of information by using a personnel-computer. Therefore, the objective of this paper is to develop more effective and efficient process for labor information record and management. This paper presents a prototype application that supports integrated labor information management by incorporating QR-code into RFID-based labor management system and verifies the application through a pilot test and comparison with the existing labor management syste.

노무관리-건설공사 노무제도 및 실무(4)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.2 s.211
    • /
    • pp.71-74
    • /
    • 2008
  • 대한설비건설협회 전국 시·도회는 최근 개정, 시행되고 있는 건설 노무관련제도와 국민연금.건강보험 사후 정산제 등 사회보험 실무에 대해 회원사들의 이해를 돕기 위해 노무강습회를 실시했다. 이 강습회에서 서울특별시회 자문 노무사이자 노무법인 한길 본사 대표인 신흥식 노무사가 사회보험실무와 최근 개정 시행 중인 노무제도 등을 강의하고 질문과 답변을 통해 그동안 회원사들이 궁금해 했던 내용을 설명했다.

  • PDF

Comparison of Labor Inputs from Standard Quantities per Unit and Actual Quantities in Apartment Reinforced Concrete Work (공동주택 골조공사의 표준품셈 노무량과 실투입 노무량 비교)

  • Jeon, Sang-Hoon;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.182-189
    • /
    • 2008
  • In private and public construction works, cost estimation and site productivity management are based on designed labor quantities calculated by the Standard Quantities per Unit (SQU). The designed labor quantities are regarded as the basis for insurance costs and safety and environmental costs and also affect the progress measurement of construction works. Even though the designed labor quantities from the SQU has been considered to be different from actual labor quantities put to construction works, there is no research that empirically analyzes the statistical differences. This study analyzes actual labor quantities of form workers, steel-bar fabricators, concrete pourers in reinforced concrete works of the 43 apartment projects, and compares the actual labor quantities to labor quantities from the SQU. It goes further to scrutinize the critical reasons underlying the differences through a survey on 65 practitioners and interviews with 32 site managers and supervisors. The regression models of labor quantities of the apartment concrete work produced by the present study will contribute to reasonable construction contracts based on the past actual costs and practical site management by the actual labor quantities.

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF